Performance Work Statement Vindicator Badge Manage.pdf

PDF 3 MB Posted

Attached to
36SFS Vindicator Badge Manager Upgrade
Solicitation number
F1C3455040AG03
Issued by

About this file

This Performance Work Statement (PWS) details the upgrade of the Vindicator Badge Manager (VBM) system for the 36th Security Forces Squadron at Andersen Air Force Base in Guam. The primary objectives include upgrading the current Windows 7 system to Windows 10, modernizing the user interface, enhancing security protocols, and ensuring system expandability. The contractor will be responsible for installing a new AE VBM 3 Badge Manager SA Workstation, including a Fargo DTC5500 LMX Card printer with laminator, VBM signature pad, Videology badging camera, and related computer peripherals.

The contract scope encompasses a comprehensive system upgrade with a three-year sustainment strategy, including regular software updates, a dedicated support team, ongoing training, backup and data redundancy planning, system performance monitoring, and cost management. The period of performance is one base year with two 12-month option years. The contractor must transfer data from the legacy system, ensure seamless operation with existing equipment, conduct post-installation system checks, provide user training, and maintain the system to operate independently without relying on other network systems. The upgrade aims to create a robust badging system capable of secure, high-quality badge production and encoding.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Vindicator Badge Manager (VBM) Upgrade Building 2403, Andersen Air Force Base, Guam

Table of Contents

1. GENERAL:

1.1 Description of Services/Introduction:

1.2 Background:

1.3 Objectives:

1.4 Scope:

1.5 Period of Performance:

1.6 General Information:

1.6.1 Quality Control: (If applicable)

1.6.2 Quality Assurance:

1.6.3 Recognized Holidays:

1.6.4 Hours of Operation:

1.6.5 Place of Performance:

1.6.6 Type of Contract:

1.6.7 Security Requirements:

1.6.8 Special Qualifications:

1.6.9 Post Award Conference/Periodic Progress Meetings:

1.6.10 Contracting Officer Representative (COR):

1.6.11 Key Personnel:

1.6.12 Identification of Contractor Employees:

1.6.13 Contractor Travel: (If applicable)

1.6.14 Other Direct Costs: (If applicable)

1.6.15 Data Rights: (If applicable)

1.6.16 Organizational Conflict of Interest:

1.6.17 PHASE IN /PHASE OUT PERIOD: (If applicable)

2. DEFINITIONS AND ACRONYMS:

2.1 DEFINITIONS:

2.2 ACRONYMS:

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services:

3.2 Facilities:

3.3 Utilities:

3.4 Equipment:

3.5 Materials:

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: (If applicable)

4.2 Secret Facility Clearance: (If applicable)

4.3 Materials: (If applicable)

4.4 Equipment: (If applicable)

Part 1

GENERAL INFORMATION

1. GENERAL:

This is a non-personnel services contract to provide a Vindicator® Badge Manager (VBM) system upgrade. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction:

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the installation and upgrade of the current VBM system located in building 2403 Pass and ID office as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background:

The 36 Security Forces Squadron generates Restricted Area Badges (RAB) for all secure areas on Andersen AFB utilizing the Vindicator® Badge Management system (VBM). The current Windows 7 experiences frequent hardware and software issues. To remedy the issues the system needs to be upgraded from Windows 7 to Windows 10.

1.3 Objectives:

To create a robust VBM sustainment program by upgrading the system, establishing turnkey reserve equipment, and implementing a three-year maintenance contract. The primary objectives are as follows:

1. Upgrade of the Vindicator Badge Manager to Windows 10:

a. Modernize the User Interface to an intuitive platform. Allowing for efficient access and navigation of the badging system programs.

b. Enhanced Security Protocols by upgrading the operating system with the latest security features to protect sensitive data, prevent unauthorized access, and ensure compliance with industry standards and regulations.

c. Expandability, ensure the system can continue to perform at optimum levels as badge generation increases over the foreseeable future. The modernized system should be able to accommodate new badges, users, and locations without being overloaded by data.

2. Three-Year Sustainability Strategy:

a. Regular Software Updates: Schedule regular updates and patches to address emerging security vulnerabilities and incorporate new technologies.

b. Dedicated Support Team: Establish a team of technical experts available for troubleshooting, ensuring issues are resolved quickly to minimize downtime.

c. Training and Knowledge Transfer: Provide ongoing training to all system users and administrators to ensure they are well-versed in new features and best practices.

d. Backup and Data Redundancy: Implement a backup solution for data redundancy and disaster recovery to ensure minimal disruption in case of technical failures.

e. System Performance Monitoring: Continuously monitor system performance to identify potential issues (e.g., latency, downtime) and resolve them proactively.

f. Cost Management and Budgeting: Develop a 3-year budget plan to allocate resources effectively, ensuring that both operational costs and any necessary upgrades are covered without compromising quality.

g. Customer Feedback Mechanism: Regularly gather feedback from users to make iterative improvements and stay aligned with their needs and expectations.

By focusing on these objectives, the Vindicator system will not only see a successful upgrade but will also be positioned for long-term sustainability and continued relevance over the next three years.

1.3 Scope:

The Contractor shall upgrade, install, and program a new Vindicator Badging Manager WIN 10.

The upgrade will also include installation of a Fargo DTC5500 LMX Card printer with Laminator, VBM Signature Pad, Videology Badging camera, and computer peripherals at B2403 Pass and ID facility. Services include the removal of current VBM system, the installation and programing of the new AE VBM 3 Badge Manager SA Workstation with AE V3 ACS encryption. Data from the legacy system will be transferred on to the new system. The set up of a redundant system with V5 ACS Firmware. Additionally, contractor shall agree to a 3-year sustainment obligation for the upgraded equipment and existing Vindicator system to include 1 week per year preventative maintenance visit and one emergency visit within the same year. The contractor shall ensure the upgraded AE VBM 3 Badger Manager SA Workstation and ancillary equipment operate seamlessly with any in use legacy equipment. The contractor shall accomplish a post installation system check and resolve any system issues identified during system testing. Additionally, contractor must provide system training to designated users and program maintainers as designated by the SFS squadron. The VBM should be fully integrated and capable of operating independently without reliance on other network systems, offering secure, high-quality badge production and encoding.

