F02884 - Lytle Creek Gatehouse Tainter Gate - Plans~1.pdf
PDF 5 MB Posted
- Solicitation number
- PWG127-LANDD-6501
- Issued by
- San Bernardino County, San Francisco City, California
About this file
This is a set of construction plans and technical drawings for the San Bernardino County Flood Control District's Lytle Creek Gatehouse Tainter Gate Controls Power System Repair project located in San Bernardino, California. The project involves comprehensive renovation of the electrical control and power systems for the Tainter gate mechanism, including demolition of existing equipment, refurbishment of select components, and installation of new electrical infrastructure. The work encompasses removal and replacement of switchboards, circuit breakers, transformers, motor controllers, panelboards, conduit systems, and lighting fixtures, as well as refurbishment of the existing motor, brake assembly, and limit switch controls. The project also includes core drilling through concrete walls for conduit routing, installation of GFCI receptacles, new lighting fixtures with photometric calculations, and provision of temporary power solutions during construction. All work must comply with the National Electrical Code, and the facility's Tainter gate operation must be tested and commissioned using both grid power and emergency generator power to ensure smooth raise and lower operations without binding or unusual noise.
The plans specify that the contractor must provide complete record sets of all drawings documenting field changes, maintain these on-site throughout the project, and repair all surfaces upon equipment demolition to match existing finishes. The contractor is responsible for all temporary equipment and power solutions subject to San Bernardino County approval. Existing 240-volt three-phase power is currently available but in the off position. The contractor may reuse existing branch circuit conduits at their own risk provided they can be cleared, but all branch conductors must be new and all reused conduits must be thoroughly cleaned prior to installation. The building's concrete construction requires core drilling for branch circuit conduit routing. Panelboards, circuit breakers, and motor controllers must be provided by the same manufacturer. Testing procedures require detailed multi-step validation protocols including limit switch adjustments, operator station testing with both stop and continue functions, and commissioning with generator power after confirming proper phase rotation to prevent equipment damage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
COVER SHEET
E0
E0.dwg
SAN BERNARDINO COUNTY
FLOOD CONTROL DISTRICT
PLANS FOR CONSTRUCTION OF
SAN
BE
RN
AR
D I
NO
COUNTY FLOOD CONTROL
DISTRICT
CAL IFORN IA
LYTLE CREEK GATEHOUSE TAINTER GATE
CONTROLS POWER SYSTEM REPAIR
IN THE CITY OF
SAN BERNARDINO COUNTY
WORK ORDER NO. F02651 SYSTEM NO. 2-211-5A
PROJECT
SCOPE
LOCATION
PLAN
NORTH
E FOOTHILL BLVD
W 5TH ST
ENTRANCE
TO SITE
LOCATION
LYTLE-CAJON
CHANNEL
EAST BRANCH
LYTLE CREEK
W 4TH ST
SHEET NUMBER SHEET TITLE
E0 COVER SHEET
E1 TITLE SHEET
E2 SITE PLAN DEMOLITION
E3 SINGLE LINE DIAGRAM DEMOLITION
E4 ELECTRICAL DEMOLITION DETAILS
E5 SITE PLAN NEW WORK
E6 SITE PLAN NEW WORK RECEPTACLES
E7 LIGHTING PLAN NEW WORK
E8 PHOTOMETRICS PLAN NEW WORK
E9 SINGLE LINE DIAGRAM NEW WORK
E10 CONDUIT SCHEDULE
E11 WIRING DIAGRAM
E12 PANEL LAYOUT
E13 ELECTRICAL BLOCK DIAGRAM
E14 ELECTRICAL DETAILS
E15 PANEL B AND HOIST CONTROLLER ELEVATION
E16 GENERATOR ROOM ELEVATION
06/06/2025 06/06/2025
03/24/2025
6/23/2025
F02884 N/A
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
TITLE SHEET
E1
E1.dwg
22KAIC
225AF
3P
225AT
M
PH OR
1. THE CONTRACTOR MUST PROVIDE AND KEEP UP-TO-DATE A COMPLETE RECORD SET OF DRAWINGS. THESE PRINTS MUST SHOW EVERY CHANGE MADE IN THE FIELD FROM THE ORIGINAL DRAWINGS. THIS SET OF DRAWINGS MUST BE KEPT ON THE JOB
SITE AT ALL TIMES.
2. CONTRACTOR MUST PATCH, REPAIR, AND PAINT SURFACES UPON DEMOLITION OF EQUIPMENT TO MATCH EXISTING FINISH.
3. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY EQUIPMENT REQUIRED FOR PROJECT COMPLETION.
4. THIS FACILITY CURRENTLY HAS 240 VOLT (3PHASE 3W AND SINGLE PHASE 120/240 3W) POWER TO THE (2) MAIN CIRCUIT BREAKERS INSIDE THE FACILITY. THESE CIRCUIT BREAKERS ARE IN THE "OFF" POSITION. CONTRACTOR WILL NEED TO PROVIDE PORTABLE LIGHTING AND POWER FOR CONSTRUCTION WORK AND/OR PROVIDE EQUIPMENT FOR TEMPORARY POWER. ALL
TEMPORARY POWER SOLUTIONS SHALL BE REVIEWED BY SAN BERNARDINO COUNTY.
5. POWER CONDUITS WILL BE RE-USED FOR THE MAIN EQUIPMENT. CONTRACTOR SHALL USE A CABLE LOOSENING SOLUTION
SUCH AS POLYWATER CABLE FREE TO REMOVE CABLES.
6. CONTRACTOR MAY USE EXISTING BRANCH CIRCUIT CONDUITS AT HIS/HER OWN RISK IF THEY CAN BE CLEARED. ALL BRANCH
CONDUCTORS SHALL BE NEW.
7. ALL BRANCH CONDUITS TO BE RE-USED SHALL BE THOROUGHLY CLEANED PRIOR TO NEW CONDUCTOR INSTALLATION.
8. PANELBOARDS, CIRCUIT BREAKERS AND MOTOR CONTROLLERS SHALL BE PROVIDED BY THE SAME MANUFACTURER.
9. THE BUILDING IS CONSTRUCTED OF CONCRETE. BRANCH CIRCUIT CONDUIT ROUTING WILL REQUIRE CORE DRILLING.
10. THE EXISTING MOTOR AND BRAKE SHALL BE REMOVED AND SENT TO A MOTOR REFURBISHING SHOP. SEE SPECIFICATIONS FOR
MORE INSTRUCTIONS.
11. WORM GEAR LIMIT SWITCH BOX SHALL BE LEFT IN PLACE, THOROUGHLY CLEANED, AND PROVIDED WITH NEW GASKET. REPLACE
THE 4 LIMIT SWITCHES EXACTLY IN SAME PLACE.
A3 E501
A4
E301
IDENTIFICATION NUMBER BASED ON
SHEET GRID COORDINATES
CROSS SECTION
DETAIL REFERENCE
P-XX C-XX
PHASE
MOTOR CONNECTION
JUNCTION OF OUTLET BOX CEILING OR WALL MOUNTED AS INDICATED.
SURFACE MOUNT UON.
DUPLEX RECEPTACLE, SURFACE MOUNTED, THE BOTTOM OF THE
OUTLET SHALL BE INSTALLED NOT LESS THAN 15" AFF UNLESS NOTED
OTHERWISE.
SURFACE MOUNTED PANELBOARD
POWER TRANSFORMER
GROUND
CABLE TAP
DELTA CONFIGURATION
CONTACTOR
METER
CIRCUIT BREAKER
NUMBER OF POLES
AMPS FRAME
AMPS TRIP
KAIC RATING
FUSE DISCONNECT SWITCH
LIGHT SWITCH
3 INDICATES A 3 WAY SWITCH
a INDICATES ASSOCIATED CIRCUIT TO SWITCH
GROUND ROD
WIRING OR CONDUIT EXPOSED
WIRING OR CONDUIT CONCEALED UNDERGROUND, OR IN FLOORS
FLEXIBLE CONDUIT
CONDUIT DESIGNATION
JJ
M a
1. CONTRACTOR SHALL PERFORM DEMOLITION WORK. MATERIALS THAT ARE DESCRIBED TO BE REFURBISHED OR REWORKED SHALL BE PROTECTED, MATERIALS TO BE DELIVERED SHALL BE DROPPED OFF IN GOOD CONDITION, AND ALL OTHER
MATERIALS TO BE DEMOLISHED ARE TO BE DISPOSED OF.
2. MATERIALS TO BE REFURBISHED SHALL BE TAKEN TO UL 508 SHOP AND REFURBISHED AS DESCRIBED IN SPECIFICATIONS.
3. NEW WORK SHALL BE PERFORMED AS CALLED OUT IN DRAWINGS, REFURBISHED MATERIALS SHALL BE REINSTALLED IN PLACE
AND NEW MATERIALS PROVIDED AS DESCRIBED.
4. ALL EQUIPMENT SHALL BE TESTED AND COMMISSIONED TO OPERATE TO THE SATISFACTION OF THE END USER AND THE AUTHORITY HAVING JURISDICTION. UNSATISFACTORY RESULTS WILL BE CORRECTED AND RETESTED/COMMISSIONED TO
COMPLIANCE.
THE TAINTER GATE OPERATION WILL BE TESTED AT INTERVALS ESTABLISHED BY THE OWNER, AND WILL BE TESTED FIRST USING GRID POWER, AND THEN AGAIN USING EMERGENCY GENERATOR POWER. A FULL RAISE AND LOWER OPERATION WILL BE PERFORMED USING
EACH POWER SOURCE.
NOTE 1: BEFORE MOVING THE TAINTER GATE, MAKE SURE THAT THE UPPER AREA NEAR THE HOIST EQUIPMENT AND ALSO THE AREA BELOW WHERE THE GATE IS ACTUALLY MOVING IS CLEAR OF ALL PERSONNEL AND THAT EVERYONE AT SITE IS NOTIFIED WHEN THE
GATE WILL BE MOVING.
NOTE 2: IF ANY OF THESE STEPS ARE UNSUCCESSFUL, STOP THE TESTING PROCESS IMMEDIATELY AND TROUBLESHOOT AND REPAIR THE ROOT CAUSE OF THE FAILURE BEFORE PROCEEDING. IF AT ANY TIME THE MOTION OF THE GATE NEEDS TO BE STOPPED, PRESS THE
STOP BUTTON ON THE TAINTER GATE CONTROL PANEL OR REMOTE STATION.
NOTE 3: POST OBSERVERS OUTSIDE WITH A RADIO OR MOBILE PHONE AND A CLEAR VIEW OF THE TAINTER GATE AND NEAR THE REMOTE CONTROL STATION TO CLOSELY OBSERVE THE GATE DURING OPERATION. CONFIRM THAT THE GATE IS OPERATING SMOOTHLY WITHOUT ANY BINDING OR LOUD NOISES. KEEP A SAFE DISTANCE FROM THE MOVING PARTS IN CASE OF A SUDDEN MECHANICAL
FAILURE.
NOTE 4: DURING FIRST COMISSIONING AFTER LIMIT SWITCHES HAVE BEEN REPLACED, THE LOCATION OF THE TAINTER GATE IS TO BE MANUALLY RECORDED AS IT IS OPEARTING AND THE LIMIT SWITCHES ARE TO BE ADJUSTED IF NECESSARY TO INDICATE THE POSITION OF THE GATE AS IT OPERATES. ADJUST AS MANY TIMES AS NECESSARY TO THE SATISFACTION OF THE AUTHORITY HAVING
JURISDICTION.
