PWS_Steam_Trap_Maintenance__8_1_16.pdf

PDF 72 KB Posted

Attached to
Steam Traps Maintenance Federal contract opportunity
Solicitation number
F2B3AQ6182A016
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Steam Traps Maintenance, newest first.
File Type Posted
FA2835-16-C-0012_FBO_Award.pdf PDF
FINAL_Steam_Traps_Combined_Synopsis.pdf PDF
Amended_PWS_Steam_Trap_Maintenance.docx DOCX document
FINAL_Combined_Solicitation.pdf PDF
2016_List_of_17_MH_ _Mech_rooms2.pdf PDF
Wage_Determinations_R19.pdf PDF
8-29_CORRECTED_REVISED_Steam_Traps_Combined_Synopsis.pdf PDF
2016_Bid_Schedule_Maintenance_and_Testing_of_Steam_Traps.pdf PDF
Hanscom_AFB_Fulll_Trap_Listing_2016.xlsx XLSX spreadsheet
2016_List_of_49_vaults_JBs2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK

STATEMENT

FOR

MAINTENANCE DURING SEMI

ANNUAL STEAM OUTAGE

PREPARED BY:

66 CES/CEOES

1 August 2016

SECTION 1

DESCRIPTION OF SERVICES

1.1. Scope: The contractor shall provide all management, labor, tools, equipment, test equipment, supplies, Personal Protective Equipment, materials, parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA, to perform repair and annual maintenance to the equipment within the steam junction boxes base-wide. The contractor shall be responsible for ensuring all services and parts provided under this contract are in accordance with the terms and conditions outlined herein and conform to the manufacturer’s equipment specifications and this Performance Work Statement (PWS).

1.2. Requested Service: The contractor shall maintain all equipment at steam junction boxes base-wide, per the manufacturer’s recommendations and industry standards. The contractor shall repair/replace the traps found to be malfunctioning. The contractor shall inspect the runs of piping approaching the junction boxes for steam leaks and document findings. The contractor shall also provide photo documentation of all of the equipment in each of the spaces.

1.2.1. The contractor shall be responsible for all coordination required to access this equipment.

This includes coordination with the contractor responsible for the removal of trench concrete covers, installation of temporary fencing, reinstallation of covers, replacement of broken concrete slabs if broken during the course of the work, and installation of stainless steel plugs (to match existing) for lifting points.

1.2.2. The contractor will be responsible for performing all work without disrupting service. In order to meet this requirement, the exercising and greasing of the steam valves will need to occur during the semi-annual steam outage. It should be noted that the fall outage for 2016 is tentatively scheduled for 9/17/16 and 9/18/16. The spring outage will be scheduled for 4/15/17 and 4/16/17. The intent is to complete the items in the bid schedule annually.

1.2.3. The contractor shall repair/replace all malfunctioning traps identified in the attached reports (excluding pump traps), per manufacturer’s, U.S. Air Force, industry and related standards.

1.2.4. This work includes performing annual testing and maintenance of the steam traps to ensure that they are functioning properly. The traps are located as indicated in the bid schedule and attached reports. Included is a Hanscom base map showing the locations of the manholes and junction boxes. Maintenance should be per manufacturer’s recommended procedures and industry standards. Before performing maintenance, the contractor shall submit a test procedure for each type of trap for government approval. All repairs shall be made before testing occurs to ensure repaired traps are functioning.

1.2.5. The contractor shall submit a report outlining what equipment was maintained, what maintenance was performed, the location of the equipment and any deficiencies discovered.

Provided in this package are the reports from the last two maintenance shutdowns to use as guides for the typical report format.

1.2.6. The contractor shall perform four (4) hours of hands-on training with operators on trap testing. Training shall include testing techniques for all types of traps using both thermal and ultrasonic methods.

