Final_RFQ_F19R010002.pdf
PDF 920 KB Posted
- Attached to
- IDIQ for Technical Preservation Services at Smithsonian Federal contract opportunity
- Solicitation number
- F19R010002
About this file
RFQ document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| am_1_and_amended_RFQ_nov_30.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT 1. THIS CONTRACT IS A RATED
5. SOLICITATION TYPE2. CONTRACT NO. 4. SOLICITATION NUMBER
PAGE OF PAGES
7. ISSUED BY CODE 8. THIS ACQUISITION IS
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27
RATING
ORDER UNDER DPAS (15 CRF 350)
3. AWARD/
EFFECTIVE DATE ISSUE DATE
6. SOLICITATION
UNRESTRICTED
SET ASIDE
SMALL BUSINESS
OTHER
COMBINED SMALL BUSINESS AND
LABOR SURPLUS AREA CONCERNS
LABOR SURPLUS AREA CONCERNS
SIC:
SIZE STANDARD:
9. (AGENCY USE)
NO COLLECT CALLS
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN
DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A DIFFERENT
PERIOD) FROM THE DATE SET FORTH IN BLK 9 ABOVE, THE CONTRACTOR
AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS SOLICITED
HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE
TERMS AND CONDITIONS STATED HEREIN.
CODE 12. ADMINISTERED BY
13. CONTRACTOR/ FACILITY 14. PAYMENT WILL BE MADE BY CODE CODE
OFFEROR CODE
TELEPHONE NO.
DUNS NO.
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:
15. PROMPT PAY DISCOUNT 16. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION
10 U.S.C. 2304 (C) ( 41 U.S.C. 253 (C) (
NEGOTIATED BID (RFP)
SEALED BID (IFB)
1 9
SMITHSONIAN INSTITUTION
P.O. BOX 37012
MRC 1200
Washington DC 20013-7012
OCON
P.O. BOX 37012
MRC 1200
Washington DC 20013-7012
OCON
% FOR
CALENDAR
x
OCON
Technical Preservation Services
33330219RF0010002
17.
ITEM NO.
18.
SCHEDULE OF SUPPLIES/SERVICES
19.
QUANTITY
20.
UNIT
21.
UNIT PRICE
22.
AMOUNT
This is RFQ F19R010002 for Technical Preservation
Services.
Qualifications Statements are due December 17, 2018 at 3 pm.
Questions are due November 28, 2018.
27. SIGNATURE OF OFFEROR/CONTACTOR 28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
NAME AND TITLE OF SIGNER (TYPE OR PRINT) DATE SIGNED NAME OF CONTRACTING OFFICER (TYPE OR PRINT) DATE SIGNED
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION
NUMBER SHOWN IN BLOCK 4, INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)
Thomas Dempsey
NSN 7540-01-218-4386 1447-101 STANDARD FORM 1447 (Rev. 5-88)
Prescribed by GSA
FAR (48 CFR) 53.215-1(g)
F19R010002-Technical Preservation Services
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include ZIP Code)
WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENTS OF THE TYPE OF ITEM(S) INVOLVED.WE DO
DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE OF ITEMS INVOLVED
CANNOT MEET DELIVERY REQUIREMENT
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS
PAGE
NO RESPONSE FOR REASONS CHECKED
9 2 OF
DATE AND LOCAL TIME
AFFIX
STAMP
HERE
TO:
FROM:
SOLICITATION NO.
SMITHSONIAN INSTITUTION
P.O. BOX 37012
MRC 1200
Washington DC 20013-7012
OCON
SF 1447 (5-88) BACK
33330219RF0010002
REQUEST FOR QUALIFICATIONS
INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT FOR TECHNICAL PRESERVATION SERVICES:
SURVEY, STUDY, CONSERVATION, DESIGN AND RENOVATION OF HISTORIC ARCHITECTURE AT THE
SMITHSONIAN INSTITUTION
Solicitation number: F19R010002
Notice Type (Action Code): REQUEST FOR QUALIFICATIONS STATEMENTS (FAR 36.6)
1. BACKGROUND:
The Smithsonian seeks project teams qualified to provide technical and professional preservation services such as materials conservation, materials analysis, preservation design, construction and related services required to care for and preserve its historic museums, zoo, research and other architectural structures. This request for qualifications (RFQ) identifies the anticipated scope of work and qualifications of teams sought to provide such services, which include but are not limited to materials testing of all kinds, conservation of historic architectural fabric, laboratory techniques, technical assessments, specialized treatment, artisanal fabrication and construction services. Under the awarded contracts, task orders may be issued from time to time on an indefinite delivery, indefinite quantity (IDIQ) basis.