1. STEP 1
A. CONFIRM THAT THE GENERATOR/GRID SELECTOR SWITCH IS IN THE GRID POSITION
2. STEP 2
A. ON THE HOIST CONTROLLER PANEL, TURN THE POWER SWITCH TO THE ON POSITION
B. THE WHITE INDICATOR LIGHT SHOULD ILLUMINATE CONFIRMING THAT THE POWER IS ON
C. ON THE TAINTER GATE CONTROL PANEL, THE POSITION DIAL LIGHT SHOULD ALSO BE ILLUMINATED
3. STEP 3
A. OBSERVE THE TAINTER GATE CONTROL PANEL INDICATOR LIGHTS TO CONFIRM THAT THE CURRENT POSITION OF THE TAINTER
GATE IS AT THE LOWER LIMIT POSITION
B. IF THE LOWER LIMIT INDICATOR LIGHT IS LIT, PROCEED TO STEP 4
C. IF THE TAINTER GATE IS NOT AT THE LOWER LIMIT POSITION, PRESS THE LOWER PUSHBUTTON AND ALLOW THE GATE TO LOWER
UNTIL THE LOWER LIMIT INDICATOR LIGHT IS LIT
4. STEP 4
A. TWIST THE BACKOUT SWITCH IN THE LOWER DIRECTION (CCW) AND LOWER THE GATE UNTIL THE LOWER OVER TRAVEL INDICATOR
LIGHT ILLUMINATES. THE GATE SHOULD NOW BE AT ITS EXTREME LOWER POSITION.
5. STEP 5
A. ONCE THE LOWER OVER TRAVEL POSITION IS CONFIRMED, PRESS THE RAISE PUSHBUTTON.
B. THE GATE SHOULD BEGIN TO SLOWLY RAISE PAST THE LOWER LIMIT POSITION ALL THE WAY UP TO THE RAISE LIMIT POSITION.
C. AS THE GATE IS MOVING UPWARD, THE RAISE LIMIT INDICATOR LIGHT ON THE TAINTER GATE CONTROL PANEL AND THE RAISE
PUSHBUTTON ON THE REMOTE CONTROL STATION SHOULD BLINK.
D. AS THE GATE IS RAISING, PRESS THE STOP BUTTON ON THE REMOTE CONTROL STATION AND CONFIRM THAT THE GATE STOPS
MOVING.
E. PRESS THE RAISE BUTTON ON THE REMOTE CONTROL STATION AND CONFIRM THAT THE GATE CONTINUES RAISING.
F. WHEN THE GATE IS AT ITS FULL UPWARD TRAVEL POSITION, THE RAISE LIMIT INDICATOR LIGHT ON THE TAINTER GATE CONTROL PANEL AND THE RAISE PUSHBUTTON ON THE REMOTE CONTROL STATION SHOULD ON STEADY AND THE GATE SHOULD STOP MOVING
AND BE AT THE FULL RAISED POSITION.
6. ONCE THE GATE IS CONFIRMED AT THE RAISE LIMIT POSITION, TWIST THE BACKOUT SWITCH IN THE RAISE DIRECTION (CW) AND RAISE THE GATE UNTIL THE RAISE OVER TRAVEL INDICATOR LIGHT ILLUMINATES. THE GATE SHOULD STOP MOVING IN A MOMENT AND BE AT
ITS EXTREME RAISED POSITION.
7. ONCE THE GATE IS CONFIRMED AT THE RAISE OVER TRAVEL POSITION, PRESS THE LOWER PUSHBUTTON ON THE TAINTER GATE
CONTROL PANEL OR REMOTE CONTROL STATION.
A. THE GATE SHOULD BEGIN LOWERING AND THE LOWER LIMIT INDICATOR LIGHT ON THE TAINTER GATE CONTROL PANEL AND THE
LOWER PUSHBUTTON ON THE REMOTE CONTROL STATION SHOULD BLINK.
B. AS THE GATE IS LOWERING, PRESS THE STOP BUTTON ON THE REMOTE CONTROL STATION AND CONFIRM THAT THE GATE STOPS
MOVING.
C. PRESS THE LOWER BUTTON ON THE REMOTE CONTROL STATION AND CONFIRM THAT THE GATE CONTINUES LOWERING.
D. WHEN THE GATE IS AT ITS FULL DOWNWARD TRAVEL POSITION, THE LOWER LIMIT INDICATOR LIGHT ON THE TAINTER GATE CONTROL PANEL AND THE LOWER PUSHBUTTON ON THE REMOTE CONTROL STATION SHOULD ON STEADY AND THE GATE SHOULD
STOP MOVING AND BE AT THE FULL LOWERED POSITION.
8. THIS COMPLETES THE TESTING OF THE TAINTER GATE OPERATION ON GRID POWER. AT THIS POINT, TURN OFF THE POWER, CONNECT THE GENERATOR AND TURN THE GENERATOR/GRID SELECTOR SWITCH TO THE GENERATOR POSITION. NEXT, START THE GENERATOR, CLOSE THE BREAKER AND REPEAT STEPS 2-7 IN THE SEQUENCE ABOVE.
9. ONCE THE TESTING IS COMPLETE, TURN OFF THE POWER AND RETURN THE GENERATOR/GRID SELECTOR SWITCH TO THE GRID
POSITION.
NOTE 5: EQUIPMENT DAMAGE WARNING. THIS IS A 240VAC THREE PHASE SYSTEM. CONFIRM THAT THE GENERATOR IS SET UP FOR 240VAC
OPERATION OR EXTREME EQUIPMENT DAMAGE AND INJURY RISK TO PERSONNEL WILL RESULT.
NOTE 6: EQUIPMENT DAMAGE WARNING. WHEN OPERATING IN GENERATOR MODE, THE MOTOR/PHASE ROTATION DIRECTION MUST BE IMMEDIATELY CHECKED WHEN THE TEST IS STARTED. IF THE MOTOR IS RUNNING THE WRONG DIRECTION, THE PHASE ROTATION MUST BE IMMEDIATELY CORRECTED AT THE GENERATOR OR EXTREME EQUIPMENT DAMAGE AND INJURY RISK TO PERSONNEL WILL RESULT.
AS
AT
ATS
AFF
C
CKT CT
DWG
(E)
ELEC
EMT
GEN
GFCI
GND,G
FLA
KV KVA
KW
LTG
MCB
MCC
MTD
MTS
MFR
MSB
NO.