1.2.7. Confined Space: This contract has the potential for entry into confined space areas.

Steam junction boxes are considered confined space. Permit required confined space areas will require, IAW AFI 91-203, The U.S. Air Force Mishap Prevention Program, and AFFARS Clause 5352.223-9001, Health and Safety on Government Installations, a pre-brief prior to the start of any service which includes the contractor, COR, Safety Office and Fire Department. It is the contractor’s sole responsibility for compliance with OSHA (Public Law 91-956). The pre-brief will inform the contractor of any known hazards and the contents of the space.

Additionally, the contractor will be briefed on precautions and procedures implemented by 66 ABG/CE to protect Air Force workers. The Fire Chief will coordinate the confined space entry contract and either approves or disapproves use of the rescue team supplied by the installation FES Flight. At the conclusion of the contract, an after-action brief will be required where the contractor will provide information regarding hazards encountered or created in the space(s).The COR will contact the CO and ABG/SE immediately if an unsafe act or procedure is performed by the contractor.

1.3. Quality Assurance: According to the contract’s inspection clause, the government will evaluate the contractor’s performance under this contract. The COR is a representative of the Contracting Officer (CO) and will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO. All services to be performed by the contractor will be subject to review by the CO or COR. The contractor shall provide an answer to a submitted Corrective Action Report (CAR) and Customer Complaint Form from the COR within one (1) working day from receipt. The contractor shall provide written response addressing the root cause, corrective action and preventive actions (s).

1.4. Continuation of Essential Services during Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as define in DFARS Clause 252.237-7023.

1.5. Hours of Operation: The contractor shall perform work Monday thru Friday, under this contract during the following hours: 07:30 a.m. until 4:00 p.m., excluding Federal Holidays.

Work required to be performed outside of these hours shall only be done after approval from the contracting officer.

1.5.1. HOLIDAYS. Hanscom AFB recognizes the following holidays:

New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May

Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.

1.6. Contractor Personnel: The contractor shall designate in writing the name of the Contract Manager (CM) and any alternate(s) who shall act for the contractor when the manager is absent and their telephone numbers where they may be contacted any time to the CO and the COR within five (5) calendar days after contract award. The CM or alternate shall have full authority to act for the contractor on all matters relating to operation of this contract at Hanscom AFB.

The CM or alternate shall be available to meet on the installation with government personnel designated by the CO to discuss problem areas.

1.6.1. Listing of Contractor Employees: The contractor shall provide a CM who can read, write, speak, and understand English fluently. The contractor shall provide an initial listing of contractor employees’ names and position titles to CO and COR prior to contract start date.

The contractor shall also provide an updated listing of personnel to the CO and COR within ten (10) work days when employees affecting the work of this contract have a status or position change.

1.6.2. The contractor shall not employ persons on this contract if such employee is identified to the contractor as a potential threat to the health, safety, security and general wellbeing or operational mission of the installation and its population. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities. The contractor shall be prohibited from employing off-duty COR’s who are serving any contracts/subcontracts awarded to the Contractor. All contract employees depending on particular condition, occasion or place, or job assignment shall require professional, suitable attire. All contractor employees shall conduct themselves in a professional, courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor employees in performance of this PWS shall be the responsibility and prerogative of the contractor; however, the contractor shall comply with the requirements set forth in this PWS and Hanscom AFB regulations concerning conduct of employees as referenced herein. The contractor shall employ and maintain a technically trained and experienced work force.

1.7. Environmental Protection and Safety: The contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations and requirements regarding environmental protection and occupational safety and health. The contractor shall comply with any laws or regulation changes during the term of this contract. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness and materials handling (including hazardous materials).

