Project_Description_Template.xls

XLS spreadsheet 94 KB Posted

Attached to
CMc for National Air & Space Revitalization Project
Solicitation number
F16SOL10023
Issued by

View the file

Other files

File Type Posted
AM_5.pdf PDF
AM_4.pdf PDF
AM_3.pdf PDF
AM_2.pdf PDF
AM_1.pdf PDF
FINAL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Matrix

Smithsonian InstitutionComparable Projects Overview
Office of Engineering, Design and Construction
DATAPROJECT #1PROJECT #2PROJECT #3
PROJECT GENERAL INFORMATION
01.Project Title:
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same.
32.Was commissioning provided by Owner or Offeror?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)
36.Working in an Occupied Bldgs (Y/N)
37.Working in the Washington, DC area or comparable (Y/N)
38.BIM execution required (Y/N)
39.Coordination with Public or State Agencies:
KEY PERSONNEL:PROPOSED FOR THIS PROJECTPROJECT #1PROJECT #2PROJECT #3
40.Lead POC
41.Alternate POC
NOTES (referring to this sheet and all other worksheets):
(1)If the proposal is presented by a JV, indicate which member of the JV performed the project presented for past experience evaluation.
(2)Provide detailed desription at Block 42 of the single project presentation sheets.
(3)Provide reasons for delta at Block 42 of the single project presentation sheets.
(4)For projects paid in different currency, please provide the amount in US Dollars and indicate rate of exchange used for conversion at Block 42 of the single project presentation sheets.
(5)List any additional key personnel proposed for this project and/or used for past performance projects, if any.
WARNING: INPUT DATA ONLY IN YELLOW CELLS ONLY

Project #1

Smithsonian InstitutionComparable Project 1NASM Building Revitalization
Office of Engineering, Design and Construction
DATAPROJECT #10
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:41
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Cx by Offeror or Owner?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)PROJECT NARRATIVE DESCRIPTION:
36.Working in an Occupied Bldgs (Y/N)42Please include awards, if any, and challenges relevant to the minimum criteria
37.Working in the Washington, DC area or comparable (Y/N)
38.Coordination with Public or State Agencies:
KEY PERSONNEL:
39.Lead POC
40.Alternate POC

Project #2

Smithsonian InstitutionComparable Project 2NASM Building Revitalization
Office of Engineering, Design and Construction
DATAPROJECT #20
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:41
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Cx by Offeror or Owner?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)PROJECT NARRATIVE DESCRIPTION:
36.Working in an Occupied Bldgs (Y/N)42Please include awards, if any, and challenges relevant to the minimum criteria
37.Working in the Washington, DC area or comparable (Y/N)
38.Coordination with Public or State Agencies:
KEY PERSONNEL:
39.Lead POC
40.Alternate POC

Project #3

Smithsonian InstitutionComparable Project 3NASM Building Revitalization
Office of Engineering, Design and Construction
DATAPROJECT #30
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:41
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Cx by Offeror or Owner?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)PROJECT NARRATIVE DESCRIPTION:
36.Working in an Occupied Bldgs (Y/N)42Please include awards, if any, and challenges relevant to the minimum criteria
37.Working in the Washington, DC area or comparable (Y/N)
38.Coordination with Public or State Agencies:
KEY PERSONNEL:
39.Lead POC
40.Alternate POC

Non-Comp Matrix

Smithsonian InstitutionNon-Comparable Projects Overview
Office of Engineering, Design and Construction
DATAPROJECT #1PROJECT #2PROJECT #3
PROJECT GENERAL INFORMATION
01.Project Title:
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Was commissioning provided by Owner or Offeror?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)
36.Working in an Occupied Bldgs (Y/N)
37.Working in the Washington, DC area or comparable (Y/N)
38.BIM execution required (Y/N)
39.Coordination with Public or State Agencies:
KEY PERSONNEL:PROPOSED FOR THIS PROJECTPROJECT #1PROJECT #2PROJECT #3
40.Lead POC
41.Alternate POC
NOTES (referring to this sheet and all other worksheets):
(1)If the proposal is presented by a JV, indicate which member of the JV performed the project presented for past experience evaluation.
(2)Provide detailed desription at Block 42 of the single project presentation sheets.
(3)Provide reasons for delta at Block 42 of the single project presentation sheets.
(4)For projects paid in different currency, please provide the amount in US Dollars and indicate rate of exchange used for conversion at Block 42 of the single project presentation sheets.
(5)List any additional key personnel proposed for this project and/or used for past performance projects, if any.
WARNING: INPUT DATA ONLY IN YELLOW CELLS ONLY