1.4 Period of Performance:

The period of performance shall be for one (1) Base Year of 12 months and two (3) 12-month option years. The Period of Performance reads as follows:

Base Year Year I Year II Year III

1.5 General Information:

1.5.1 Quality Control: N/A

1.5.2 Quality Assurance:

The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.3 Recognized Holidays:

The contractor is not required to perform services on holidays.

New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Independence Day

Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day

1.5.4 Hours of Operation:

The contractor is responsible for conducting business, between the hours of 7:30 a.m. to 4:30 p.m. Monday through Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.5 Place of Performance:

The work to be performed under this contract will be performed at building 2403 PASS and ID Facility and building 23020 BDOC.

1.5.6 Type of Contract:

The government will award a (Type of contract to be determined by CCE and the customer).

1.5.7 Security Requirements:

N/A

1.5.7.1 Physical Security:

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.8 Special Qualifications:

The contractor is responsible for ensuring all employees possess and maintain current Vindicator Certifications during the execution of this contract.

1.5.9 Post Award Conference/Periodic Progress Meetings:

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart

42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.5.10 Contracting Officer Representative (COR):

The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.11 Key Personnel:

The follow personnel are considered key personnel by the government: ESS IT specialist Romeo Buccat 671-489-6609 / Alternate ESS Program Manager Mark Enaje 671-488-3201. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:30 p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.5.12 Identification of Contractor Employees:

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel will be required to obtain and wear badges in the performance of this service.

1.5.13 Contractor Travel:

Contractor will be authorized travel expenses to Andersen AFB consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR.

Travel Expenses are not to exceed the amounts in the attached IGE (Attachment 1).

1.5.14 Other Direct Costs:

All direct costs are reflected on the IGE (Attachment 1).

1.5.15 Data Rights:

The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.5.16 Organizational Conflict of Interest:

Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.5.17 PHASE IN /PHASE OUT PERIOD:

N/A.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1 DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government.

Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2 ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RAB Restricted Area Badge TE Technical Exhibit UI User Interface VBM Vindicator Badge Manager

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services:

The Government will provide an escort to access facilities.

3.2 Facilities:

The Government will provide access to building 23020 BDOC server room and building 2403 Pass and ID facilities to provide the support outlined in the PWS.

3.3 Utilities:

The Government will provide all utilities in the facility. Utilities will be available for the contractor’s use in performance of tasks outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment:

N/A

3.5 Materials:

N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General:

The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance

N/A

4.3 Materials:

The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS. To include but not limited to:

Product Quantity AE VBM 3 Badge Manager SA Workstation (Win 10, SQL 2019) Office 2016 Pro, 32Gb RAM, RAID 1, 2U Rack Mnt

Startech.com 6ft Mini DisplayPort to HDMI Cable - 4K 30hz Monitor Adapter Cable - mDP PC or Macbook to HDMI Display

VBM Signature Pad 1 Fargo DTC5500LMX Card Printer with Laminator 1 AE V3 ACS - AES Encryption, RJ45 1 V5 ACS Firmware Upgrade 1 ECO YMCKOK*: Full-color ribbon with two resin black panels and clear overlay panel, 500 images

PolyGuard LMX UV Resistant 1.0 mil Overlaminate, Clear, 1000 count 4 Cleaning Kit - Includes 4 Printhead Cleaning Swabs, 20 Cleaning Cards, 3 Alcohol Cleaning Cards 5 Videology Badging camera 1 Matrox Extio 3 High-Performance IP KVM Extenders Transmitter 2 Matrox Extio 3 High-Performance IP KVM Extenders Receiver 2 Matrox Extio 3 KVM Rack Mounting Kit 2 Startech.com 6ft (2m) VESA Certified Mini DisplayPort to DisplayPort 1.4 Cable - 8K 60Hz HBR3 HDR - Super UHD mDP to DP 1.4 Cord - Slim (34 AWG) Ultra HD 4K 120Hz -Monitor/Video Cable

(DP14MDPMM2MB)

Startech.com 15ft .(4.6m) 3.5mm Audio Cable - 3.5mm Slim Audio Cable - Gold Plated Connectors - Male/Male -Aux Cable (MU15MMS), Black

Tripp Lite 8-Port Rack Console KVM Switch w/19" LCD PS2/USB Cables 1U TAA GSA KVM console with KVM switch - 8 ports - PS/2 - 19" -rack-mountable - 1280 x 1024 @ 60 Hz - VGA - black - 1U -TAA Compliant

10 ft DisplayPort 1.2 Cable with Latches - 4K x 2K (4096 x 2160) @ 60Hz - DPCP & HDCP - Male to Male DP Video Monitor Cable (DISPLPORT10L),Black

4.4 Equipment:

The Contractor shall provide all necessary tools and equipment to meet the requirements under this PWS.

(5)

CLIN

(7) Qty (8) Unit of Issue (9) Unit Price Extended Price

Name:

Phone Number:

Title/Rank:

E-Mail Address:

Independent Government Estimate (IGE)

(1) Installation: Andersen Air Force Base (Guam) (2) Purchase Request or Funding Document:

(4) Requesting Unit:(3) Date:

BASIS OF IGE

(6) Description

(11) Requirement Owner Recommended Source #1

Vendor Name:

POC Name:

Phone Number:

E-Mail Address:

(12) Pricing Justification:

(14) Requirement Owner Signature: (13) Requirement Owner Point of Contact:

Estimated Shipping:

(10) Total:

36 CONS Revised 10 JUL 2024

1275085711C Stamp

DEPARTMENT OF THE AIR FORCE

AIR FORCE LIFE CYCLE MANAGEMENT CENTER

HANSCOM AIR FORCE BASE, MASSACHUSETTS

CUI

29 April 2024

MEMORANDUM FOR DISTRIBUTION

FROM: AFLCMC/HBU

3 Eglin St, Bldg. 1612 Hanscom AFB MA 01731

SUBJECT: Non-Nuclear Configuration Management Database (CMD) Equipment Approval

1. Attached are the current CMD equipment lists approved for use when employed in the tested PL-1 (non nuclear) through PL-4 applications and configurations. Information on the tested configuration can be obtained from AFLCMC/HBU upon request.