1.8. Hazardous Material (HAZMAT): The contractor shall not store chemicals/HAZMAT on Hanscom AFB. All chemicals/HAZMAT shall be approved prior to being transported on base for use by any contractor. The contractor shall prepare and submit to the COR, ten (10) calendar days after contract award date, one (1) each, Chemical/Hazardous Material Request Authorization Form (Air Force Form 3952) and Safety Data Sheets (SDS) for each chemical, material and substance proposed to be used in performance of this PWS. The QAE will forward the completed AF Form 3952(s) and SDS to 66 ABG/CEIE for approval. The contractor shall not transport or use any chemical, material or substance on Hanscom AFB before written approval is provided by 66 ABG/CEIE. Contractor shall maintain copies of MSDS(s) for all chemicals. The SDS(s) shall correspond with the manufacturers of the chemicals on hand. Manufacturer, material, and MSDS shall match. NOTE: SDS refers to manufacturer SDS. Once material is approved for use, contractor shall contact base Environmental Management (EM) (66 ABG/CEIE) and provide a list of all material. 66 ABG/CEIE shall determine any additional material requirements based on the hazard code of the material.

1.9. Hazardous Waste: Contractor shall dispose of any spent/processed chemical solutions and used rags in waste drums located in the shop/area where the work is being performed.

1.10. Discharges: Any discharges into industrial waste treatment plant (IWTP) or sanitary sewer shall be done in accordance with Hanscom Industrial Waste Water Discharge Permit as instructed by 66 ABG/CEAN. The contractor shall maintain records of written authorization issued by 66 ABG/CEAN for discharges into IWTP and sanitary sewer.

1.12. Spills: Upon occurrence of any spills that could enter the storm system or cause any harmful environment effects, the contractor shall immediately call 911 to report the incident.

When possible, the contractor shall use a base telephone to receive help from Hanscom AFB

911. If using a cell phone, request Hanscom AFB 911. The contractor shall report all environmental violations to the COR. The contractor shall submit a typed or written report about the incident within four (4) clock hours. The contractor shall provide five (5) copies of the written report. The contractor shall provide one copy to the CO, two copies to the COR, a copy for Unit Environment Coordinator (UEC) and a copy for record. The format of the report shall be left up to the contractor, but the report shall contain the following information.

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and the rate of discharge 6.) Any damages or injuries involved

7.) Extent of the area impacted 8.) Potential hazards 9.) Action taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g., human error, equipment) and whether 911 was called and which agencies responded.

1.13. Environmental and Safety Training: The contractor personnel shall have Resource Conservation Recovery Act (RCRA) environmental and safety training required by the state and federal government. The training shall be IAW the following regulations: Resource Conservation Recovery Act (RCRA) 40 Code of Federal Regulation (CFR) 265.16 “Personal Training”, Occupational Safety and Health Administration (OSHA) Hazardous Waste Operations and Emergency Response Standard Title 29, CFR Part 1910.120 “Hazardous Waste Operations and Emergency Reponses”, Hazardous Waste Management Instruction, Section 13, and Air Force Instruction (AFI) 32-7042, “Solid and Hazardous Waste Compliance”, The contractor shall provide the environmental and safety training certificate for all employees to the CO and COR, after contract award date.

1.14. Forms and Publications, TO, AFI and AFMCI: The contractor shall obtain the forms and publications expressly required to perform the work in this contract via internet at www.e-publishing.af.mil In the event that a form or publication is not available online, the COR will provide the form, instruction, or publication to the contractor upon written request (e-mail is acceptable) by the contractor. In the event that laws, regulations, TO’s, AFI, AFMCI’s change during the term of this contract, the contractor is required to comply as such changes come into effect. Contractors delivering or handling official USAF records shall comply with the applicable records management regulations AFI 33-322, Air Force Manual (AFMAN) 33-363, and AFI 37-138 (in their entirety).

1.15. Housekeeping: The contractor shall keep the work areas clean and neat in accordance with Industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS.

1.16. Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops including Ramp areas, the contractor shall comply with AFI 21-101_AFMC Sup 1, 21-101, Chapter 10 (all paragraphs). The contractor or contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (i.e. tool or job box or tool bag).

The COR will report to appropriate government personnel of any missing contractor’s tool(s) not located within one hour after notification of lost or missing tools.

1.17. Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Hanscom AFB per AFI 31-204 (in its entirety), Motor Vehicle Traffic supervision.

