7_Bid_Schedule.pdf

PDF 190 KB Posted

Attached to
ROAD AND PARKING REHABILITATION-BOZEMAN FTC
Solicitation number
F17PS00406
Issued by

About this file

Proposal/Bid Schedule

View the file

Other files

File Type Posted
Combined_Drawings.pdf PDF
MT80.txt TXT text file
Combined_SOW.pdf PDF
Sol_F17PS00406.pdf PDF
Instruction_to_Offerors.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B

BID SCHEDULE

REHABILITATE ROADS

BOZEMAN FISH TECHNOLOGY CENTER

BOZEMAN, MT

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached descriptions/specifications and drawings.

ITEM UNIT

NO. DESCRIPTION QTY UNIT PRICE TOTAL

1 Mobilization and Demobilization $

2 Bonding $

3 General Requirements including compaction testing, equipment rental, and other associated costs

4 Main Entrance 1,460 SY $ $ Removal of existing pavement and excavation of base course including hauling off site. Installation of geotextile, placement and compaction of new base course, and grading. Place and compact new pavement, including tack coat and prime coat.

5 Northeast Access 1,100 SY $ $ Removal of existing pavement and excavation of base course including hauling off site. Installation of geotextile, placement and compaction of new base course, and grading. Place and compact new pavement, including tack coat and prime coat.

6 Central Hatchery Access & Parking 2,170 SY $ $ Removal of existing pavement and excavation of base course including hauling off site. Installation of geotextile, placement and compaction of new base course, and grading. Place and compact new pavement, including tack coat and prime coat.

7 Southeast Hatchery Access 650 SY $ $ Removal of existing pavement and excavation of base course including hauling off site. Installation of geotextile, placement and compaction of new base course, and grading. Place and compact new pavement, including tack coat and prime coat.

8 South Entrance 450 SY $ $ Removal of existing pavement and excavation of base course including hauling off site. Installation of geotextile, placement and compaction of new base course, and grading. Place and compact new pavement, including tack coat and prime coat.

ATCH # 3

ESTIMATED

9 Feed Building Parking 370 SY $ $ Removal of existing pavement and excavation of base course including hauling off site. Installation of geotextile, placement and compaction of new base course, and grading. Place and compact new pavement, including tack coat and prime coat.

10 FWMA Access & Parking 920 SY $ $ Removal of existing pavement including hauling off site. Place and compact new pavement, including tack coat and prime coat.

11 Office & Visitor Parking 1550 SY $ $ Crack seal and fog seal coat pavement around Office Building and Utility Building. Paint pavement parking stripes, accessible symbols, and access lane markings.

12 Overhead & Profit $

TOTAL $

Quantities listed above are ESTIMATED and to be used as general idea of what would be normally anticipated in each of the areas described above. The intent is to award a contract for a FIRM FIXED PRICE TOTAL LUMP SUM to perform all of the required work for each item.

The contractor is responsible for verifying all quantities as they do their takeoff and proposal for each item.

The intent of the awarded contract will be to perform each item for the extended total lump sum amount and not intended to be a contract that all quantities are tracked and paid for by each unit of measure or unit price.

BUDGET: In the event the Grand total cost exceeds the budget and additional funding is not obtained, the items are listed in order of priority in which they will be awarded. This process could change the successful bidder: e.g. If all proposals exceed the total amount budgeted for this project; Item number 11 as proposed by each offeror will be subtracted from all offerors proposals and the new total will be evaluated to determine the lowest proposal. This process will be followed until we have a low offeror within the authorized budget.

NOTE: Offerors shall bid on all items. Incomplete offers will not be considered.

Items are listed in order of priority in which they will be awarded.