NTS
NEMA
PLC
PM
PNL
RGS
SHT
SM
SWT
TYP
UL
UON
V
XFMR
AMP SWITCH
AMP TRIP
AUTOMATIC TRANSFER SWITCH
ABOVE FINISHED FLOOR
CONDUCTOR, CONDUIT
CIRCUIT
CURRENT TRANSFORMER
DRAWING
EXISTING
ELECTRICAL
ELECTRICAL METALLIC TUBING
GENERATOR
GROUND FAULT INTERRUPTER
GROUND
FULL LOAD AMPS
KILOVOLTS
KILOVOLT-AMPERE
KILOWATT
LIGHTING
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOUNTED
MANUAL TRANSFER SWITCH
MANUFACTURER
MAIN SWITCHBOARD
NUMBER
NOT TO SCALE
NATIONAL ELECTRIC CODE
PROGRAMMABLE LOGIC CONTROLLER
POWER METER
PANEL
RIGID GALVANIZED STEEL
SHEET
SINGLE MODE
SWITCH
TYPICAL
UNDERWRITER'S LABORATORY
UNLESS OTHERWISE NOTED
VOLTAGE
TRANSFORMER
SHEET DETAIL APPEARS ON.
06/06/2025 06/06/2025
ASSISTANT DIRECTOR DATE
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
SITE PLAN DEMOLITION
E2
E2.dwg
KEY NOTES DEMOLITION
DISCONNECT AND REMOVE WIRING CONDUIT TO BE
PROTECTED IN PLACE.
SCE TO REMOVE METERS. DISCONNECT AND REMOVE
METER SOCKETS. PROTECT ENCLOSURE IN PLACE.
DISCONNECT AND REMOVE SWITCHBOARD, AND
TRANSFER SWITCHES.
DISCONNECT AND REMOVE GENERATOR SET AND
ASSOCIATED SUB BASE. DELIVER TO 210 LENA ROAD,
SAN BERNARDINO. CONTRACTOR TO LIFT AND PLACE
BY DIRECTION OF COUNTY.
DISCONNECT AND REMOVE (3) SMALL WALL MOUNTED
TRANSFORMERS.
DISCONNECT AND REMOVE PANEL INTERIORS.
ENCLOSURES TO BE PROTECTED IN PLACE.
DISCONNECT AND REMOVE CONTROL WIRING AND
ASSOCIATED INSTRUMENTS AND PILOT DEVICES.
MOTOR AND BRAKE ASSEMBLY SHALL BE
DISCONNECTED, REMOVED AND BROUGHT TO
MACHINE SHOP FOR REWORK AS SPECIFIED.
DISCONNECT AND REMOVE RECEPTACLE. JBOX TO BE
PROTECTED IN PLACE.
DISCONNECT AND REMOVE EXTERIOR LIGHT FIXTURE,
AND ANY REMAINING WIRING BACK TO SOURCE. PATCH
UP SOFFIT IN ROOF OVERHANG.
DISCONNECT AND REMOVE LIGHT SWITCH. JBOX TO BE
PROTECTED IN PLACE.
DISCONNECT AND REMOVE LIMIT SWITCHES. WORM
GEAR AND BOX TO BE PROTECTED IN PLACE.
DISCONNECT AND REMOVE INTERIOR LIGHT FIXTURE.
DISCONNECT EXISTING INTERCONNECTION WIRING.
REMOVE DOOR AND REPLACE DEVICES AS INDICATED.
4' 12'0 8'2'1'
PLAN
NORTH
SITE PLAN DEMOLITION1 SCALE: 1/4" = 1'-0"
(TYP.)
OF 6
HALL
LAVATORY
STORAGE
ROOM
CONTROL ROOM
EXISTING SWITCHBOARD
GENERATOR ROOMEXISTING TAINTER GATE
CONTROL PANEL
EXISTING HOIST
CONTROLLER
EXISTING JUNCTION BOX
LIMIT SWITCH BOX
LEFT HOIST UNIT
HOIST BRAKE
AND MOTOR
BACK OF PIER WALL
EXISTING LEFT PIER WALL
TRY OUT PUSH BUTTON STATION
SCE TO DISCONNECT
1PH WEATHERHEAD
JUMPER PER SERVICE
REQUEST 3844464
ROOF OVERHANG
EXISTING PANELS
9 (TYP)
EXISTING STANDBY UNIT
3Ø
1Ø
(TYP)
13(TYP.)
OF 4
ACOE CONTROL
REFER TO PHOTOS ON DWG E-4
SEE PHOTO 1
SEE PHOTO 2
SEE PHOTO 3
SEE PHOTO 4
SEE PHOTO 5
SEE PHOTO 6
06/06/2025
06/06/2025
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
SINGLE LINE DIAGRAM DEMOLITION
E3
E3.dwg
100AF
90AT
3P
M
100AF
70AT
2P
M
100AF
70AT
3P
G
ASA
VSV
TGC
• M
AS A
VS V
(LTG)
1.6kW
5 kVA 240 to 240/120V
FM 2S, 200AFM 12S, 200A
1Ø, 3W3Ø, 4W
MANUAL
TRANSFER
SWITCH
MANUAL
TRANSFER
SWITCH
GENERATOR
KEY NOTES DEMOLITION
DISCONNECT AND REMOVE WIRING
CONDUIT TO BE PROTECTED IN PLACE.
SCE TO REMOVE METERS. DISCONNECT
AND REMOVE METER SOCKETS. PROTECT
ENCLOSURE IN PLACE.
DISCONNECT AND REMOVE SWITCHBOARD,
AND TRANSFER SWITCH.
DISCONNECT AND REMOVE GENERATOR
SET AND ASSOCIATED SUB BASE. DELIVER
TO 210 LENA ROAD, SAN BERNARDINO.
CONTRACTOR TO LIFE AND PLACE BY
DIRECTION OF COUNTY.
DISCONNECT AND REMOVE 3
TRANSFORMERS.
DISCONNECT AND REMOVE PANEL
INTERIORS.
DISCONNECT AND REMOVE CONTROL
WIRING AND ASSOCIATED INSTRUMENTS
AND PILOT DEVICES.
MOTOR AND BRAKE ASSEMBLY SHALL BE
DISCONNECTED, REMOVED AND BROUGHT
TO MACHINE SHOP FOR REWORK AS
SPECIFIED.