1.18. Visitor Pass: The contractor shall comply with requirement and procedures IAW FAR 5353.242-9000, Contractor Access to Air Force Installations. A list of names will be required to gain access to the installation Passes shall be distributed at the visitor’s center at the Vandenberg gate. Workers shall have proof of identification as well as a valid license, registration and insurance if bringing a vehicle onto base. Contractor employees must have identification readily identifies them as contractors. During the course of the contract, certain areas/sites may be restricted or closed to contractor personnel. The contractor shall comply with all requirements for entry. In addition, unscheduled gate closures may occur at any time and personnel entering or exiting the installation may experience delays. In order to maintain accountability once gaining access onto Hanscom AFB, Contractor shall immediately sign the logs at Building 1810, indicating time and date of arrival. Before departure, Contractor shall again sign the logs indicating the departure time, as well as the work performed and the buildings worked in. A copy of a signed work receipt on Contractor’s letterhead detailing work performed shall also be given to the Civil Engineering Government Representative or left in the log book prior to departure.

1.19. Foreign National(s): The contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign national(s) visiting a U.S. Government facility.

1.20. Health and Safety on Government Installations: In performing work under this contract on a government installation, the contractor shall comply with federal, state and local regulations regarding occupational safety and health and the specific health and safety requirements established by this contract. The contractor shall notify the COR of any injuries that occur to contractor personnel while on the installation. The contractor shall notify the COR of damage to government property or equipment during the execution of the contract.

1.21. Emergency Procedures: Contractor employees shall follow the direction of government employees in regards to emergency evacuation procedures, i.e. fire, tornado, active shooter and bomb threats. It is the contractors’ responsibility to account for their employees following an emergency evacuation. Contractor personnel shall participate with government personnel in all fire and tornado drills and at no additional cost to the government.

1.22. Partnering Agreement: The contracting officer may require a partnering agreement between the government and the contractor to ensure joint cooperation and a sound partnership of all parties involved in the execution of this contract. Partnering is the creation of a government-contractor relationship that promotes achievement of mutually beneficial goals. It involves an agreement in principle to share the risks involved in completing the project and to establish and promote a nurturing partnership environment. Representatives from each organization are encouraged to participate in developing the partnering agreement. Suggested representation is the civil engineer manager, the government inspector, the government contract administrator, the contractor’s manager and the contractor’s quality control person. All costs for the partnership agreement should be shared equally between the government and contractor.

This group is responsible for developing a formal partnering agreement that should be signed by all parties involved. The agreement should contain as a minimum: specific goals to be reached and a list of objectives to reach the goals, a set of metrics to evaluate the objectives, a frequency for meetings to review the metrics, and a statement of cooperation to execute the terms of the agreement.

SECTION 2

PERFORMANCE ASSESSMENT

The contractor shall be aware that in the absence of any contract requirement from the Service Summary, it does not detract from its enforceability nor limit the rights or remedies of the government, under any other provision of the contract. The contractor shall ensure the following Service Summary requirements are accomplished.

2.1. SERVICE SUMMARY

SS PERFORMANCE

OBJECTIVE

PWS

PARAGRAPH

PERFORMANCE

THRESHOLD

SS 1. Perform annual testing, maintenance and repairs of the junction box steam traps and equipment base-wide.

All repairs shall be made before testing occurs to ensure repaired traps are functioning properly.

1.1, 1.2 90% Compliance

SS 2. Responsible for coordination requiring access to equipment. Including:

• removal and reinstallation of concrete trench slabs; replacement of those broken during the work

• installation and removal of temp. fencing

• installation of plugs for lifting points if required

• re-sealing of the concrete slabs

1.2 90% Compliance

SS 3. Inspect the runs of piping approaching the junction boxes for steam leaks and document findings. Provide photo documentation of all of the equipment in each of the spaces.

