Statement_of_Work.pdf

PDF 125 KB Posted

Attached to
Tree Removal
Solicitation number
F2B3AQ9015A001
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Questions_and_Answers_Trees.docx DOCX document
AMENDED-Statement_of_Work(SOW).docx DOCX document
(AMENDED)Combined_Synopsis-Tree_Removal.pdf PDF
Combined_Synopsis-Tree_Removal.pdf PDF
67470.pdf PDF
67458.pdf PDF
67471.pdf PDF
67459.pdf PDF
Wage_Determinations.pdf PDF
Bid_Schedule.pdf PDF
67469.pdf PDF
67468.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

For

Remove Trees Location Building: Multi

By: Lenore Gerossie

WORK ORDER NUMBER: 67458, 67459, 67468,67469,67470,67471

DATED: 17 December 13, 2018

1. GENERAL INFORMATION:

This project is intended to remove trees in accordance with all applicable National, Air Force, State and local building codes and regulations. This work will consist of supplying/furnishing all labor, materials, tools, equipment, shop drawings, and expenses necessary to accomplish the work described below in compliance with the Commonwealth of Massachusetts Building Code and Massachusetts General Law requirements, state and federal codes, base standards and manufacturer’s instructions. Where there is a conflict between nationally recognized codes and local codes, the most stringent shall apply. Effective immediately: Due to safety concerns the use of manhole fixed ladders on Hanscom AFB for the purpose of entry or egress is prohibited. The use of an alternative means of entry/egress (i.e. appropriate portable ladder/personnel lowering device) is authorized.

2. SCOPE: Remove Trees

Work Order 67458 Remove large oak tree located at the NE corner of building 1603 Tree is approximately 20-30 feet tall Tree is a twin oak that has a vertical split approx. 7 feet up from base Grind stump to a depth of 6 inches Level area where stump was removed to match landscaping Loam and seed area where tree was removed See attached photo for reference Dig Safe is required for this project Work Order 67459 Remove large tree leaning over the Shawsheen River and walk path in Castle Park Tree is approximately 20 feet tall See attached picture for reference Grind stump to a depth of 6 inches Level area where stump was removed to match existing landscaping Loam and seed area Dig Safe is required for this project Work Order 67468 Tree is located on the embankment of the Shawsheen River on the school side of the bridge Tree leans over the river and the bridge to the Primary School

See attached picture for reference Tree is approximately 20 feet tall Grind stump to a depth of 6 inches Dig Safe is required Work Order 67469 See attached picture for reference Pine tree is approximately 90 feet tall Tree is located in a grove of trees Grind stump to a depth of 6 inches Level area where stump was removed to match existing landscaping Loam and seed where stump was removed Dig Safe is required for this project Work Order 67470 Remove 2 dead pine trees located at the top pf Marrett St. and Gate 2/2A Trees are located right next to the gate and electric pole Trees are approximately 30 feet tall See attached picture for reference Dig Safe is required for this project Grind stumps to a depth of 6 inches Loam and seed area where trees were removed Work Order 67471 Remove tree located near walkway at Castle Park See attached picture for reference Tree is approximately 40 feet tall Dig Safe is required for this project Grind stumps to a depth of 6 inches Loam and seed area where tree was removed

3. GENERAL REQUIREMENTS:

Work includes, but is not limited to the following:

a. Provide resolutions of any technical problems that arise during the construction.

b. Should any change in scope be required, it must be coordinated with the Project POC and approved as a change order prior to performing the change in work.

c. Provide updates to Project POC. Any construction issues, changes to schedule, or schedule slippages with justification must be reported at the periodic updates.

d. The Contractor is solely responsible for compliance with the Occupational Safety and

Health Act of 1974 (OSHA) and the protection of their employees and all sub-contractor employees. In performing work under this contract on a Government installation, the contractor shall report any accidents involving Air Force property/equipment damage, or contractor personnel injuries occurring on the job or an accident resulting in death, injury, occupational disease, or adverse environmental impact to the contracting officer within five days.

e. Complete the “builder data inventory and assessment sheet” for newly installed assets, ensuring the bar code number is attached to the new equipment. Transfer bar codes from any removed equipment to the builder assessment ½ sheet form

f. Provide three (3) copies of O & M manuals and warranty letter

g. Period of Performance 90 days after award of contract

4. ADMINISTRATION:

POC: Lenore Gerossie Phone Number. (781) 225-2960 Alternate POC: Roland Hartz Phone Number. (781) 225-5924