DISCONNECT EXISTING INTERCONNECTION
WIRING, REMOVE DOOR AND REPLACE
DEVICES AS INDICATED.
SCE TO DISCONNECT 1PH
WEATHERHEAD JUMPER
6 7
240V, 3P, 4W
SCE POLE
OPEN DELTA
TAINTER GATE
CONTROL PANEL
TRYOUT
STATION
REVERSIBLE
MOTOR
CONTROLLER
GATE MOTOR
W/ BRAKE
SOLENOID 666
PANEL
PANEL
PANEL
SINGLE LINE DIAGRAM-DEMOLITION1 SCALE: NO SCALE
06/06/2025 06/06/2025
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
ELECTRICAL DEMOLITION DETAILS
E4
E4.dwg
TAINTER GATE CONTROL PANEL ELEVATION
SCALE: NOT TO SCALE
SWITCHBOARD
SCALE: NOT TO SCALE1 2
SCE SERVICE
SCALE: NOT TO SCALE
1-1/2" EMT
CONDUIT TO
BE REMOVED
CAP CONDUIT IN PLACE.
1-1/2" CONDUIT
METERS TO BE REMOVED
BY SCE. CONTRACTOR TO
REMOVE METER SOCKETS
1-1/2" CONDUIT TO BE
REMOVED
EXISTING 1-1/2" CONDUIT
PROTECT IN PLACE FOR REUSE
CAP CONDUIT IN PLACE.
CAP CONDUIT IN PLACE.
MOTOR BRAKE
SCALE: NOT TO SCALE
HOIST CONTROLLER PANEL
SCALE: NOT TO SCALE4 5
PANEL DOOR TO BE REMOVED
AND REFURBISHED AS
INDICATED.
PANEL INTERIOR
DEVICES TO BE
REMOVED AND
DEMOLISHED
ENTIRE
ENCLOSURE TO
BE DEMOLISHED
CONDUIT
STUBUPS TO BE
PROTECTED FOR
REUSE. IF
CONDUITS ARE
NOT REUSED
THEY ARE TO BE
CAPPED.
MECHANICAL BRAKE,
TO BE REFURBISHED
AND REINSTALLED IN
PLACE. THOROUGHLY
CLEAN AND INSPECT
THE ROTORS AND
CALIPERS, RESURFACE
ROTORS AS
NECESSARY, REPLACE
PADS
PANEL INTERIOR
DEVICES TO BE
REMOVED AND
DEMOLISHED
PANEL ENCLOSURE TO
BE REFURBISHED AND
REUSED IN PLACE.
LIMIT SWITCH
TO BE PLACED
IN EXACT SAME
LOCATION
TRAVELER TO BE
CLEANED AND
PROTECTED IN PLACE
LIMIT SWITCH, TO BE
PLACED IN EXACT
SAME LOCATION
THOROUGHLY CLEAN
LIMIT SWITCH BOX.
PROVIDE NEW GASKET
COVER
LIMIT SWITCH BOX6
CONTRACTOR IS TO
USE MEANS AND
METHODS, EITHER
CHAIN AND LOCK
CLEVELAND GEARBOX
GEARS IN PLACE, OR
MANUALLY LOWER THE
GATE INTO A RESTING
POSTION BEFORE
DISMANTLING THE
MOTOR, GEAR SHAFT
AND BRAKE
CLEVELAND GEARBOX7
SCALE: NOT TO SCALE SCALE: NOT TO SCALE
06/06/2025
06/06/2025
HALL
LAVATORY
STORAGE ROOM
CONTROL ROOM
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
EXISTING TAINTER GATE
CONTROL PANEL
EXISTING HOIST
CONTROLLER
EXISTING JUNCTION BOX
LIMIT SWITCH BOX
LEFT HOIST UNIT
HOIST BRAKE
HOIST MOTOR
BACK OF PIER WALL
EXITING LEFT PIER WALL
TRY OUT PUSH BUTTON STATION
SITE PLAN NEW WORK
1. SEE SINGLE LINE DIAGRAM FOR EQUIPMENT RATINGS.
2. SEE WIRING DIAGRAMS FOR CONTROL DETAILS.
3. SEE CONDUIT SCHEDULE FOR CONDUIT DETAILS.
GENERAL NOTES
KEY NOTES NEW WORK
PROVIDE METER SOCKET FORM 16S IN EXISTING
ENCLOSURE. COORDINATE WITH SCE.
PROVIDE SERVICE RATED ENCLOSED CIRCUIT BREAKER
NEMA 1.
PROVIDE MTS NEMA 1.
PROVIDE GENERATOR QUICK CONNECT CAMLOCK BOX
NEMA 1.
PROVIDE PANEL NEMA 1.
PROVIDE DRY TYPE STEP DOWN TRANSFORMER NEMA 1.
REFURBISH CONTROL PANEL IN PLACE.
RECONNECT MOTOR, CONNECT EXISTING BRAKE IN
PLACE.
PROVIDE TAMPER RESISTENT COVER FOR EXISTING
JUNCTION BOX.
REFURBISH TRYOUT STATION, REORIENT 180°.
TO SCE XFMR1
P-1
P-2
P-5
P-4
P-7
C-1
P-8
C-4
P-8
C-3
C-2
ROOF OVERHANG
4' 12'0 8'2'1'
PLAN
NORTH
SITE PLAN NEW WORK1 SCALE: 1/4" = 1'-0"
PANEL A
PANEL B
3Ø
E5
E5.dwg
DOUBLE DOOR
P-3
GENERATOR ROOM
P-6
REMOVER AND
CAP EXISTING
SINLE PHASE
WEATHERHEAD.
ACOE CONTROL
P-12
S-1
06/06/2025
06/06/2025
GFCI
GFCI
GFCI
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
SITE PLAN NEW WORK RECEPTACLES
E6
E6.dwg
4' 12'0 8'2'1'
KEY NOTES NEW WORK
PROVIDE GFCI RECEPTACLE IN SURFACE MOUNTED
JUNCTION BOX.