The Smithsonian’s building stock embodies the full range of its history—from the mid 18th century into the modern era. Smithsonian museums and other structures are significant for their historic importance as well as their iconic designs contributed by architects such as Adolph Cluss, Sir Norman Foster, and many others. The successful offerors will investigate, document, analyze, stabilize, conserve and/or renovate Smithsonian architecture to ensure their continued integrity and significance. The successful project teams will perform and services for in-house professional staff of Smithsonian Facilities and assist with consultations for end-user staff of individual museums and departments.
Submissions should reflect experience with high-profile, historic architecture with a large and continuous public visitorship, multiple agency consultations and a high degree of security requirements.
The scope of work includes all post design phase and construction phase services such as site visits, limited construction administration, shop drawings, submittal reviews, and technical assistance required for the successful treatment of Smithsonian historic structures. Project teams selected will be expected to respond to Smithsonian requests for services with expediency, attention to detail, technical skill, high quality workmanship and great sensitivity to Smithsonian history and operations. For more information on the Smithsonian’s historic structures, please see www.si.edu.
All teams must include expertise in the following areas through a combination of key personnel and specialty subcontractors:
i. Metallurgy and metal working, pressed metal, wrought metal, cast metal;
ii. Openings, including window assemblies, infill within openings;
Finishes, Coverings, Paints and Plaster;
iv. Millwork, cabinetry, profiles, sills, muntins, jambs, moldings, baseboards, wainscoting, iii.
paneling;
iv. Masonry, cladding or veneer, including ashlar or dressed masonry, rubble or rusticated masonry, dry masonry, mortar, brick work;
v. Carpentry, finished, parquetry, joinery, building construction, form work;
vii. Roofing and cladding and roof coverings of all types;
viii. Interior wall and floor coverings, wall paper, carpentry, tile, and other types;
ix. Structural Historic preservation engineering;
x. Historic preservation architectural design services;
xi. Architectural history;
xii. Building Envelope assessment, including water infiltration;
xiii. Ornamental architectural elements of any type, stained glass, beveled glass, ornamental finishes, finials, statuary, medallions, and so on;
xiv. Advocacy and record documentation including photography, scanning, written reporting and other services required for Smithsonian business continuity, agency review and/or approvals.
2. CONTRACT INFORMATION:
Contract Information
Service Type/NAICS Code
Brooks Architect-Engineer Act services/FAR 36.6
Architectural Design Services/541310
Museums/712110
Historical Sites/712120
All responsible sources, except those holding current IDIQ contracts with 3 or more years of potential extensions remaining as of the announcement date on this solicitation
Contract Structure
ID/IQ, issued as separate, firm-fixed-price task orders
Spending Limits
Unlimited annual orders, no individual order to exceed $1 million
Term
One year, with nine one year options
Ninety percent of work is anticipated to be in the Washington, DC metropolitan area including Maryland and Virginia. The remaining ten percent of the work is anticipated to be in other geographical locations where Smithsonian Institution facilities are located including Arizona, Florida, Hawaii, Massachusetts, New Jersey, New York, and Panama. The selected firms should be capable of responding to and working on two comprehensive projects concurrently. Task orders will be awarded based on the successful offeror's current workload and its ability to accomplish the order in the required time, type of services required, previous experience, including customer satisfaction, performance and quality of deliverables under the current IDIQ, and geographic location. Contracts may be issued up to one year after selection approval.
3. SCOPE OF WORK.
The Smithsonian wishes to retain project teams for projects to be awarded on an indefinite delivery, indefinite quantity basis for the following types of task orders valued from $10,000.00 to no greater than $1,000,000.00. Task orders may be awarded for discrete, minor projects; for projects to be performed in coordination with separately retained vendors; and/or for comprehensive study and assessment through construction and project closeout, performance of materials science experts, conservators, assessments, photography, scanning, A/E, fabrication or construction services on a design-bid-build or design-build basis.
1) General. Deliverables described in this section are subject to review and comment by
Smithsonian staff and external agencies. Deliverables under task orders will likely undergo multiple revisions. Where applicable, it is the Smithsonian’s expectation that the successful offerors will support SI and agency reviews through approval.
