Attachment 4 Questions and Answers from Site Visit

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 - Per the site visit, it was noted that the design requirements are limited to calculations and details by a PE/CE for the column anchor bolts, please confirm.

Answer: Yes

2 - Per the site visit, contractors are to assume the existing concrete at the new shade structure location is 12" thick, unreinforced. Please confirm.

Answer: Yes

3 - Per the site visit, it was noted that the 10-year warranty from page 3 of 4 in the Statement of Work applies to the new sunshade vinyl cover, not the structure itself. Please confirm that item H.1. from the Statement of work does not apply.

Answer: See revised Statement of Work. Ten year warranty only for vinyl covering.

4 - Per the site visit, it was noted that there are 8 lightning rods at each of the several other existing shade structures viewed for reference. Please confirm that the contractor is to match the lightning protection at the other shade structures.

Answer: MUST follow NFPA 780: Standard for the Installation of Lightning Protection Systems" 2014 Edition, along with AFI 32-1065 Grounding Systems and UFC 3-575-01 Lightning & Static Electricity Protection Systems. These are standard practices.

5 - Per the site visit, it was noted that FOD fencing around the work area is required. Please confirm.

Answer: Yes, this is standard practice.

6 - Are Reps & Certs to be submitted with the contractor’s proposal?

Answer: Contractor must ensure registration is current in System for Award Management (SAM) prior to award.