2. Attachment 1 identifies equipment approved for new procurements and installs, or for upgrading existing equipment to the latest configuration. Attachment 2 identifies previously-approved equipment that is still approved for use and sustainment in existing installs; however, the equipment in Attachment 2 is not approved for new procurements or new installs, even if the item is still available from the Original Equipment Manufacturer. It is recommended systems get updated to the most current software and firmware versions identified in Attachment 1 as soon as practical, subject to available funding.

Yellow highlight indicates correction, change, and/or addition.

3. All equipment was determined to meet all applicable TAA/BAA/NDAA requirements at the time of approval. Manufacturers could change place of origin over time. Installation agents should verify place of origin of all components prior to installation.

4. A listing of equipment approved for use in PL-1 Nuclear applications is available in a separate letter maintained by the POC listed below.

5. For additional inquiries, the POC for this effort is Lt. Morgan Huang, AFLCMC/HBUA, morgan.huang.1@us.af.mil.

LINDA W. HAINES, NH-04, DAF

Chief, Force Protection Division

Controlled by: AFLCMC/HBUA CUI Category: DoD Critical Infrastructure Security Information Dissemination Controls: FEDCON POC: Lt Morgan Huang, morgan.huang.1@us.af.mil

CUI

2 Attachments:

1. CMD (Non-Nuclear) Equipment List – Approved for New Procurements, Installs, and Upgrades, 25 Apr 2024

2. CMD (Non-Nuclear) (‘Non-Procurable’) Equipment List – Approved for Continued Use and Sustainment in Existing Installs, 25 Apr 2024

DISTRIBUTION:

AFDW/A4S

HQ USAFE/A4S

HQ AFMC/A4S

HQ PACAF/A4S

HQ AETC/A4S

HQ AFSFC/S5G

HQ USSF/A4S

HQ AFSOC/A4S

HQ AFRC/A4S

HQ AMC/A4S

HQ ACC/A4S

HQ AFGSC/A3S

NGB/A4S

HQ USAFA/SF

HQ USAF/A4SX

HQ USAF/A4SO

HQ USSF/A4S

HQ AFLCMC/HNC (CCSD)

Attachment 1

CMD (Non-Nuclear) Equipment List, 27 Feb 2024 Approved for New Procurements, Installs and Upgrades

COMMAND, CONTROL AND DISPLAY EQUIPMENT (CCDE)

(Integrated intrusion detection (IDS) and access control (ACS))

Prometheus Security Group (PSG) Global

• LINX Predator Elite (LPE) Annunciator Version 8.1 (Win 10)

– LINX SNMP version p90100.2.58

– LINX Predator Enrollment System Version 4.1.220

– LINX Predator Badging Enrollment Application Version 8.1.2100P

– LINX Versatile Interface Panel (VIP) Version 8.116

– LINX Versatile Interface Panel (VIP-16i) Version 1.09

– WSD-E Card Reader version 3.1110

– LINX Touch Zone Controller (Ordering codes: 15-20000-001 for controller itself, 15-

20000-007 for install kit)

– iDentyTech IDT Jade Biometric Physical Access Control:

o IDT Jade Palm Scanner Model 100120135-PRO, v15.06.000-112 o IDT Jade Palm Enrollment Scanner (USB) Model 100230910-PRO, v15.06.000-112

LenelS2

• OnGuard Version 8.1

– Seneca / Dell R540 Server

– Seneca / Dell R330 Server

– Windows 10 Enterprise 20H2 (OnGuard and Milestone Client)

– Windows Server 2019 Standard (OnGuard and Milestone Servers)

– SQL Server 2019 Standard

– Zebra ZXP Series 7 Card Printer

– Videology 24C708AF Photo ID Camera

– Morpho MSO-300 Fingerprint Enrollment Reader.

– HID Omnikey 5422 Personal Identity Verifier (PIV) / Common Access Card (CAC)

Enrollment Reader

– HID Omnikey 3121 PIV/CAC Enrollment Reader

– RFIDeas HID iCLASS Enrollment Reader

– Intelligent System Controllers:

o LenelS2 LNL-X4420 v1.303 o LenelS2 LNL- X2220 v1.303 o LenelS2 LNL-X2210 v1.303

– Reader and Input Modules:

o LenelS2 LNL-1320-S3 Reader Module (connected to LNL-X4420 using RS-485) v3.21.12 o LenelS2 LNL-1200-S3 Alarm Module (connected to LNL-X2220 using RS-485) v3.21.12 o LenelS2 LNL-1100-S3 Alarm Modules (each connected to its respective LNL-X2210 using RS-485) v3.21.12

– Card and Biometric Readers:

o HID pivCLASS RK40 Card Reader o HID pivCLASS RKCL40 Card Reader o Morpho Sigma LitePlus Biometric and Card Reader o Veridt Stealth 900W2026 proximity (Prox) (RFID) Card Reader o Veridt Stealth 900W2036 wired to the LNL-X2220 Prox (RFID) and chip card reader o LNL-CK arm/disarm reader, wired to the LNL-X2220 o Morpho Access Sigma SMA-293645512 Biometric (fingerprint) and Card Reader

Honeywell Vindicator

• Vindicator Command and Control Platform Version 10

– Vindicator 10 Annunciator Workstation (Win 10 LTSC):

o Windows 10 LTSC version 21H2 (OS Build 19044)

– Vindicator Security Server (VSS) o Windows Server 2019 version 1809 (OS Build 17763.4377)

– Win structured query language (SQL) Database Management VSS o SQL Server 2019 version 1809 (OS Build 17763.4377)