2) Pre-Treatment
a. Survey
b. Research
c. On-Site Investigation
d. Non-Destructive Testing
e. Existing Conditions Assessment
f. Destructive Testing and Laboratory Analysis
g. Archeology
3) Treatment and Design
a. Conceptual Assessment and Conservation Treatment Plan
i. Developed narrative of pre-treatment study, investigation, analysis and/or testing;
ii. Proposal of treatment concept or approach
iii. Recommendations for stabilization or selective demolition
iv. Scope definition: proposed staging, planning and coordination plans for treatment
v. Written reports, as directed.
b. Market research and acquisition plan.
i. Identification of firms for artisanal, traditional, or construction phase services required for conservation, design, construction or fabrication.
ii. Identification of materials for use in a particular application by a conventional contractor under SI supervision, including maintenance and lifecycle information in compliance with Smithsonian building standards.
c. Biddable drawings and specifications; plans of accomplishment: trades, staging, access, safety; and construction administration.
4) Construction Management
a. Constructability analysis/ Value Engineering
b. Materials selection/ coordination with construction trades
c. Fabrication/coordination with construction effort
d. Independent Fabrication or Build Out
e. Project Closeout
i. As-builts
ii. Preparation of construction documentation
5) Comprehensive Service Package
a. Pre-treatment;
b. Treatment and Design
c. Market research and acquisition plan;
d. Construction and Construction Management
e. Project Close Out
6) Documentation
a. Documentation meeting standards for the Historic American Building Survey/Historic
American Engineering Record/Historic American Landscape Survey in addition to general or specified
i. Historic Structure Report;
ii. Cultural Landscape Report;
iii. National Register nominations.
b. Photography of historic structures suitable for use as part of reporting described in this section, for Smithsonian publications, or other purposes;
c. Scanning for publication or agency review purposes;
d. Scanning for replication purposes;
e. Building Information Modeling (BIM), as requested;
f. Archaeological reports.
7) Project Team Formation. Project teams must include through personnel, subcontracting or subject matter expertise and technical skills identified in this RFQ. The prime contractor must provide technical preservation specialists with in-house personnel capable of providing
Pretreatment and Documentation services described above. Each project team must include a historic preservation architect and engineer, materials testing and conservation expertise with minimum qualifications recommended by the American Institute of Conservators (AIC);
construction, fabrication and trades expertise identified in this RFQ, and key management personnel with points of contact.
4. PRIMARY SELECTION CRITERIA: Firm evaluation will be conducted in accordance with FAR 36.6. The
Smithsonian will evaluate submissions on the basis of the following primary criteria which are listed in descending order of importance.
A. Prime contractor and subcontractors’ firm qualifications, experience and past performance in the following types of projects: assessment, reporting, conservation, materials analysis, preservation design, treatment plans, fabrication, construction and other services related to significant, historic museums, research facilities, civic structures, and sites.
The scope of the projects and the quality of the services will be considered of greater importance in the evaluation than the quantity of projects or the number of categories represented by submitted projects.
Projects submitted should demonstrate experience in addressing issues associated with the preservation of National Historic Landmarks, buildings listed on the National Register of Historic Places and/or on the historic building registers of states or other nations. Greater consideration will be given to facilities accommodating large numbers of public visitors, complex projects subject to multiple aesthethic, regulatory and security requirements involving extensive consultation and coordination with multiple professional disciplines.
B. Demonstration of experience and competence of the proposed staff with project types listed in this RFQ. The demonstrated extent of involvement and quality of staff’s contributions to projects should be emphasized. The evaluation of these disciplines will consider relevant professional licensure, education, training, and the overall quality of experience needed for each trade and skill. Responding firms must clearly identify disciplines to be performed in-house and those to be subcontracted. Firms must submit the names and supporting qualifications of all subcontractors. Firms are encouraged to minimize duplication within disciplines and in project roles in the selection of subconsultants or joint venture partners. An Organization Chart should be submitted as part of Section D that identifies firm and individual roles for Prime and Subconsultants. Key management and points of contact must also be identified.
C. Firm competence as demonstrated by past performance on contracts in terms of planning and design quality, work management, responsiveness to client requirements, quality of planning and design documents, cost control and compliance with performance schedules. A discussion of the firm’s approach in working with the Smithsonian on conservation projects shall be submitted with your SF 330 in Section H. This discussion should demonstrate past projects comparable to the Smithsonian museums on the National Mall. A past historic structure report or conservation treatment plan should be associated with one of the Example Projects provided in Section F of SF 330 and will be evaluated as a sample of the firm’s technical writing and graphic communications quality.
D. Capacity of the project team to accomplish work within specified time constraints based on submittal of firms’ current and projected workloads. Firms should demonstrate experience with complex projects, phased projects, projects involving occupied structures inside a secured perimeter or as part of a secured campus and handling multiple complex projects simultaneously. The availability of an adequate number of qualified personnel in the key disciplines shall be presented.