NC #1

Smithsonian InstitutionNon-Comparable Project 1NASM Building Revitalization
Office of Engineering, Design and Construction
DATAPROJECT #10
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:41
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Cx by Offeror or Owner?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)PROJECT NARRATIVE DESCRIPTION:
36.Working in an Occupied Bldgs (Y/N)42Please include awards, if any, and challenges relevant to the minimum criteria
37.Working in the Washington, DC area or comparable (Y/N)
38.Coordination with Public or State Agencies:
KEY PERSONNEL:
39.Lead POC
40.Alternate POC

NC #2

Smithsonian InstitutionNon-Comparable Project 2NASM Building Revitalization
Office of Engineering, Design and Construction
DATAPROJECT #20
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:41
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Cx by Offeror or Owner?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)PROJECT NARRATIVE DESCRIPTION:
36.Working in an Occupied Bldgs (Y/N)42Please include awards, if any, and challenges relevant to the minimum criteria
37.Working in the Washington, DC area or comparable (Y/N)
38.Coordination with Public or State Agencies:
KEY PERSONNEL:
39.Lead POC
40.Alternate POC

NC #3

Smithsonian InstitutionNon-Comparable Project 3NASM Building Revitalization
Office of Engineering, Design and Construction
DATAPROJECT #30
PROJECT GENERAL INFORMATIONPROJECT PICTURES:
01.Project Title:41
02.Project Location:
03.Contract Number (if any):
Owner of the project
04.Name:
05.Phone number:
06.E-mail address:
Point of contact (to evaluate performance)
07.Name:
08.Role in the project:
09.Phone number:
10.E-mail address:
Alternalte point of contact (to evaluate performance)
11.Name:
12.Role in the project:
13.Phone number:
14.E-mail address:
Role of the applicant
15.Prime contractor, Joint Venture, Sub-contractor (1):
16.Percentage of work completed by applicant:
17.Type of work completed by applicant (Architectural, Structural, Mechanical, etc.) (2):
PROJECT TYPE
18.Museum, Library, Archive or Other
19.CMc (Yes/No):
PROJECT CONTRACT/ SCHEDULE DATA:
20.Contract Award Date:
21.Contract Completion (month/year, including any agreed-upon time extension):
22.Actual Completion - month/year:
23.Delta ( between above two cells) (3):
24.Amount of Award ($) (4):
25.Amount at Completion, including any agreed-upon addition/change order:
26.Delta (between above two cells) (3):
27.CPM Schedule Used (Yes or No):
28.Liquidated Damages Assessed in $: (2) (4)
PROJECT SCOPE:
29.Replacement of Exterior Stone Cladding (Y/N, + square footage replaced, %age of structure replaced)
30.HVAC/Mechanical Systems (Y/N, + $ value)
31.Was HVAC replaced in museum or library environment and designed for the express purpose of art, object, or archival conservation (Y/N) List CFM/sf for same
32.Cx by Offeror or Owner?
33.Did project include renovation of a building governed by the Secretary of Interior’s Standards on National Historic Landmarks or National Register properties or other acknowledged significance requiring adherence to design standards? (Y/N)
34.Value of the Historic Renovation scope
COMPLEXITY:
35.Complex Phasing (Y/N)PROJECT NARRATIVE DESCRIPTION:
36.Working in an Occupied Bldgs (Y/N)42Please include awards, if any, and challenges relevant to the minimum criteria
37.Working in the Washington, DC area or comparable (Y/N)
38.Coordination with Public or State Agencies:
KEY PERSONNEL:
39.Lead POC
40.Alternate POC

File details come from the government source that posted it. Updated .