Sol_F17PS00155_Amd_0001.pdf

PDF 125 KB Posted

Attached to
REHAB JORDAN BUNKHOUSE Federal contract opportunity
Solicitation number
F17PS00155
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

F17PS00155

View the file

Other files for this federal contract opportunity

Other files attached to REHAB JORDAN BUNKHOUSE, newest first.
File Type Posted
Jordan_Bunkhouse_158400_-_GAS_FIRED_FURNACE_Rev.1_10_Mar.pdf PDF
Atch_2_Drawings_Jordan_Bunkhouse.pdf PDF
Sol_F17PS00155.pdf PDF
Atch_5_Past_Perf_Quest_Jordan_Bunkhouse.doc DOC document
Atch_4_Submittals_Jordan_Bunkhouse.xls XLS spreadsheet
Atch_1_Specs_Jordan_Bunkhouse_Rehab.pdf PDF
Atch_3_DOL_Wage_Det_Jordan_Bunkhouse.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

F17PS00155

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F06

Lakewood CO 80228-1807

134 UNION BOULEVARD

LAKE PLAZA NORTH

FWS, DIVISION OF CONTRACTING AND GE

F06

LAKEWOOD CO 80228-1807

134 UNION BOULEVARD

LAKE PLAZA NORTH

FWS, DIVISION OF CONTRACTING AND GE

03/10/20170001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/10/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: FWS

Period of Performance: 09/01/2017 to 10/31/2017

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jon Morse

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

F17PS00155-0001

CMR JORDAN BUNKHOUSE

AMENDMENT 0001

A. The purpose of this amendment is to answer contractor questions and incorporate a revised specification for the furnace.

B. The proposal due date is extended to 23 Mar 2017, Thursday.

C. The attached revised specification section 158400 dated 8 Mar 2017 is incorporated to this solicitation and replaces the original 158400 section.

D. The following is provided in response to contractor questions:

1. CONTRACTOR: Basis of design is specifically an up-flow furnace with a three ton blower. Furnace needs to be downflow and a bigger blower.

GOVERNMENT: Changed the Amana model number in the spec to a downdraft model.

2. CONTRACTOR: Please specify primary heat exchanger vs. secondary heat exchanger.

High efficiency furnaces have two heat exchangers. Most manufacturers secondary heat exchangers are stainless by default however very few manufacturers provide primary heat exchanger in stainless. This needs to be specific.

GOVERNMENT: Both heat exchangers in the Amana model specified are stainless steel.

3. CONTRACTOR: Permanent split capacitor motors are a specifically different type of motor than an ECM motor. Which do you want?

GOVERNMENT: Spec now calls for an ECM motor.

4. CONTRACTOR: The Amana you specified is a single stage compressor. Written spec requires two stage. Which do you want?

GOVERNMENT: Changed the Amana model to a two-stage compressor.

5. CONTRACTOR: The furnace for the basis of design does not have the correct blower for this size of air conditioner. (This house does not require a 3.5 ton A/C unit unless there is a special circumstance we are not seeing. If you downsize the A/C unit to three ton then the furnace does not need to be upsized to 80,000 Btu input just to satisfy the blower size for the A/C.

GOVERNMENT: Changed the spec to call for 3 tons cooling.

E. All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .