Attach_2_-_Bid_Schedule.pdf

PDF 15 KB Posted

Attached to
Rehab Electrical Power Transmission System for Farallon NWR
Solicitation number
F15PS00757
Issued by

About this file

Bid Schedule

View the file

Other files

File Type Posted
Attach_5_-_Farallons_Site_Plan.pdf PDF
Attach_6-Sol_contract_clauses.rtf RTF text file
Attach_3-_Statement_of_Work.pdf PDF
Sol_F15PS00757.pdf PDF
Attach_7_-_Wage_Determination.docx DOCX document
Attach_1-Cover_Letter.docx DOCX document
Attach_4_-_Farallon_Electrical_Drawings1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule for

ELECTRICAL POWER TRANSMISSION SYSTEM REHABILITATION

at the

Farallon National Wildlife Refuge near

San Francisco, CA

Item No.

Description

Estimated Quantity

Unit

Unit Price

Total Cost

1 Mobilization 1 LS ________ __________

2 East Landing Derrick Electrical System Upgrade

1 LS ________ __________

3 Carpentry Shop & Pump House Electrical System Upgrade

1 LS ________ __________

4 Lighthouse Electrical System Upgrade

1 LS ________ __________

5 Powerhouse Electrical System Upgrade

1 LS ________ __________

6 East Landing Panelbox & Load Center Upgrade.

1 LS ________ __________

7 Powerhouse-Residences Conduit & Conductors Replacement

1 LS ________ __________

8 CG House-Lighthouse Conductors Replacement

1 LS ________ __________

11 Traveler Daily Delay Rate 1 EA ________ As Needed 12 Alternative Demobilization

Transport 1 LS ________ As Needed Total __________

Incomplete Bids will not be considered.

Name of Bidder and Company

Address (Include Zip Code)

* - Due to budget constraints one or more of these items may be eliminated depending on the availability of funds.