F19_-_FURNACE_-_AC-_REPLACENENT_1025_Chittock.docx

DOCX document 34 KB Posted

Attached to
1025 CHITTOCK ST - REPLACE FURNACE, ADD AC UNIT, REPLACE WATER HEATER
Solicitation number
2025-COMMUNITY DEVELOPMENT-013
Issued by
Kalamazoo County, Huntington Woods City, Michigan

About this file

This document is a detailed Work Write-Up for a residential home improvement project issued by the City of Jackson, Michigan, involving a property located at 1025 Chittock Ave in Jackson. The project encompasses comprehensive HVAC and plumbing upgrades, specifically including the replacement of an existing furnace with a new 95% efficient gas-fired forced air furnace, installation of a new air conditioning unit with a minimum SEER rating of 12, and replacement of the water heater. The work requires obtaining necessary permits, ensuring compliance with Michigan Mechanical and Plumbing Codes, and meeting specific installation standards such as proper ductwork, thermostat installation, and electrical connections.

The project appears to be part of a city-sponsored home improvement initiative, likely focused on residential energy efficiency and system modernization. While specific pricing details are not explicitly outlined, the work write-up indicates that the project will be competitively bid through the City of Jackson's e-Procurement Portal. Contractors must demonstrate compliance with civil rights regulations and equal employment opportunity standards. The scope of work includes technical specifications for equipment installation, code compliance, and system performance, with an emphasis on proper mechanical, electrical, and plumbing installations that meet current Michigan building and safety standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Write-Up

F19 - FURNACE - AC- REPLACENENT.

* EXHIBIT 1 *

Dated: 8/19/2024

CUSTOMER INFORMATION

Cotton, Bertha 1025 Chittock Ave, Jackson, MI 49203

PREPARED BY

sharrison@cityofjackson.org

* NOTE *

THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF

1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT

2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP

Location: Unassigned

General Requirements
Quantity
Units
Total

1 - F19 - FURNACE - AC- REPLACENENT.

(Specification ID:1.19000 Estimated Qty:0)

* PERMIT REQUIRED *

Replace existing furnace with new 95% efficient forced air, gas fired furnace bearing AGA label. Furnace output capacity shall be sufficient to heat the structure according to NWAHA standards. Installations shall comply with the current Michigan Mechanical Code. All habitable rooms, as designated by the Building Inspector, shall be supplied with warm air sufficient to maintain temperatures according to NWAHA standards. All new register installations shall be located in floor or low wall with the exception of bathrooms, which shall be wall mounted. Provide an adequate means of return air for these new supply runs. The use of ceiling diffuser outlets will be allowed only with prior approval. When new supply or returns are required and duct is run through any habitable room, it shall be enclosed in new or existing walls. Any new enclosure shall match existing surfaces. Installation shall include a register in the warm air plenum or trunkline to provide heat to the cellar and a new thermostat. A filter rack with cover shall be installed in the return air duct outside of the furnace cabinet. Whenever possible, insulate new supply and return ducts in unheated attic spaces, ventilated crawl spaces, and other exposed locations to prevent excessive heat loss. Flexible duct shall be used only in attics or crawl spaces. If not bid As a separate part of this contract, the installation shall include repair or replacement of wiring and/or plumbing necessary to comply with local code. If the existing ductwork is not to be replaced, it must be approved by the Mechanical Inspector and:

Install a new replacement UL listed AC unit. AC unit to have a minimum SEER rating of 12 and to be sized to properly cool house. Come with a manufacturer's warranty. Provide material necessary to new unit to existing duct system. Install new thermostat if necessary. Provide necessary electrical connections. Material and method of installation to comply with mechanical and electrical code requirements.

Electrical to be done by a Licensed company.

PERMIT ITEMS:

1. New wiring to code for the furnace.

2. New circuit for the water heater.

3.Install of a hard wire smoke and carbon monoxide detector in basement, to include interconnected radio frequency interconnect with 10-year lithium battery. Smokes according to MRC 2015.

Plumbing System
Quantity
Units
Total

2 - WA1 - High Efficiency unit (Specification ID:75.10000 Estimated Qty:0)

EA

* PERMIT REQUIRED *

Disconnect existing unit and remove from property. Installation of a new High efficiency unit.

Water heater shall be installed in accordance with the manufacturer's installation instructions. Electric water heaters shall conform to the requirements of the Michigan plumbing Code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Elevation of water heater ignition sources and mechanical damage protection requirements for water heaters shall be in accordance with the IMC and the IFG codes.

Appliances shall be provided with access for inspection, service, repair, and replacement without disabling the function of a fire-resistance-rated assembly or removing permanent construction, other appliances or any other piping or ducts not connected to the appliance being inspected, service, repaired or replaced. A level working space at least 30 inches deep and 30 inches wide shall be provided in front of the control side to service an appliance.

Electrical work by others, under the furnace specs

Total

Prepared By: sharrison@cityofjackson.org on 8/19/2024

OWNER ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.

x___________________________________
Owner:Date

CONTRACTOR ACCEPTS SCOPE OF WORK

I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.

x___________________________________
ContractorDate
x______________________________________
Construction SpecialistDate
Prepared By: sharrison@cityofjackson.org on 8/19/2024
4 of 4