– Vindicator System Terminal o Windows 10 LTSC version 21H2 (OS Build 19044)

– Vindicator Command and Control 2 (VCC2) 1.3.0.2 SP4

– V3 Network Security (IDS & ACS) Firmware 4.3.2 SP VR22

– V5 Network Security (IDS & ACS) Firmware 4.5.2 SP VR22

– AES–1500 Network Field Device Firmware 4.3.2 SP VR22

– Security Archive Workstation 2 (SAW2) 1.4.3.0 SP6

– Vindicator Badge Manager 3 2.0.27.0 SP4

– Vindicator Site Commander with or without SAW2 1.3.0.7 SP2

– Vindicator Area Commander 1.1.0.7

– Vindicator Premise Controller 4.3.2 VR22

– Vindicator PC Smart Pak (PCSP) 6.0.0.1

Note: No new orders of the V5 panel (V5 IDS & ACS hardware) are being taken by the OEM as production is discontinued.

VIDEO MANAGEMENT SYSTEMS (VMS)

Milestone

• Milestone XProtect 22.2av tested with LenelS2 OnGuard v8.1

– XProtect Server 2022 R2 (22.2av), XProtect Smart Client 2022 R2 (22.2av)

– Windows 10 Enterprise 20H2 (OnGuard and Milestone Client)

– Windows Server 2019 Standard (OnGuard and Milestone Servers)

PSG Video Image Control and Display System (VICADS)

• VICADS Version 4.3 using LPE v8.1 (Win 10)

• VICADS Version 4.3.5 using Vindicator (Win 10)

– Server O/S: Microsoft Windows Server 2022 version: 10.0.20348, (OS Build 20348)

– Client O/S: Microsoft Windows 10 Internet of Things Enterprise LTSC version:

10.0.19044, (OS Build 19044)

• VICADS Version V100.2.1_FINAL_7 using LINX Predator Elite Version 8.1.2100p, subpatch p8121.01.17, CSS 2.0.0 (Win 10 LTSC 2021; Win Server 2022, build 21H2;

Ubuntu 20.04 LTS in FIPS Mode)

CAMERAS / IMAGERS

Assessment Cameras Note: The following imagers may be used to perform alarm assessments from interior and exterior sensor points.

• Axis Q6075 Indoor PTZ

• Axis Q6075-E Outdoor PTZ

• Axis Q1656

• Axis P3265-LVE

• Axis Q3538-LVE

• Bosch 8001 Fixed Thermal Camera (Model: NHT-8001-F35VF)

• Bosch Flexidome Starlight 8000i Dual SD Variant must be used or WLAN Disabled (Model:

NDE-8502-R)

• Bosch NDE-8503-RXT

• Bosch NBN-63023-B

• Bosch NBN-73023-BA

• Bosch NBN-80052-BA

• Hanwha PNB-A6001

• Hanwha XNB-6003

• Hanwha XNV-6083R

• Hanwha XNZ-L6320A

• Pelco Sarix IXE Series Box Cameras w/ SureVision 3.0

• Pelco Sarix IXP23

• Vicon V2002D-W313MIR

• Vicon V2008-W-NL

• Vivotek IP9165-HT-v2 (Note: for indoor use only and was only integrated with the Video

Image Control and Display System (VICADS) V-100 (Version 100.2.1.1) VMS)

Pan-Tilt-Zoom Cameras Note: These cameras may be used to assess alarms received from the approach zone as well as to perform surveillance and situational awareness functions. They will not be used as the primary means to perform alarm assessments of interior or exterior sensor points.

• Avigilon H5A IR PTZ (Model: H5A-IRPTZ-DP40-WP)

• Bosch Auto Dome IP Starlight 7000i Camera (Model: NDP-7512-Z30)

• Bosch MIC IP Starlight 7100i (Model: MIC-7522-Z30W)

• Bosch MIC IP Fusion 9000i (Model: MIC-9502-Z30WVF)

• Hanwha XNP-6400RW

• Pelco Espirit Enhanced ES6230-15P-R2

• Pelco S7230L-PW

• Vicon V2002-D-PTZ

Camera Environmental Enclosures

• Bosch UHO-HBGS-61 Outdoor Camera Housing

INTRUSION DETECTION SENSORS

Interior Sensors Note: Balanced Magnetic Switch (BMS) will not be used as a line of detection.

• ASSA ABLOY (Securitron Group) MSS-1 High Security Balanced Magnetic Switch

• Banner Engineering Series Active Infrared (AIR), intrinsically safe, Model SMI30 (Note:

Must be installed as an array of individually reporting sensor points, for use across openings in areas where explosive fumes may be present).

• BEA LZR-i30

• BEA LZR-s600

• Bosch ISC-BPQ2-W12 PIR (Curtain Configuration Only)

• Bosch ISC-PDL1-WA18G PIR (Curtain and Volumetric Configuration)

• Dortronics 1110 xD xCT, Magnetic Lock/BMS

• Dortronics 1120 x2D xCT, Series Electromagnetic Lock and BMS

• East Coast Security Products Inc. ESM-6T Tandem Balanced Magnetic Switch

• Eltec 862 Passive Infrared (PIR) Sensor (Wall)

• Eltec 864 PIR

• Fiber Sensys LD204S

• Fiber Sensys LD308SH

• Magnasphere HS-L1.5-101 BMS

• Magnasphere HS-L1.5-111 BMS

• Magnasphere HSS-L2C-101 BMS (Concealed Contact)

• Magnasphere HSS-L2C-101-A BMS (Concealed Contact)

• Magnasphere HSS-L2C-111 BMS (Concealed Contact)

• Magnasphere HSS-L2C-111-A BMS (Concealed Contact)

• Magnasphere HSS-L2D-000 BMS (Dual Alarm Contact)

• Magnasphere HSS-L2D-800 BMS (Dual Alarm Contact)

• Magnasphere HSS-L2S-000 BMS (Single Alarm Contact)

