FIRST ARTICLE REPORT.pdf

PDF 113 KB Posted

Attached to
F-15 Elastomer Pad (FA8203-25-Q-0003) Federal contract opportunity
Solicitation number
F15ElastomerPad
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This First Article Requirements document outlines the technical and testing requirements for a single unit (Lot/Item 1) with NSN 1680016917833LE for the F-15 Elastomer Pad contract. The document specifies that the first article will be part of the production quantity, will not serve as a manufacturing standard, and requires government testing to confirm performance characteristics and conformance with all drawings, specifications, and engineering data requirements.

Key requirements include delivering the first article within 180 calendar days from the contract date to Hill Air Force Base, with government testing estimated to cost $2,000. The contractor must manufacture the first article at the same production facilities as the future contract items. The government reserves the right to thoroughly assess materials and process certifications, with a vendor typically allowed only one attempt to receive full or conditional approval. Failure to receive first article approval may result in contract termination, and the testing requirements will be determined by the Cognizant Engineering Organization based on component criticality and complexity.

View the file

Other files for this federal contract opportunity

Other files attached to F-15 Elastomer Pad (FA8203-25-Q-0003), newest first.
File Type Posted
Amendment 0004 FA820325Q0004.pdf PDF
FA820325Q0003 Amendment 0003.pdf PDF
FA8203-25-Q-0003 Copy of Amendment.pdf PDF
FA820325Q0003.pdf PDF
CDRL FA REPORT.pdf PDF
EvaluationCriteria.pdf PDF
Bid Set.pdf PDF
MQR.pdf PDF
ENGINNER DATA LIST.pdf PDF
FA820325Q0003 Contract ACPS.pdf PDF
PACKAGING REQUIRMENTS.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

12 AUG 2021(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

98747 / 201416723-30

4. NSN

1680016917833LE

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are include conformance with all drawings, specifications, and engineering data requirements.

B. The detailed technical requirements for First Article approval tests are contained in the specifications included in this contract.

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

809 MXSS/MXDEB along with the part.

(4) Government written notice of approval / disapproval due

(2) Due

(1) DD Form 1423 ELIN days after receipt of contractor's report.120 calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 1Generated by PRPS using Jasper Reports on 06 Mar 2025

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 180 calendar days from date contract.

(2) Notify 15 calendar days prior to shipment.

(3) Delivered to government at

"First Article, Do Not Post"

FB2029 809 MXSS/MXDEB

Bldg 849 Attn: Non Accountable Bay

Hill Air Force Base, UT 84056-5713

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 120 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$2,000.0000

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to supply.

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by 809 MXSS/MXDEB pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

AFMC IMT 260, 20230316, V-5,

Version 1Generated by PRPS using Jasper Reports on 06 Mar 2025

12. REMARKS

CARRANZA-SAUCEDO, NerehidaNAME: 21 SEP 2021DATE:

A. Item 1 of section F, FIRST ARTICLE DELIVERY, is an engineering estimate and is not contractually binding. First article delivery schedule is defined in the approved and signed contract document.

B. The critical nature of this part requires a First Article from a contractor who has never produced the item or has not produced the item for an extended period of time. The Government reserves the right to assure all materials and process certifications are correct and to test the item to any and/or all drawings, specifications, and other contract requirements. A vendor will normally be allowed only one attempt to receive full or conditional approval. Failure to receive approval of First Article inspection may, at the discretion of the Government, result in termination of the contract.

C. First Article waiver approvals as well as similar item determination are solely the responsibility of the Cognizant Engineering Organization. First article waiver requests based on similarity will not be approved for Critical Safety Items (CSI). Similar item is defined as an item that has been previously manufactured to the same drawing but is the opposite hand and/or has a different dash number.

D. The Cognizant Engineering Organization shall determine First Article testing requirements based on component criticality and complexity, regardless of Purchase Request value.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

CARRANZA-SAUCEDO, Nerehida

417 SCMS / GU E A

801-777-7383

777-7383

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

CARRANZA-SAUCEDO, Nerehida

417 SCMS / GU E A

801-777-7383

777-7383

AFMC IMT 260, 20230316, V-5,

Version 1Generated by PRPS using Jasper Reports on 06 Mar 2025

File details come from the government source that posted it. Updated .