Bowling_Statement_of_Work_Final.pdf

PDF 13 KB Posted

Attached to
Bowling Preventative Maintenance Federal contract opportunity
Solicitation number
F2A3F32205AQ01
Issued by
Department of the Air Force Air Mobility Command

About this file

Statement of Work (SOW)

View the file

Other files for this federal contract opportunity

Other files attached to Bowling Preventative Maintenance, newest first.
File Type Posted
Bowling_Pricing_Schedule.docx DOCX document
Bowling_Performance_Work_Statement_-Final.pdf PDF
Bowling Pricing Schedule.pdf PDF
COMBO-Bowling-Final.pdf PDF
Bowling PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

1. GENERAL: Work required is to provide a one time job site visit (may be 2 to 5 working days) necessary to perform preventive and corrective maintenance on twenty-four (24) AMF Model 90 XLi bowling pinsetters, lanes, Qubica scoring system, and ball returns at Grand Forks Air Force Base (GFAFB), North Dakota. This contract will be a base year plus four (4) option years.

2. PREVENTIVE MANTENANCE (PM): The contractor will perform preventive maintenance (PM) in accordance with the requirements listed in the AMF Service and Parts manual for AMF Model 90XLi. PM will include required lubrication, component inspection and replacement of parts that periodically wear out during regular use and are considered normal wear and tear; such as, but not limited to, drive belts (purchased by government). Broken or defective components that do not routinely require replacement must be identified to Services.

3. CORRECTIVE MAINTENANCE TRAINING: Contractor will provide training to all Pin Spotters as to be safe while performing their duties. Training will consist of, but not limited to, turning power to machines on and off, removal of a jammed ball and or pin.

4. PARTS AND MATERIALS: The government will be responsible for ordering/purchasing all parts and materials. Currently there are 6 lanes that are non operational and require repair.

Contractor will provide an estimate for repairs.

5. LANE LEVELING FOR CERTIFICATION: Contractor will level all lanes (provide own copy of leveling instructions to meet the United States Bowling Congress (USBC) certification requirements no Later than 30 days from the start of this contract.

6. HOURS OF OPERATION: Sunday, Monday, and Holidays days bowling center will be closed. Open on Tuesday, Wednesday, Thursday 4:00 pm to 9:00 pm, Friday 4:00 pm to 10:00 pm and Saturday 12:00 noon to 10:00 pm (hours of operation) subject to change by the government.

7. PERSONNEL QUALIFICATIONS/INSURANCE: Contractor is required to be trained on of bowling equipment (2 years maintenance/repair experience) and synthetic lane repairs.

Contractor will be physically able to frequently lift and carry objects weighing up to 40 pounds and push or pull objects weighing up to 100 pounds. Must be able to stand, stoop, bend, climb and work in awkward positions. Contractor will procure and maintain, at its own expense, and from company or companies acceptable to the government, insurance covering his/her and any employee personal liability and will provide the government with a copy of the certificate of insurance. The Contractors insurance will comply with the “Workers Compensation Insurance and Liability Insurance laws established by the state of North Dakota”.