1.1, 1.2 90% Compliance

SS 4. Submit a report outlining equipment maintained, maintenance performed, location of the equipment and any deficiencies discovered. Report to be submitted in both electronic and hard copy format no later than thirty (30) days after actual field work performed.

1.2.5 90% Compliance

SS 5. Confined Space Entry:

All contractor operations shall comply with confined space entry requirements as applicable.

1.2.7 100% Compliance

SS 6. Perform four (4) hours of hands-on training with operators on trap testing. Training shall include testing techniques for all types of traps using both thermal and ultrasonic methods.

1.2.6 90% Compliance

SECTION 3

GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1. Government Furnished Property (GFP): Government Furnished Property is not applicable to the in the performance of this contract.

3.2. Reserved.

3.3. Government Furnished Services: Government Furnished Services are applicable during the performance of this contract.

3.3.1. Security Police: The government will provide general on base Security Forces service.

The Security Forces’ telephone number is 911 for emergencies, for crime in progress 781-225- 5613 and 781-225-5613 for non-emergency calls.

3.3.2. Fire and Emergency Services: The government will provide general on-base fire protection services. The contractor shall comply with fire prevention rules and regulations enforced by the Hanscom AFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters and/or calls to dispatch, call 781-225-3330.

3.3.3. Emergency Medical Service: The government will provide 24 hour on-base state certified paramedic level emergency response and patient transport services for contractor personnel who are injured or become seriously ill while on Hanscom AFB. The telephone number is 911 for emergencies.

Note: Calling 911 from a cell phone will be received by off base emergency 911 system, causing a delay in response time by emergency personnel. When possible use a base telephone to receive on base help.

3.3.4. Utilities: The government will furnish utility services. These utilities include natural gas, electricity, water and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide.

Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.3.5. Refuse Collection: The government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract for government provided facilities. The government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection. Do not use the government dumpsters for collection of construction debris.

3.3.6. Workspace: The government will provide adequate workspace around the equipment area.

SECTION 1
DESCRIPTION OF SERVICES
1.1. Scope: The contractor shall provide all management, labor, tools, equipment, test equipment, supplies, Personal Protective Equipment, materials, parts, transportation and other incidentals necessary to travel to Hanscom AFB, MA, to perform repair...
1.2. Requested Service: The contractor shall maintain all equipment at steam junction boxes base-wide, per the manufacturer’s recommendations and industry standards. The contractor shall repair/replace the traps found to be malfunctioning. The contrac...
1.2.1. The contractor shall be responsible for all coordination required to access this equipment. This includes coordination with the contractor responsible for the removal of trench concrete covers, installation of temporary fencing, reinstallation ...
1.2.2. The contractor will be responsible for performing all work without disrupting service. In order to meet this requirement, the exercising and greasing of the steam valves will need to occur during the semi-annual steam outage. It should be noted...
1.2.3. The contractor shall repair/replace all malfunctioning traps identified in the attached reports (excluding pump traps), per manufacturer’s, U.S. Air Force, industry and related standards.
1.2.4. This work includes performing annual testing and maintenance of the steam traps to ensure that they are functioning properly. The traps are located as indicated in the bid schedule and attached reports. Included is a Hanscom base map showing th...
1.2.5. The contractor shall submit a report outlining what equipment was maintained, what maintenance was performed, the location of the equipment and any deficiencies discovered. Provided in this package are the reports from the last two maintenance ...
1.2.6. The contractor shall perform four (4) hours of hands-on training with operators on trap testing. Training shall include testing techniques for all types of traps using both thermal and ultrasonic methods.
1.7. Environmental Protection and Safety: The contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations and requirements regarding environmental protection and occupational safety and health. The co...
Responsible for coordination requiring access to equipment. Including:
removal and reinstallation of concrete trench slabs; replacement of those broken during the work
installation and removal of temp. fencing
installation of plugs for lifting points if required
re-sealing of the concrete slabs
Perform four (4) hours of hands-on training with operators on trap testing. Training shall include testing techniques for all types of traps using both thermal and ultrasonic methods.