Q&A_Final.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Oil Water Separators Federal contract opportunity
Solicitation number
F2B3AQ8110A008
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Oil Water Separators, newest first.
File Type Posted
OWS_Appendix_A_v.1_Updated_20_Jun_18.DOCX DOCX document
2018_Oil_Water_Separator_PWS.DOCX DOCX document
OWS_Appendix_A_v.1.DOCX DOCX document
OWS_PMTL.xlsx XLSX spreadsheet
Combined_Synopsis_Solicitation.docx DOCX document
2018_OWS_Bid_Schedule.xlsx XLSX spreadsheet
HMOP_Change_9_2016.pdf PDF
WD_15-4047_(Rev.-7).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contractor QuestionGovernment Response
1Are all buildings listed on Appendix A to be included in the bid?Yes, all buildings listed on Appendix A are included in the bid.
2Does the Government have a specific testing lab to be used or recommended?No, the Government does not have a specific testing lab to be used, nor do they recommend one.
3Can all cleanings be arranged to be completed at the same time period?Yes, all cleanings can be arranged to be completed at the same time period.
4Is there a current contract performing this type of work? If so, what is the contract number and who is the incumbent Contractor?The incumbent contract is FA2835-15-P-0039 with Your Environmental Solutions, Inc. It was awarded for $56,700.00.
5Are there any pumps, grinders, disconnects, etc. associated with the separators?No, there are no pumps, grinders, disconnects, etc. associated with the separators.
6Does each separator need to be sampled prior to scheduling the cleaning? If so, how far in advance must the sampling be done?Yes each separator needs to be sampled prior to scheduling the cleaning. The sampling should be performed approximately one month before cleaning, to allow time for sampling to be reviewed by Hanscom enviromental personnel.
7Are Contractors responsible for providing water for rehydration?Yes, Contractors are responsible for providing water for rehydration.
8Will there be another opportunity for a site visit at Hanscom?No, there will not be another site visit opportunity.
9The PWS states the contract is expected to require entry into confined spaces and that units over 1,000 gallons must be entered to clean appropriately. Is this strictly a size consideration or is this requirement due to unique configurations limiting access?This is a strictly a size consideration.
9aWill the systems located near buildings 1302E, 1642 MP North, 1707, and 1994 require entry?Yes, the systems located near buildings 1302E, 1642 MP North, 1707, and 1994 will require entry.
10Is the Child Development Center a 16,000 gallon OWS or is it a grease trap? What is it used for?Yes, the Child Development Center is a 16,000 gallon OWS.
11Are there any lids, grates, or manways that require more than manual lifting for removal? If so, will the base provide mechanical lifting equipment?Only Building 1201 OWS requires mechanical lifting equipment. The base will provide mechanical lifting support for this location.
12Are the most recent analytical results for existing units available?Yes
13Is the 18,000 gallon unit located at 1302I an OWS with a working capacity of 18,000 gallons or is the total volume similar to Hanger fire suppression systems overflow tanks?Yes, the 18,000 gallon unit located at 1302I is an OWS with a working capacity of 18,000 gallons.
14Do the troughs listed in Appendix A have bolted lids or grating?They have grating.
15What are the dimensions of the trough for Building 1700 BITS?The dimensions of the trough for Building 1700 BITS are 50 feet long X 12 inches wide X 10 inches deep.