• Magnasphere HSS-L2S-800 BMS (Single Alarm Contact)

• Magnasphere Interior Barrier Sensor Model MSK-101-MM

• Magnasphere Interior Motion Sensor Model MSK-101-MM

• Optex SX360Z PIR

• Protech Maxiris 3000/3100 Active IR Interior Sensor

• Protech Passive IR and Microwave Intruder Detectors (PIRAMID) SDI-76-G (Volumetric)

• Protech PIRAMID SDI-77-D (Volumetric)

• Protech SDI-76M-HS1-H Volumetric (Coverage 60’x 40’, Two Sensors in Combination)

• Protech SDI-76MW Volumetric (Coverage 60’x 40’, Two Sensors in Combination)

• Protech SDI-77XL2-EX, Explosion Proof Volumetric

Exterior Sensors

• BEA LZR-i30 (ECP Configuration)

• BEA LZR-s600 (ECP Configuration)

• DeTekion Defensor 100 Fence Sensor

• DeTekion Defensor 100 Fence Sensor (with Culvert Configuration)

• DeTekion Defensor 100 sensor system with the GD-5000 Eliminator signal analyzer

• DeTekion Vertical Taut Wire Sensor 400 (VTW-400), full fence or out-rigger configuration

• EAG of Americas Infrared Intrusion Detection System 4/2/2 (IIDS4/2/2) Active Infrared

Sensor

• EAG of Americas Infrared Intrusion Detection System 4/4/2/2/2 w/ PSTC

• EAG of Americas Intrusion Detection System 4/2 (IDS 4/2) Active Infrared Sensor

• ECSI Infrared Pulsed Intrusion Detection System (IPIDS), up to 80m with spring loaded mount bases and 100m with solid concrete bases.

• Fiber SenSys Fiber Defender The following models have been tested: 331, 332, 341, and

342. (Note: The 331 and 332 series is with “Sensitive” Lead-in cables whereas the 341 and 342 series is with the “Insensitive” Lead-in cables. Also, the last digit (1 or 2) indicates a single channel processor or dual channel processor. Additional note: The 33x series is normally utilized for TASS applications with the 34x series being utilized for all hardwired configurations.)

• Fiber SenSys Fiber Defender 525 (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Fiber Sensys Fiber Defender FD-342, v4.47

• Fiber Sensys Fiber Defender FD-342, v4.47 (Culvert Configuration)

• Fiber SenSys Terrain Defender TD100 (Note: currently tested for Southern tier use only)

• IR Global Infrared Intrusion Detection System 4/4/2

• IR Global IRG-509-15M

• Protech PIRAMID / SDI-76-XL-MIL LT (Ladder and Tower) Only

• Protech PIRAMID / SDI-76-XL-MIL, PIR and Monostatic Microwave Sensor

• Protech Maxiris 3000/3100 Active Infrared Barrier (100 meter) w/ New Cell Insensitive to the Sun (NCIS) cells

• Protech Maxiris 3100 Active Infrared Barrier (100 meter)

• Protech Sorhea Technology G-Fence 600 Zoning (600Z) System

• Protech Sorhea Technology G-Fence 600 Zoning (600Z) System (Culvert Configuration)

• RBtec Ironclad Fence Sensor Double Run Configuration

• Senstar FlexZone Fence Sensor (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Senstar Omnitrax buried line sensor w/Firmware Version MSP v2.90 w/FPGA v13.93

• Senstar UltraWave Detection Sensor TE (w/ Whiteman AFB tamper protection modification)

• Senstar UltraWave Microwave Detection Sensor (Firmware 3.04)

• Southwest Microwave 330 Digital Microwave System

• Southwest Microwave 385 Monostatic Sensor, up to 100m

• Southwest Microwave 460B Active Infrared Exterior Sensor

• Southwest Microwave Intrepid 334-33465 (Model 334), Double Stacked configuration with

Model 336 installed on bottom of stack and Model 334 installed on top (Note: Not approved for use in close proximity with airfield due to X-Band frequency for Model 334)

• Southwest Microwave Intrepid 336-33464 (Model 336), Double Stacked configuration

• Southwest Microwave Intrepid Micropoint II

Wide Area Detection/Approach Zone Sensors

• FLIR Ranger 1 Perimeter Surveillance Radar (700 meters)

• FLIR Ranger 2 Perimeter Surveillance Radar (1400 meters)

• FLIR Ranger 3 Perimeter Surveillance Radar (2800 meters)

• Magos SR-500 Perimeter Surveillance System when integrated with the Advantor Systems

ASN, Version 6.2. MASS Version 2.24.10053, SR-500 Radar Version 3.64 and Radar Manager Version 1.5

• SpotterRF C40D Integrated with Advantor Version 6.2 (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

ADDITIONAL PL-3 AND PL-4 ITEMS

In addition to the above components, the following equipment is approved for use in the protection of PL-3 and below assets.

Command, Control and Display Equipment (CCDE): None Video Management Systems (VMS): None Cameras/Imagers:

• Clear Align VZ-250 LRTI 23164-600

• Clear Align VZ-250 LRTI 23164Z1-600 (Improved Cooling)

• Clear Align LRTI-w/CCTV

– C907891 Complete Kit

– TICC/PTH only C907892

• FLIR DEFENDIR MS-UC 640 30/90MM CZ

Interior Sensors: None Exterior Sensors: None

Attachment 2

CMD (Non-Nuclear) (‘Non-Procurable’) Equipment List, 27 Feb 2024 Approved for Continued Use and Sustainment in Existing Installs

COMMAND, CONTROL AND DISPLAY EQUIPMENT (CCDE)

(Integrated intrusion detection (IDS) and access control (ACS))

Advantor

• Advantor Advantage Suite for Networks (ASN) Version 6.2 (Win 10)

• Advantor Advantage Suite for Networks (ASN) Version 5.0

• Advantor Advantage Suite for Networks (ASN) Version 4.0

• Advantor Integrated Command, Control, and Access Control System Version 5.0

• Advantor Integrated Command, Control, and Access Control System Version 5.0 Service