PLAN
NORTH
SITE PLAN NEW WORK - RECEPTACLES1 SCALE: 1/4" = 1'-0"
GFCI
P-9
(TYP. OF 4)
ROOF OVERHANG
JJ
CORE DRILLING
REQUIRED
06/06/2025 06/06/2025
S
J
S
S
S
S
S
J
J
J
ROOF OVERHANG
S
J
J
S
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
LIGHTING PLAN NEW WORK
E7
E7.dwg
4' 12'0 8'2'1'
KEY NOTES NEW WORK
PROVIDE LIGHT FIXTURE IN EXISTING HOUSING.
PROVIDE J-BOX.
CORE DRILL THROUGH WALL ABOVE DOORWAY.
PLAN
NORTH
LIGHTING PLAN NEW WORK1
A c
A
SCALE: 1/4" = 1'-0"
GENERAL NOTES
e c C
P-10
P-11 a d b e g
1(TYP)
A a A e
A d
1. OUTDOOR CONDUIT SHALL BE RIGID STEEL.
2. INDOOR CONDUIT SHALL BE EMT.
3. CONTRACTOR MAY USE EXISTING RACEWAY, BUT
ALL CONDUCTORS MUST BE NEW.
a a
B f
B g
B b
1 3
1 3
1 3 f
CORE
DRILLING
REQUIRED
06/06/2025
06/06/2025
3.8 4.7 4.9 4.0
3.8 4.7 4.9 4.0
8.9
11.1
13.3
14.9
14.8
13.1
10.8
8.5
10.9
13.9
17.3
19.8
19.6
17.0
13.5
10.4
12.7
16.7
21.5
25.0
24.8
21.0
16.1
12.1
14.1
18.8
24.5
28.7
28.4
23.8
18.0
13.3
13.6
18.3
24.1
28.5
28.3
23.6
17.7
13.0
12.7
17.0
22.1
25.9
25.6
21.5
16.3
12.1
11.1
14.4
18.3
21.0
20.8
17.9
13.8
10.6
9.2
11.5
14.0
15.7
15.6
13.8
11.0
8.7
7.3
9.1
10.7
11.7
11.3
10.2
8.6
7.0
4.1 5.4 7.7 10.3 12.2 12.6 11.0 8.2 5.5 3.5 2.1
5.3 7.7 12.5 17.3 21.8 22.8 19.3 14.0 9.4 4.7 2.6
1.0 1.5 2.5 4.1 6.1 8.8 11.5 12.9 12.0 9.3 6.6 4.4 2.9 2.0 1.5 0.0 0.1
1.3 2.1 3.7 6.2 10.0 15.1 20.3 23.0 21.2 15.9 10.6 6.6 3.9 2.5 1.9 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.0 0.0 0.0
0.9 1.4 2.4 4.2 7.0 11.2 15.9 19.9 20.2 16.3 11.7 7.7 4.7 2.8 1.7 1.0 0.6 0.4 0.3 0.2 0.2 0.1 0.1 0.1
8.3
10.5
12.7
14.2
14.6
14.1
13.5
12.0
9.8
7.7
10.2
13.2
16.3
18.6
19.6
19.4
17.8
15.3
12.2
9.4
11.8
15.7
19.9
23.1
24.6
24.3
22.3
18.7
14.4
10.9
12.5
16.8
21.6
25.2
26.9
26.7
24.5
20.4
15.6
11.9
11.9
15.7
20.0
23.3
24.9
24.7
22.6
19.0
14.6
11.1
10.8
13.9
17.1
19.6
20.8
20.5
18.9
16.1
12.7
9.9
8.8
11.1
13.2
15.0
15.8
15.6
14.5
12.5
10.2
8.0
8.3 6.5 6.6 8.2 11.1
1.8 1.9 2.0 2.3 2.8 3.3 3.8 4.0 3.9 3.4 2.8 2.1 1.5 1.1 0.8 0.5
2.3 2.3 2.5 2.9 3.6 4.6 5.4 5.9 5.7 4.9 3.8 2.8 1.9 1.3 0.9 0.6
0.3 0.4 0.6 0.8 1.1 1.5 2.1 2.7 3.3 3.8 3.9 3.7 3.3 3.0 2.8 0.9 0.6
0.3 0.4 0.6 0.9 1.4 1.9 2.8 3.8 4.7 5.5 5.7 5.2 4.5 3.9 3.6 1.1 0.7
0.3 0.5 0.1 0.1
0.4 0.6 0.0 0.0
0.5 0.7 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0
0.3 0.5 0.0 0.0
0.3 0.4 0.0 0.0
16.1 17.5 16.1
19.2 20.9 19.3
19.8 21.4 19.8
17.2 18.7 17.2
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
PHOTOMETRICS PLAN NEW WORK
E8
E8.dwg
4' 12'0 8'2'1'
PLAN
NORTH
PHOTOMETRICS PLAN NEW WORK1 SCALE: 1/4" = 1'-0"
GENERAL NOTES
1. SEE E-7 FOR LIGHT FIXTURE SCHEDULE.
2. ALL FOOTCANDLES (FC) CALCULATED AT GROUND
LEVEL.
CONTROL ROOM
AVG MAX MIN
PHOTOMETRIC CALCULATIONS (FC)
LOCATION
16.1 28.7 7.0
STORAGE ROOM 18.6 21.4 16.1
LAVATORY 4.3 4.9 3.8
GENERATOR ROOM 16.1 26.9 7.7
EXTERIOR 5.4 23.0 0.0
HALL 8.1 11.1 6.5
PERIMETER 1.4 5.9 0.0
06/06/2025 06/06/2025
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
SINGLE LINE DIAGRAM NEW WORK
E9
E9.dwg
100AF
100AT
3P
M
TGC
• M
(LTG)
1.6kW
FM 16S, 200A
240, 3P, 4W
TAINTER GATE
CONTROL PANEL
TRYOUT
STATION
REVERSIBLE
MOTOR
CONTROLLER
GATE MOTOR
W/ BRAKE
SOLENOID
1. EQUIPMENT SIZES ARE AS INDICATED.
GENERAL NOTES
KEY NOTES NEW WORK
PROVIDE METER SOCKET IN EXISTING ENCLOSURE.
COORDINATE WITH SCE.
PROVIDE SERVICE RATED ENCLOSED CIRCUIT
BREAKER.
