15-RF2-006_Bid_Sch_-_additives.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Crab Orchard Marina Dock System Federal contract opportunity
Solicitation number
F17PS00058
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

Bid Schedule - Additives

View the file

Other files for this federal contract opportunity

Other files attached to Crab Orchard Marina Dock System, newest first.
File Type Posted
15-RF2-006_Dwgs.pdf PDF
15-RF2-006_Bid_Sch_-_base_bid.xlsx XLSX spreadsheet
SubmittalReg.xlsx XLSX spreadsheet
Sol_F17PS00058.pdf PDF
Subsurface_investigation.pdf PDF
F17PS00058.rtf RTF text file
15-RF2-006_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

STANDARD FORM 36, JULY 1966REF NO OF DOC BEING CONT'DPAGE 1 OF 1
GENERAL SERVICES ADMINISTRATION
FED PROC. REG. (41 CFR) 1-16.101
NAME OF OFFEROR OR CONTRACTOR
BID SCHEDULE

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Furnish all labor, tools, equipment, materials,
superintendence and transportation necessary to
construct the project in accordance with the Technical
Specifications, Drawings, and terms and conditions
contained herein as follows:

SCHEDULE 2

2-1The Bid Additive #1 work includes but is not limited to:1LS
Campground Dock System Salvage - Entire boat dock system to be
salvaged (not demolished per base bid) with it dismantled, stacked
and stored (for future shipment by others) and moved from the
campground to the marina parking lot. Exact location as
directed by the Station.

Subtotal Schedule 2-1 including the Base Bid

2-2The Bid Additive #2 work includes but is not limited to:1LS
Campground Dock System Shipment - Entire salvaged and
dismantled dock system (dock sections, hardware, and poles etc.)
as noted in Bid Additive #1 will be loaded and transported in its
entirety from the campground to the Big Oaks National Wildlife
Refuge in Madison, IN. Off-loading will be by others.

Subtotal Schedule 2-2 including the Base Bid

Bid Additives are in order of acceptance.

File details come from the government source that posted it. Updated .