Pack 6

• Advantor Integrated Command, Control, and Access Control System Version 6.0

Prometheus Security Group (PSG) LINX Predator Elite (LPE)

• Annunciator Version 3.2.274p

• Annunciator Version 3.0.252

• Annunciator Version 3.0.246

• LINX Predator Enrollment System Version 4.0.203

• WSD 2000 Card Reader version 1.8V

• WSD-E Card Reader version 3.110

• LINX Annunciator Version 3.2.274p, subpatch p32274.1.13

– LINX SNMP version 3.3.274P, subpatch 3.3.274P.1.13.30

• LINX Annunciator Version 3.3.274p, subpatch p33274.1.13.33

• LINX Versatile Interface Panel (VIP) Version 1.148

• LINX Versatile Interface Panel (VIP) Version 1.172

• LINX Versatile Interface Panel (VIP) Version 1.64

– LINX Versatile Interface Panel, Expandable (VIP-E) Version 7.145

– LINX Versatile Interface Panel, Expandable (VIP-E) Version 7.284

– LINX Versatile Interface Panel, Expandable (VIP-E) Version 7.288

Honeywell Vindicator

• Vindicator 10 Annunciator Workstation (Win 10 LTSB):

– AES-1500 Network Field Device-Version 4.3.2 SP VR11

– Security Archive Workstation 2-Version 1.4.3.0

– V3 Head-End Server (IDS & ACS)-Version 4.3.2 SP VR11

– V5 Network Security Appliance-Version 4.5.2 SP VR11

– Vindicator Area Commander-Version 1.1.0.7

– Vindicator Badge Manager 3-Version 2.0.26.7

– Vindicator Command and Control 2-Version 1.3.0.2 SP4

– Vindicator PC Smart PAC (PCSP)-Version 6.0.0.1

– Vindicator Premise Controller-Version 4.3.2

– Vindicator Security Server-Version 1.0

– Vindicator Site Commander-Version 1.3.0.7

– Vindicator System Terminal-Version Win 10 LTSB

• Vindicator Security Management and Reporting Terminal (SMART) Annunciator with Graphics Display:

– Version 2.40 with Administrative Browser 4.0

– Version 2.43, Build 11

• Vindicator Command and Control (VCC) Version 1.0.1.5

• Vindicator Access Control System (ACS) Version 2.3, Build 21

• Transponder Firmware Version 2.28

• TS 4000 Radio Frequency (R/F) Modem Interface

• Vindicator SMART with Graphics Display Version 2.39 and SAW Version 3.9

• Vindicator Command and Control Platform (VCCP) v5- Version 5.0

• Vindicator Command and Control Platform (VCCP) v5- Version 6.0

• Vindicator Command and Control Platform (VCCP) v5- Version 6.5 (Win 7, 32 bit only)

• Vindicator Command & Control (VCC) GUI Version 5.1.1.4

• Vindicator Badge Manager 2 (VBM 2) Version 2.0.7.0

• Vindicator Badge Manager 2 (VBM 2) Version 2.0.7.1 (Win 7, 32 bit only)

• Vindicator Security Archive Workstation (SAW 5) Version 5.1.0.6

• Honeywell Vindicator Site Commander Version 1.2.0.1

• V5 IDS Network Security Appliance – Intrusion Detection, Revision 3.2, Release 20:

– UHS-8270

– DES-8270T

– AES-8270T

• V5 ACS Network Security Appliance – Access Control Revision 3.2 Release 20:

– UHS-1401

– DES-1401T

– AES-1401T

• Vindicator UHS-Net Gateways:

– UHS-8101 Version 2.33, Build 7

– UHS-8102 Version 2.33, Build 6

– UHS-8301 Version 2.33, Build 13

– UHS-8400 Version 2.33, Build 13

• Vindicator UHS-Net Transponder/Gateway Revision 3.3, Release 5:

– UHS-1500

– DES-1500T

– AES-1500T

• Vindicator UHS-Net Transponders Version 2.33, Build 13:

– UHS-6842

– UHS-6842F

– DES-6842

– DES-6842F

• PC SMART PAC Software Package Version 5.1

• Proteus 5 & SmartSave 5 Software Programs Version 5.2

• Vindicator Command & Control Platform (VCCP) Windows 7(64-bit):

– Vindicator Command & Control 2-Version 1.2.1.4

– V5 Network Security Application for IDS & ACS-Version 3.2, Release 23

– UHS-1500 UHS-Net Field Panel-Version 3.3, Release 7

– Security Archive Workstation 2-Version 1.4.2.9

– Vindicator Badge Manager 3-Version 2.0.26.7

– Vindicator Site Commander-Version 1.3.0.7

– Vindicator Area Commander-Version 1.1.0.6

– Vindicator Premise Controller-Version 3.3, Release 7

• Vindicator PC SMART PAK-Version 6.0.0.1

• Vindicator Security Server-Version 1.0

Lenel

• OnGuard Version 7.5 (not approved with any Ground Based Radar)

VIDEO MANAGEMENT SYSTEMS

Advantor

• Advantor VMS Version #va-advantorvms-3.3.22-1 (1/el5)

• Advantor VMS Wall Version ds-vmx-3.3.1-3

Bosch

• Allegiant Matrix/Control System LTC 8600 and 8800

Cisco

• Broadware 4.80 / Cisco 5.1.1. Video Storage System (NOTE: Cisco renamed the 4.80 after purchasing Broadware)

Milestone

• Milestone XProtect Server Version 12.3

PSG Video Image Control and Display System (VICADS)

• VICADS Version 4.1 using Vindicator V5, Version 6 as the annunciator

• VICADS Version 4.0 Video Management System

• VICADS Version 4.1 Service Pack 1.6 using Vindicator V5, Version 6.5 as the annunciator

• VICADS Version 4.1 Service Pack 1.6 using LPE Version 3.2.274p, subpatch p32274.1.13 as the annunciator

• VICADS Version 4.1 Service Pack 2.0 using Vindicator VCCP Windows 7 as the annunciator

(Note: DefendIR Thermal imager protocol support, RadarWall, and Geoserver are not approved for use)

• VICADS Version 4.1 Service Pack 2.4 using Vindicator VCCP Windows 7 as the annunciator (Note: DefendIR Thermal imager protocol support, RadarWall, and Geoserver are not approved for use.)