PROVIDE MTS.
PROVIDE GENERATOR QUICK CONNECT CAMLOCK BOX.
PROVIDE PANEL.
PROVIDE COVER FOR EXISTING PULL BOXES NOT IN
USE.
PROVIDE DRY TYPE STEP DOWN TRANSFORMER NEMA
1.
REFURBISH CONTROL PANEL IN PLACE.
RECONNECT REFURBISHED MOTOR AND REFURBISHED
BRAKE TO CONNECT REFURBISHED BRAKE IN PLACE.
3P 100A
3P 100A
4 SOCKET
A
15KVA
240-208Y/120V 3P 4W 3%Z
B
5 6
P-1
P-2 P-3
P-4
P-6
P-7
SINGLE LINE DIAGRAM 1 SCALE: NO SCALE
PANEL SCHEDULES2 SCALE: NO SCALE
PANEL
PANEL
P-5
P-8
SCE POLE
OPEN DELTA
N G
#2 BCU
#2 BCU
N G
S-1
06/06/2025
06/06/2025
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
CONDUIT SCHEDULE
E10
E10.dwg
06/06/2025 06/06/2025
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
12WIRING DIAGRAM
E11
E11.dwg
LINE 0001 LINE 0025
CB1
L1
L2
L3
M1 M2
CB 2
5A
CB 3
20A
M2
M3
M1
R
R
TR2
M3
M2 M3
TR2
M3
M
7.5 HP
240 VAC
3Ø
23.0FLA
OL
LIMIT SWITCH BOX
LOWER OVER
TRAVEL LIMIT
POWER SUPPLY 1
INPUT 240VAC 2A
OUTPUT 24VDC 20A
BACKOUT
SW LOWER
LIMIT SWITCH BOX
LOWER LIMIT
BACKOUT
SW CENTER
C
(REMOTE)
LOWER LOWER
.5 SEC
FLASH
MODE B2
L N G
T1
T2
T3
LOWER
OVER TRAVEL
RAISE OVER
TRAVEL LIMIT
BACKOUT
SW RAISE
LOWER
BACKOUT SW
LOWER
7 8 10 9
3 4
5 6
240VAC
50A, 3Ø FROM
PANEL 'A'
POWER
OFF ON
24 VDC
L R
L R
LOWER
BLINK
30A
L1
L2
L3
T1
T2
T3
L1
L2
L3
T1
T2
T3
L1 T1
L2 T2
L3 T3
CB3X Y
X
X
X
X 002
1 TB1
TB1
TB1
11 12
L R
A
A
LOWER LIMIT
(REMOTE)
LOWER LIMIT
FR LINE 0023
TB1
TB1
TB1
TB1
TB2
TB2
TB2
TB2
TB2
TR1
A
A
RAISE LIMIT
(REMOTE)
LIMIT SWITCH BOX
RAISE LIMIT
RAISE LIMIT
95 96
TB1
TB1
M2
M2
TR1
M3
BACKOUT
SW CENTER
C
RAISE
.5 SEC
FLASH
MODE B2
STOP
(REMOTE)
STOP RAISE
13 141 2
L R R
RAISE
BLINK
11 10 1
TB1
TB1
TB1
TB2
TB1
TB2
TB2
TB2
W
OL
R
MOTOR
OVERLOAD
97 98
TB2
TB1
TB1
TO LINE 0026
TB1
X
GAUGE
ILLUM.
Y
Y
Y
Y
TB2
X
X
X
X
X
X
3 3 4 5
Y
LINE 0022
FROM LINE 0013
TO LINE 0026
LINE 0037
FR LINE 0028
TB1
Y
X
TB2
TB1
TB2
TB1
LINE 0041
X
LINE 0031
BACKOUT
SW RAISE
C
BRAKE
L4
L5
L6
L7
L8
L10
L11
L12L9
L5
L6
L13
L14
L15
L16 GND
RAISE
OVER TRAVEL
TB2
TB1
BACKOUT SWITCH
Y
X
X 12 12
Y7
Y
7 7 6
23232221
22 23
212020
X 21
TB1
19W
POWER
X
7X
X
(REMOTE)
RAISE
1 2
TB1
BACKOUT
SW CENTER
C
TB1
2 2
D
2 2
D
LS2 LS4
1 1
1 2
LS1
3X
LS3
KEYNOTES
LOCATED IN TAINTER GATE CONTROL PANEL.
LOCATED IN HOIST CONTROLLER.
LOCATED IN LIMIT SWITCH BOX.
LOCATED IN REMOTE OPERATOR STATION.
67X
YX
#12
OL
06/06/2025
06/06/2025
BACKOUT
LOWER RAISE
RAISELOWER
LOWER
OVER TRAVEL LOWER LIMIT
RAISE
OVER TRAVELSTOP RAISE LIMIT
RAISE LOWER
GATE POSITION FEET
TAINTER GATE CONTROL
OFF ON
POWER
MOTOR
OVERLOAD
HOIST CONTROLLER
WESTINGHOUSE
DIAL LIGHT
TB1
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
PANEL LAYOUT
E12
E12.dwg
TAINTER GATE CONTROL PANEL - OUTSIDE
SCALE: NOT TO SCALE
HOIST CONTROLLER - OUTSIDE
SCALE: NOT TO SCALE
HOIST CONTROLLER - INSIDE
SCALE: NOT TO SCALE
11 11 8 10 11
6 11 6
KEYNOTES
PUNCH HOLES OUT AT 30mm WITH NOTCH AT 12:00
ADD 30mm HOLE CENTER ALIGNED WITH EXISTING HOLES
PATCH HOLES WITH STEEL AND PAINT TO MATCH.
TRIM EXISTING HOLE AS NEEDED TO FIT NEW SWITCH.