F. Firm location in reasonable proximity of Smithsonian Institution facilities, especially
Washington, D.C. The primary office where the work will be performed and the staffing at that office shall be clearly indicated in the firm’s planning and design approach in Section H. Prime and
Subconsultant firms located at a distance greater than 500 miles from Washington DC must explain in their approach section how they will work with the Smithsonian to minimize costs and inefficiencies associated with their more distant location.
G. Computer capability. Contractor and subcontractors must be able to comply with Smithsonian
Institution standards for documentation, drawings and specifications. These standards are available for viewing at the SI Office of Facilities Engineering and Operations Architect-Engineer Information Center website, at http://www.ofeo.si.edu/ae_center/index.asp. Required proficiencies include the following:
(1) AutoCAD 2008; (2) Microsoft Office, including Project (3) Adobe Acrobat Professional; (4)
3dimensional modeling, rendering and animation in specialized software such as Autodesk 3ds Max, Autodesk Maya; (5) Building Information Modeling in specialized software such as Autodesk Revit, Google SketchUp Pro, Graphisoft ArchiCAD, Navisworks, Onuma Planning System, as well as familiarity with IFC and Cobie file standards; (6) Experience with computer aided facilities management software such as Facility Center is highly recommended.
5. CONTRACT TERMS: The successful firm will be expected to sign a standard, unmodified, Smithsonian A-E contract, which includes standard FAR clauses governing A/E Contractor
Responsibilities as well as Smithsonian specific provisions. A full copy of these provisions will be provided upon request by the Contracting Officer identified below.
6. SELECTION & STATEMENT PREPARATION INSTRUCTIONS
A. Under this RFQ, the Smithsonian Institution will select the most qualified Offerors for task order projects as described above. Qualifications will be determined through review of your submitted
Statement of Qualifications evaluated using criteria and information requested in this RFQ. Your
Statement of Qualifications must be completed using Standard Form 330 (SF 330).
To assure your Statement is given full consideration, you must do the following:
• Read this RFQ carefully to make sure you understand what is required.
• Include all the requested information. Failure to complete any part of the statement, or failure to submit on a form other than SF 330 may result in lower consideration or being judged nonresponsive. Offerors should not assume they will be contacted for clarifications.
B. Preparation Instructions.
1) Submit the required information in pdf format using a filesharing format transmitted by email to
Eve Errickson at ErricksonE@si.edu. Your correspondence should be addressed to Smithsonian
Institution, Office of Contracting & Personal Property Management (OCON&PPM), 600 Maryland
Avenue SW, Suite 5001, Washington, DC 20024 Attention: Eve Errickson. Firms must submit
Parts I and II of the Standard Form 330 for the prime and, if applicable, joint venture(s). Part II of the SF330 must be submitted for each consultant. On SF 330, Part I, Block 5, include DUNS number for the prime firm. On the SF 330, Part I, Block F, provide the title and contract award dates for all projects listed in that section. Failure to submit the completed SF 330 may render the submission unacceptable. Part I of the SF 330 shall have a page limit of 125 one-sided pages, excluding the sample report. Font size shall not be less than 10 font. Preface the submission with a brief letter on company letterhead; please attach a copy of your most recent SAM registration confirmation.
2) The prime must include past experience as prime contractor on Comparable Projects.
Comparable Projects are those of the same or similar cost, building type, type of construction, age, safety requirements and meeting other factors listed in this RFQ.
3) Include Current references (name, address, and telephone number) for your comparable projects as listed in your submission. If the Evaluation Team is unable to contact the references listed to verify experience and performance, that project may not be considered.
C. Unsuccessful offerors will be notified at the same time as successful offerors and provided an opportunity for debriefing. A debriefing is an opportunity for the firm to understand how the
Smithsonian Institution assessed the strengths and weaknesses of its submission. Requests for debriefing must definitively state names and titles of attendees, their availability and be in writing, to be received by the Smithsonian no later than three (3) calendar days after receiving notice of your status regarding the prequalification. Email is acceptable for this purpose. Statements will not be maintained or returned. Offerors will not be reimbursed for any expense(s) incurred in developing their Statement. The Smithsonian Institution reserves the right to request project documents prior to award.
D. This (RFQ) is intended to provide all offerors with sufficient information to enable them to prepare and submit their qualifications for review and consideration by the Smithsonian Institution. The RFQ neither commits the Smithsonian Institution to pay any proposal preparation costs, nor obligates the
Smithsonian to procure or contract for construction or services. It shall not be construed as authorization to proceed with or to be reimbursed for any of the costs for any of the work specified herein. THIS IS NOT A REQUEST FOR PROPOSALS.
end of RFQ
File details come from the government source that posted it.