F15PS00594 _Q A_2.pdf
PDF 38 KB Posted
- Solicitation number
- F15PS00594
About this file
Questions and Answers 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_F15PS00594_Amd_000005.pdf | ||
| Sol_F15PS00594_Amd_000004.pdf | ||
| Sol_F15PS00594_Amd_000003.pdf | ||
| Sol_F15PS00594_Amd_000002.pdf | ||
| F15PS00594 _Q A.docx | DOCX document | |
| Sol_F15PS00594_Amd_000001.pdf | ||
| boatstorageplot.pdf | ||
| Sol_F15PS00594.pdf | ||
| F15PS00594 _Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Contractor
1. Was the site visit on 5/27/2015 considered a mandatory requirement for bidding this project?
No. Site visit was not a mandatory requirement for bidding on this project.
2. If one bids only Alternate Bid Item 02 (WOOD) and not the Base Bid Item 01 (STEEL) will their a bid be accepted or rejected?
Contractor is not required to submit bids on both Base Bid Item 01 and Alternate Bid Item 02.
3. 20.8 Bollards.... if required at personnel doors the count would be (10) rather than (6) as noted. Please clarify.
(6) bollards.
4. Is an architectural stamp required for this project or will an engineering stamp be sufficient.
PE stamp from Maine is acceptable. For sure.
5. The roll-up garage doors, are they intended to be actual roll-up type or sectional overhead doors.
Insulated sectional overhead doors R-12 or better.
6. Are the garage doors to be manually operated?
Overhead doors will be manual.