TAINTER GATE CONTROL PANEL - INSIDE
SCALE: NOT TO SCALE
1 1 1 1 1
1 2 1
3 3
A
A
STOP
RAISE
LOWER
REMOTE CONTROL STATION
SCALE: NOT TO SCALE
TB2 (TYP. OF 25)
COMPONENT LIST FOR CONTROL PANELS
06/06/2025 06/06/2025
TAINTER GATE
CONTROL PANEL
EXISTING 1-1/4" CONDUIT
EXISTING 1-1/2" CONDUIT
HOIST
CONTROLLER
PANEL A
EXISTING
JUNCTION
BOX
EXISTING 1-1/4" CONDUIT
EXISTING 1-1/4" CONDUIT
EXISTING 3/4" CONDUIT
MOTOR
B R A K E
LIMIT SWITCH BOX
REMOTE
STATION
RAISE
STOP
LOWER
A
A
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
ELECTRICAL BLOCK DIAGRAM
E13
E13.dwg
BLOCK DIAGRAM
SCALE: NOT TO SCALE
WIRE PULL LIST
C-1
C-2
P-7
P-8
P-9
C-4
C-3
06/06/2025 06/06/2025
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
ELECTRICAL DETAILS
E14
E14.dwg
KEYNOTES
8" THICK CONCRETE WALL (EXCEEDS
MIN. REQUIREMENTS).
OPTIONAL METALLIC SLEEVE.
THROUGH PENETRANTS (SEE SYSTEM
DESCRIPTION IN UL DIRECTORY).
RATED CAULKING.
ONLY NON-REBAR-CUTTING DRILL BITS
SHALL BE USED TO DRILL HOLE IN
EXISTING WALLS OR SLABS.
PENETRATION SHALL BE AT LEAST 12"
AWAY FROM JAMBS, CORNERS AND
OTHER PENETRATIONS. USE
STANDARD PIPE WEIGHT GALVANIZED
IRON OR STEEL, NO ALUMINUM.
5 6
RATED THRU-WALL PENETRATION (CONC. OR CMU WALL)
SCALE: NOT TO SCALE
SCE SERVICE DETAIL
SCALE: NOT TO SCALE
1 2
EXISTING SCE CONDUIT, NEW
SERVICE CONDUCTORS
EXISTING METER CABINET
CORE DRILL INTO BUILDING
PROVIDE NEW
SCE FORM 16S
METER SOCKET
P-1
FIXTURE PER FIXTURE
SCHEDULE
CEILING
CONDUIT
INTERIOR LIGHTING DETAIL
SCALE: NOT TO SCALE
6EXTERIOR LIGHTING DETAIL
SCALE: NOT TO SCALE
RESET
CONDUIT
SURFACE MOUNTED J-BOX
18" A.F.F
CONDUIT
SURFACE MOUNTED J-BOX
42" A.F.F
SURFACE MOUNTING DETAIL
SCALE: NOT TO SCALE
4SURFACE MOUNTED LIGHT SWITCH DETAIL
SCALE: NOT TO SCALE
M
BUILDING WALL CORE DRILL CONDUIT
THROUGH BUILDING
ABOVE DOORS
FIXTURE PER SCHEDULE
PROTECTIVE CAGE
DOOR FRAME
06/06/2025
06/06/2025
HALLWAY
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
PANEL B AND HOIST CONTROLLER
ELEVATION
E15
E15.dwg
120/240V PANEL AND HOIST CONTROLLER ELEVATION
SCALE: NOT TO SCALE
PANEL B
PANEL COVER
NEMA 1 13 GAUGE
ALUMINUM COVERING
MOUNTED TO EACH
CORNER ON EXISTING
FRAME
4"X4" WIREWAY
P-8
C-1
P-7
HOIST CONTROL
PANEL
P-11P-9P-10
P-6
E-5
EAST EXTERIOR WALL WEST EXTERIOR WALL
06/06/2025 06/06/2025
MTS
GUTTER
EXISTING STUBUPS
METER BOX ON
BACKSIDE
PANEL A
ENCLOSED
CIRCUIT
BREAKER
1" CONDUIT
GROUNDING
HALLWAY
1" CONDUIT
GROUNDING
NEW GROUND ROD
EXISTING GROUND
CA
LL
BEFORE YOU
DI G
UNDERGROUND SERVICE ALERT
Call: TOLL FREE
1-800-227-2600
OR
TWO WORKING DAYS BEFORE YOU DIG
PHASE 1 SCOPING DWG NO.
FILE NO.
SHEET OF
PROFESSIONAL ENGINEER R.E.E. No.
PREPARED UNDER THE SUPERVISION OF:
DATE
COMPANY ADDRESS AND LOGO
REVISIONS
DATEAPPR.DESCRIPTIONINITIALDATEMARK
SAN BERNARDINO COUNTY - FLOOD CONTROL DISTRICT
PLANS APPROVED BY:
APPROVALS
INITIAL DATE
ASSISTANT DIRECTOR DATE
DEPUTY DIRECTOR
ENGINEERING MANAGER
LYTLE CREEK GATEHOUSE
TAINTER GATE CONTROLS
POWER SYSTEM REPAIR
GENERATOR ROOM ELEVATION
E16
E16.dwg
GENERATOR ROOM ELEVATION
SCALE: NOT TO SCALE
P-1
P-3
P-2
P-4
P-5
P-7
E-5
WEST EXTERIOR WALL EAST EXTERIOR WALL
3'
2'
06/06/2025 06/06/2025
| Sheets and Views |
| E0 COVER SHEET |
| E1 TITLE SHEET |
| E2 SITE PLAN DEMOLITION |
| E3 SINGLE LINE DIAGRAM DEMOLITION |
| E4 ELECTRICAL DEMOLITION DETAILS |
| E5 SITE PLAN NEW WORK |
| E6 SITE PLAN NEW WORK RECEPTACLES |
| E7 LIGHTING PLAN NEW WORK |
| E8 PHOTOMETRICS PLAN NEW WORK |
| E9 SINGLE LINE DIAGRAM NEW WORK |
| E10 CONDUIT SCHEDULE |
| E11 WIRING DIAGRAM |
| E12 PANEL LAYOUT |
| E13 ELECTRICAL BLOCK DIAGRAM |
| E14 ELECTRICAL DETAILS |
| E15 PANEL B AND HOIST CONTROLLER ELEVATION |
| E16 GENERATOR ROOM ELEVATION |
File details come from the government source that posted it. Updated .