• VICADS Version 4.2.7 build 134 using LPE Version 3.3.274p, subpatch p33274.1.13.33 as the annunciator

• VICADS Version 4.2.7 build 134 using Vindicator 7 as the annunciator

• VICADS Version 4.3.2 using Vindicator (Win 10) as the annunciator

• PSGG VICADS Version 4.3.4 using Vindicator (Win 10 LTSC 2016, Win Server 2016) as the annunciator

CAMERAS / IMAGERS

Assessment Cameras

• Axis Q1645 Fixed Camera

• Axis P3245-LVE

• Axis Q3527-LVE

• Axis Q6215-LE PTZ

• Bosch NWC-04-95-20P Internet Protocol (IP) Camera

• Bosch NWC-04-95-20P (1/3 Format)

• Bosch NBN-498-21P Internet Protocol (IP) Camera

• Bosch Auto Dome VG 4-322-ECE1M

• Bosch Auto Dome VG5-623-ECS

• Bosch Auto Dome VG5-624-ECS

• Bosch Auto Dome VG5-724-ECE2

• Bosch Auto Dome 7000 Internet Protocol (IP) Camera with environmental housing

• Bosch Dinion Internet Protocol (IP) 7000 Camera with environmental housing

• Bosch DINION Internet Protocol (IP) Starlight 7000 HD (NBN-73013-BA)

• Bosch NBN-63013-B

• Bosch NBN-71013-B

• Bosch NBN-71022-B

• Burle 300H Camera

• Burle TC 351 Camera (1/2 inch format)

• Cohu 4865 Camera (WS3) (2/3 inch format)

• Cohu 48x Camera (KUMMSC) (2/3 inch format)

• Cohu 4915/4912-3000 Camera (1/2 inch format)

• Cohu 3930HD

• Indigo Vision 512147 (PTZ)

• Indigo Vision 11650-Audio-HD

• IQ Eye 752 Internet Protocol (IP) Camera

• Lumenera Le 165M-DN Internet Protocol (IP) Camera

• Lumenera Le 165ME-DN Internet Protocol (IP) Camera with environmental housing

• Lumenera Le 165MP-DN Internet Protocol (IP) Camera with environmental housing

• Pelco ES31CBW35-2N Pan Tilt Zoom (PTZ) System

• Pelco ES30C/ES31C Pan Tilt Zoom (PTZ) System (1/4 in. format) with/without optional wiper

• Pelco ES4136-2N Esprit ES system Pan Tilt Zoom system (1/4 in. format) with/without optional wiper

• Pelco MC3651H-2 Interior Camera (1/3 inch format)

• Pelco IXE20 IP Camera

• Pelco ES4036-5W Esprit Series, with and without wiper, standard and pressurized

• Pelco ES40E36-5W Esprit Series, with and without wiper, standard and pressurized

• Pelco ES40/41 Series Positioning System, Analog, PTZ, w/wo wiper Esprit SE Standard &

Pressurized (Model: ES4036-5W)

• Pelco ES40E/41E Series Positioning System, IP, PTZ, w/wo wiper Esprit SE Standard &

Pressurized (Model: ES40E36-5W)

• Pelco IXE21 Internet Protocol (IP)

• Pelco P1220-ESR1 (PTZ)

• VICON SN680D-B-WNIR (PTZ)

• VICON IQ762WI-V6 Internet Protocol (IP)

• Vivotek IP 7151

• Vivotek SD8364E (PTZ)

• Vivotek IP816A-HP (Note: For interior use only)

INTRUSION DETECTION SENSORS

Interior Sensors:

Note: Balanced Magnetic Switch (BMS) will not be used as a line of detection.

• AN/GPS-15(V) Closed-Shelter Aircraft Sensor (C-SAS) (Volumetric)

• AN/GSS-20 Volumetric

• AN/GSS-36(V) Open-Shelter Aircraft Sensor (O-SAS) (Volumetric)

• AN/GSS-39(V) Interior Intrusion Detection System. Components include:

-- DR-301 -- DR-558 -- DR-851 -- HT-50B

-- HT-50DC -- HT-100B -- HT-100BC -- SDI-76A

-- SD-150EHB -- SRN-2000H

-- SDI-77C -- SD-80B -- SD-80EHB -- SD-150B

• AN/GSS-9(V) SA 1955 BMS

• Bosch DS 9370 PIR/MW (Volumetric)

• Bosch DS 939 PIR (Volumetric)

• Fiber Sensys AP2-20N Passive Infrared (PIR)

• Fiber Sensys EX-35T Passive Infrared (PIR)

• General Electric (Sentrol) Model 2507AH-L Wide Gap BMS

• General Electric (Sentrol) Model 2700 Series BMS

• General Electric (Sentrol) Model 2800 Series BMS

• General Electric (Sentrol) Model 2807T Explosion Proof BMS

• General Electric AP669 PIR (Volumetric)

• Optex Redscan RLS-3060SH Laser Scan Detector (Note: Approved for wall and ceiling configurations)

• PL&E Communications AVT 234 (VMD) using Dinion analog infrared imagers (Note: For interior use only)

• SightLogix SightSensor Video Motion Detection (VMD) using NS-90A Thermal Imager

(Note: For interior use only)

• Tyco Visonic Disc 360 Passive Infrared Sensor (Ceiling) (Coverage 360 Degree)

• United Technologies Interlogix AP669 Mirror Optic PIR (Volumetric)

• Visonic CH-1000

• Visonic CH-1000 (Wall)

• Xtalis ADPRO 18 WH PIR Combination (Ceiling) (Coverage 30’x 30’)

Exterior Sensors:

• Birdeye Model IX Infrared Perimeter Detection System, up to 120m

• Fence Protection System 2-2R (FPS-2-2R)

• Fiber Optics Intrusion Detection System (FO-IDS), Fiber Optic Sensor System (FOSS)

Models 100 and 200

• Microtrack buried line sensor (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Perimitrax, Buried Cable Intrusion Detection Sensor

• Racon Single Stack; Barksdale Configuration - single stack, basket weave configuration with double stacked sensors at the corners

• Racon Double Stack

• Racon 16000-4 (Microwave) Sensor

• Racon 14000-32 Microwave Sensor

• Racon MPS-4100 (Microwave)

• Racon MPS-14000-1 (Microwave)

• Senstar Sentrax Short Ported Coaxial Cable Sensor (SPCS), large and small diameter cable, in the straight-line configuration

• Southwest Microwave Intrepid Micropoint. (Note: Not approved for use in Northern tier, or areas where snow and ice accumulations are normal, pending further testing)

• Southwest Microwave 310 Bi-static Sensor, up to 100m

The following sensors in combination are approved for use as a line of detection with fence climber enhancement detection:

• Enhanced DTR-90 Vertical Taut Wire (VTW) Sensor, the DTR 90 “Y” VTW Sensor, or the

VTW 400 Sensor installed at the top of the fence with any one of the following sensors installed on the fence: Fiber SenSys Fiber Defender FD300 series. The following models have been tested: 331, 332, 341, and 342.

• Fence Protection System 2 (FPS-2)

• Fence Protection System 2-2R (FPS-2-2R)

Wide Area Detection/Approach Zone Sensors

• PSRS STS-350 (FLIR/ICx) Ground Based Radar used as an approach sensor out to 125 meters (crawlers) as described below: ICX application software version 2.4.41.12 Firmware version 3.4.30 dated November 2, 2007.

• PSRS STS-350 (FLIR/ICx) with control station application software version 2.4.41.12 or when integrated with Will Burt Annunciator Version 3.2.274p, subpatch p32274.1.13

• Wide-area Infrared System for Persistent Surveillance (WISP) Version 2.1 (Note: Tested as standalone wide area detection system; procuring party will be responsible for sustainment cost; Fixed Site Sustainment will not sustain the equipment)

ADDITIONAL PL-3 AND PL-4 ITEMS

In addition to the above components, the following equipment is approved for use in the protection of PL-3 and below assets.

Command, Control and Display Equipment (CCDE)

• TASS 6.0.1.A Annunciator (At deployed locations only)

• TASS 7.0 Annunciator (At deployed locations only)

Video Management Systems (VMS): None

Cameras/Imagers

• DiOP Thermal Imager 180/60mm Thermal Upgrade Kit (TUK)

• FLIR ThermoVision Multi-Sensor System (a.k.a. SLRTI)

– T-2000 LRTI w/CCTV Complete Kit IBDSS1000-085

– T-2000 LRTI w/CCTV TICC/PTH only IBDSS1000-086

– T-3000 LRTI w/CCTV Complete Kit FDTA-199

– T-3000 LRTI w/CCTV TICC/PTH only

• Short Range Thermal Imager; Fixed/Mounted (SRTI F/M)

• Surveillance Thermal Imager (WSTI) Sentry I and Sentry II

Interior Sensors: None

Exterior Sensors: None

1. GENERAL:
1.1 Description of Services/Introduction:
1.2 Background:
1.3 Scope:
1.4 Period of Performance:
1.5 General Information:
1.5.1 Quality Control: N/A
1.5.2 Quality Assurance:
1.5.3 Recognized Holidays:
1.5.4 Hours of Operation:
1.5.5 Place of Performance:
1.5.6 Type of Contract:
1.5.7 Security Requirements:
1.5.8 Special Qualifications:
1.5.9 Post Award Conference/Periodic Progress Meetings:
1.5.10 Contracting Officer Representative (COR):
1.5.11 Key Personnel:
1.5.12 Identification of Contractor Employees:
1.5.13 Contractor Travel:
1.5.14 Other Direct Costs:
1.5.15 Data Rights:
1.5.16 Organizational Conflict of Interest:
1.5.17 PHASE IN /PHASE OUT PERIOD:
2. DEFINITIONS AND ACRONYMS:
2.1 DEFINITIONS:
2.2 ACRONYMS:
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General:
4.2 Secret Facility Clearance
4.3 Materials:
4.4 Equipment:
03)Vindicator Badge Manager Upgrade IGE Part 1.pdf
Sheet1 (2)
03) Vindicator Badge Manager IGE Part 2.pdf
Sheet1 (2)
03) IGE RAB UFR.pdf
Sheet1 (2)
03)Vindicator Badge Manager Upgrade IGE Part 1.pdf
Sheet1 (2)
Blank Page
2 Purchase Request or Funding Document: F1C3455042AG03
Andersen Air Force Base Guam3 Date:
4 Requesting Unit: 36 Security Forces Squadron
BASIS OF IGERow1: Pricing based off quote received
6 Description1: AE VBM 3 Badge Manager SA Workstation
7 Qty1: 1
8 Unit of Issue1: Each
9 Unit Price1: 10944.47
Extended Price1: 10944.47
6 Description2: StarTech.com 6ft Mini DisplayPort to HDMI Cable - 4K 30hz
7 Qty2: 1
8 Unit of Issue2: Each
9 Unit Price2: 31.71
Extended Price2: 31.71
6 Description3: V5 ACS Firmware Upgrad
7 Qty3: 1
8 Unit of Issue3: Each
9 Unit Price3: 608.03
Extended Price3: 608.03
6 Description4: VBM Signature Pad
7 Qty4: 1
8 Unit of Issue4: Each
9 Unit Price4: 1080.14
Extended Price4: 1080.14
6 Description5: Fargo DTC5500LMX Card Printer with Laminator
7 Qty5: 2
8 Unit of Issue5: Each
9 Unit Price5: 7938.91

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .