This document is a Scope of Work (SOW) for a specialized commercial cleaning services contract issued by the Greater Orlando Aviation Authority for Orlando International Airport. The contract encompasses three primary service sections: high-rise glass/wall/canopy cleaning (Sections A and C) and roadway bridge/structure pressure washing (Section B). The contract term is sixty (60) months, with an anticipated service commencement date of October 1, 2025. The contractor will be responsible for providing all labor, supervision, chemicals, materials, water trucks, and equipment (including aerial lift equipment) necessary to perform comprehensive cleaning services across various airport surfaces and structures, including windows, skylights, canopies, bridge abutments, knee-walls, piers, and toll structures.

The contract will compensate the contractor based on unit prices specified in the bid forms (pages BF-10 through BF-28), with monthly invoicing required by the tenth day of each month following service performance. The contractor must use environmentally-friendly, certified cleaning products meeting specific green standards, and all employees must have specialized safety training, including International Window Cleaning Association certification. The contractor will be required to maintain strict safety protocols, use appropriate protective equipment, work during specified hours (mostly nighttime and early morning), and coordinate closely with airport operations to minimize disruption. The contract includes provisions for quality assurance inspections, potential area additions or removals, and specific requirements for equipment, uniforms, and personnel qualifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This Contract will be to furnish all labor, supervision, chemicals, materials, water trucks, equipment (including aerial lift equipment) and all other items necessary or proper for, or incidental to, performing interior/exterior window, interior/exterior skylights, interior/exterior canopy and specialty surface cleaning services as well as all accessories necessary to effectively perform pressure washing services to remove all gum, oil, stickers, soil, algae, grease deposits and other foreign substances from roadway bridge abutments, knee-walls, piers, and ticket and toll structures at the Orlando International Airport in accordance with the Contract Documents. All work shall be performed in accordance with the Specification attached hereto.

COMPENSATION - INVOICE AND PAYMENT FOR SERVICES: 2.1 The Authority shall pay the Contractor, subject to the applicable Prices set forth in the Contract on Pages BF-10 through Page BF-28 for each area described on such pages, each time High Rise Glass/Wall/Canopy Services or Pressure Washing Services are performed by Contractor in conformity with Contract requirements for such area and to Authority’s reasonable satisfaction per the Specifications.

2.2 The Contractor shall invoice the Authority by the tenth day of each month following a month in which approved services are performed by Contractor during such prior month. The Contractor’s invoice shall generally describe the service rendered by work area and location, type of service, date rendered, unit price, and shall contain such other information and be accompanied by such supporting documents and materials as the Authority shall request.

2.3 The Contractor will submit separate invoices for work including any additional work done under Section “A”, Section “B” and for Section “C” of this Contract per the requirements as specified herein.

2.4 The Authority shall, at regular intervals, monitor the performance of Contractor to determine whether the work to be performed under the Contract has in fact been accomplished to Authority’s satisfaction and/or completed in a timely manner.

2.5 The Authority shall notify the Contractor of any specific services that are unsatisfactory to the Authority, and if the Contractor has not addressed such item or items set forth in the notice to the Authority’s satisfaction within ten (10) calendar days after Authority’s notice, the Authority in addition to all other rights provided under this Contract or by law or equity, may either remedy such unsatisfactory services itself or through a third party and the cost of providing the remedial services shall be deducted from the Contractor’s invoice.

2.6 The Authority shall pay the undisputed amount of Contractor’s (hereinafter includes “Consultant”) invoice, as it may be reduced to reflect unsubstantiated or unsatisfactory services. Items in dispute shall be paid upon the resolution of the dispute. No verification or payment of any amounts invoiced shall preclude the Authority from later recovering any money paid in excess of that due under the terms of this Contract.

2.7 Contractor shall be obligated to pay promptly all proper charges and costs incurred by Contractor for labor and materials used for the work performed hereunder. The Authority shall have the right, but not the obligation, to pay directly to third parties (including subcontractors) all past due amounts owed by Contractor to third parties for labor and materials used for the work hereunder, based on invoices submitted by such third party, and all such amounts paid by the Authority shall be applied toward, and shall reduce, amounts owed to Contractor hereunder.

2.8 The Contractor shall submit all invoices to: Greater Orlando Aviation Authority, Finance Manager, P.O. Box 620125, Orlando, Florida 32862-0125.

3. COMPLIANCE WITH LAWS AND REGULATIONS:

3.1 The Contractor shall perform its obligations and functions hereunder in compliance with the applicable laws of the United States, the State of Florida, Orange County, the City of Orlando, any applicable rules, regulations or directives of any agency thereof, and the applicable regulations of the Authority. OSHA rules and regulations shall be followed at all times. The Authority shall have the right (but not the obligation) to contest or challenge by any means whatsoever any law, regulation, rule or directive which in any way affects or otherwise impacts upon the Contractor's performance of its obligations and functions hereunder; the Contractor shall cooperate to the fullest extent and take whatever action (including becoming a party in any litigation) the Authority should reasonably request in connection with any such challenge or contest by the Authority.

4. CONTRACTOR'S LIABILITY: The Contractor shall be responsible for the prompt payment of any fines imposed on Authority or Contractor by the Transportation Security Administration (“TSA”) or any other federal, state or local governmental agency as a result of Contractor's, or its subcontractor's (or the officers’, directors’, employees’ or agents’ of either), failure to comply with the requirements of any law or any governmental agency rule, regulation, order or permit. The liability of the Contractor under this Section 4 is in addition to and in no way a limitation upon any other liabilities and responsibilities which may be imposed by applicable law or by the indemnification provisions of Section 5 hereof, and such liability shall survive the expiration or earlier termination of this Contract. review with risk. No section 4 or 5, this is from old boilerplate.

7. CONTRACT ADJUSTMENTS:

7.1 Notwithstanding any provision herein to the contrary, the Authority reserves the right to modify at any time the nature, method, scope, frequency, or timing of the Contractor's obligations under this Contract (Contract Adjustments) in whatever manner it determines to be reasonably necessary for the proper completion of the Contractor’s work hereunder. Both parties agree that, should any Contract Adjustments be made, the Contractor's compensation and the amount of the Performance Bond or Letter of Credit required, will be adjusted accordingly, in such amount or amounts as will be mutually agreed to by means of good faith negotiation by the Authority and the Contractor and, to the extent possible, by reference to any unit costs already established in the Bid. Without exception, all deletions or additions to the scope of work will be set forth in a written Amendment to this Contract.

7.2 Notwithstanding the foregoing, the Authority shall have the right to terminate this Contract pursuant to the provisions of Section 9.2 herein should the Contractor and the Authority fail to reach agreement on the adjusted compensation, or the amount of the Performance Bond or Letter of Credit, within thirty (30) days after the date of the Contract Adjustment.

7.3 Notwithstanding the foregoing, there shall be no upward adjustment of the compensation on account of any Contract Adjustment made necessary or appropriate as a result of the mismanagement, improper act, or other failure of the Contractor, its employees, agents, or its subcontractors to properly perform its obligations and functions under this Contract.

8. SUBCONTRACTORS:

8.1 The Contractor shall perform all of its obligations and functions under this Contract by means of its own employees, or by a duly qualified subcontractor which is approved in advance by Authority. Such subcontractor which is an affiliate, parent, or subsidiary company; or had principal owners, relatives, close kin, management, or employees common to the Contractor; or any other party that has the ability to significantly influence the management or daily business operations of the subcontractor must be disclosed in writing to the Chief Executive Officer. Goods and services provided by subcontractors which are reimbursed by the Authority must be bona fide arm’s-lengths transactions. In the event a subcontractor is employed, the Contractor shall continuously monitor the subcontractor's performance, shall remain fully responsible to ensure that the subcontractor performs as required and itself perform or remedy any obligations or functions which the subcontractor fails to perform properly. Nothing contained herein shall be construed to prevent a Contractor from using the services of a common carrier for delivering goods to the Authority.

8.2 This Contract shall be referred to and incorporated within any contractual arrangement between the Contractor and a subcontractor and, in such contractual arrangement, the subcontractor shall give its express written consent to the provisions of this Section 8. To the extent feasible, the provisions of this Contract shall apply to any such subcontractor in the same manner as they apply to the Contractor. However, such application shall neither make any subcontractor a party to this Contract, nor make such subcontractor a third-party beneficiary hereof.

8.3 In the event that the Contractor employs a subcontractor, then Authority may require that copies of invoices for all work (including invoices submitted to the Contractor for work performed by a subcontractor) shall be submitted to the Authority by the Contractor and the Authority shall pay all compensation to the Contractor. It shall be the sole responsibility of the Contractor to deal with a subcontractor with respect to the collecting and submission of invoices and the payment of compensation. In no event shall the Authority have any obligation or liability hereunder to any subcontractor, including, in particular, any obligations of payment.

SPECIFICATION

PART ONE - GENERAL

1.1 SCOPE OF WORK: The specialty cleaning services performed under this contract have been separated into three sections. Sections “A” and “C” involve high rise glass/wall and canopy cleaning. Section “B” involves roadway bridge, abutment, knee-walls, piers, and ticket and toll structures. The specifications for each section have been outlined in the following pages.

1.1.1 Section “A” High Rise Glass/Wall/Canopy Cleaning

1.1.1.1 The Contractor shall provide all labor, supervision, materials, equipment (including aerial lift equipment) and all other items necessary or proper for, or incidental to, performing interior/exterior window, interior/exterior skylights, interior/exterior canopy and specialty surface cleaning services at the Orlando International Airport (“OIA”) in accordance with this Specification and Attachment “A” Terminology for Glass Cleaning Specifications (which attachment is incorporated in and made a part of this Specification).

1.1.1.2 The areas in which Contractor shall perform the high-rise glass, wall and canopy cleaning services are more particularly detailed in Sheets “1” through “17” (which Sheets are attached to this Specification and are incorporated in and made a part of this Specification).

1.1.2 Section “B” Roadway Bridge Abutment, Kneewall, Pier and Toll Structures

1.1.2.1 The Contractor shall provide all labor, supervision, chemicals, materials, water trucks, equipment (including aerial lift equipment) and accessories necessary to effectively remove all gum, oil, stickers, soil, algae, grease deposits and other foreign substances from roadway bridge abutments, knee-walls, piers, and ticket and toll structures at Orlando International Airport. The work shall be performed in accordance with this Specification.

1.1.2.2 The areas in which Contractor shall perform roadway bridge abutments, knee-wall, pier and toll structures pressure washing are more particularly detailed in Sheet 1 (which sheets are attached to this Specification and are incorporated in and made apart this Specification).

1.1.3 Section “C” South Terminal Complex

1.1.3.1 The Contractor shall provide all labor, supervision, materials, equipment (including aerial lift equipment) and all other items necessary or proper for, or incidental to, performing interior/exterior window, interior/exterior skylights, interior/exterior canopy and specialty surface cleaning services at the South Terminal Complex (“STC”) which includes the South APM/ITF/PDL and future Terminal “C” in accordance with this Specification and Attachment “A” Terminology for Glass Cleaning Specifications (which attachment is incorporated in and made a part of this Specification).

1.1.3.2 The areas in which Contractor shall perform the high-rise glass, wall and canopy cleaning services in the South Terminal Complex are more particularly detailed in Sheets “1” through “7” (which Sheets are attached to this Specification and are incorporated in and made a part of this Specification).

1.1.4 The individual areas to be cleaned under Section “A”, Section “B” and Section “C” of this Contract, as well as the frequencies for cleaning, can be found on pages BF-10 through BF-27 of the Bid Forms. These areas are also identified on the Attachment “A” maps, and Attachment “B” maps and Attachment “C” maps.

1.1.5 The Authority reserves the right to add and remove areas as described in Section 1.1. of this Specification due to construction activity or if services are to be performed by Authority personnel.

1.2 REGULATIONS:

1.2.1 The Contractor shall comply with all applicable federal, state and local laws, ordinances, rules and regulations pertaining to the performance of the work specified herein.

1.2.2 The Contractor shall obtain all permits, licenses and certificates, or any such approvals of plans or specifications as may be required by Federal, State and local laws, ordinances, rules and regulations, for the proper execution of the work specified herein.

1.2.3 Contractor shall comply with Federal and State right-to-know laws if hazardous materials are used. The SDS (Safety Data Sheets) shall be made available to all workers and Authority's representatives. Contractor shall report immediately to the Authority’s Authorized Representative (“AAR”) any spillage or dumping of hazardous materials on Authority property. The Contractor shall also be responsible for the cleanup and any costs incurred for all such incidents.

1.2.4 During the performance of this Contract, Contractor shall keep current and, if requested by the Authority, provide copies of any and all licenses, registrations or permits required by applicable governing agencies. Contractor shall keep a copy of any and all licenses, registrations and permits on the job site while performing the Contract work.

1.3 WORK HOURS:

1.3.1 For work to be completed under Sections “A” and “C” of this solicitation, Contractor shall perform work Monday through Friday, between 7:00 a.m. and 5:00 p.m. except for interior and exterior canopies, and interior skylights which shall be cleaned Sunday through Friday, between 10:00 p.m. and 6:00 a.m., excluding Authority’s observed holidays. Contractor shall perform no work during Authority observed holidays without the prior written approval of the AAR.

1.3.2 For work to be completed under Section “B” of this solicitation, Contractor shall perform work between the hours of 10:00 PM and 6:00 AM (Standard Working Hours), Sunday through Thursday. The actions necessary to set up the MOT (i.e. FDOT (Florida Department of Transportation) Section 102 Maintenance of Traffic and applicable Design Standards for a particular work location may begin one (1) hour prior to and conclude one (1) hour after the area has been completed per Specification. If work cannot be performed during Standard Working Hours, alternate working hours will need prior approval by the AAR.

1.3.3 In the event an emergency condition is declared by the Authority’s Chief Executive Officer, Director of Maintenance or their respective designees, the Contractor will perform work during such hours as specified by the Authority.

1.3.4 The Contractor shall respond verbally by telephone to a written request by the AAR within twenty-four (24) hours of receiving the request and shall commence services within forty-eight (48) hours from the time AAR’s written request is received by the Contractor.

1.3.5 Contractor shall check in when arriving at work site and check out prior to departure from work site by signing the Contractor logs located at the Authority Central Plant (West end of Level 1A at the terminal).

1.4 CONTRACTOR’S PERSONNEL:

1.4.3 Should the Contractor engage employees who are illiterate in English, it will be the Contractor's responsibility and obligation to train such employees to be able to identify and understand all signs and notices in and/or around the areas that relate to them or the services being performed by them pursuant to this Contract. In addition, the Contractor will have someone in attendance at all times who can communicate instructions to said employee.

1.4.4 Contractor shall maintain a drug-free workplace within the meaning of the Florida Drug-free Workplace Act. No employee shall be hired by a Contractor for work on Authority's premises prior to such employee having tested negative for drugs. In addition, existing employees of the Contractor must be subject to drug testing by the Contractor upon reasonable suspicion of drug use. Results of all such drug tests are to be retained by the Contractor. Copies shall be provided to the Authority, if requested.

1.4.5 Contractor shall transfer promptly from the airport any employee or employees that the Authority advises are not satisfactory and replace such personnel with employees satisfactory to the Authority; but in no event shall Authority be responsible for monitoring or assessing the suitability of any employee or agent of Contractor.

1.4.6 The Contractor’s employees shall be instructed that no gratuities shall be solicited or accepted for any reason whatsoever from the tenants, customers or other persons at Orlando International Airport. The Contractor shall be responsible for ensuring that all articles found by its employees on Authority's premises are turned over to the Authority or the Authority's designated agent in charge of such articles.

1.4.7 A valid Florida driver license (Commercial Driver License, if applicable) will be required of all personnel operating motor vehicles or motorized equipment on roadways in or around Orlando International Airport. Each of the Contractor's motor vehicles brought onto the Authority's premises shall have the Contractor's business name and/or logo prominently displayed on both front doors of such vehicle.

1.4.8 While working on airport property all Contractor's employees shall wear neat appearing uniforms with the company name and/or logo and footwear of a style that complies with all legal and safety requirements, including and without limitation, the requirements of OSHA.

1.4.9 Contractor must obtain written approval from the AAR at least seven days prior to the utilization of all subcontractors under this Contract. The Authority has the right to refuse the use of a Subcontractor under this Contract.

1.4.10 Prior to the performance of any work under this Contract, the Bidder must submit certificates verifying that all employees assigned to work at the Authority performing High Rise Glass/Wall/Canopy Cleaning services have attended an International Safety Training seminar conducted by the International Window Cleaning Association (IWCA) or similar/equivalent entity that provides similar/equivalent instruction/training and obtained certificate of completion by the same. Employees will also be trained and certified in operating aerial lift equipment. Such certification will be in accordance with applicable OSHA regulations (29 CFR 1910.67, 1910.269; 1926.453, 1926.454, 1926.502, and 1926.503).

1.5 1.6 ITEMS PROVIDED BY THE AUTHORITY: The Authority will provide the Contractor with:

1.6.1 Staging area for setting up special equipment on each site work.

1.6.2 Authority will provide the Contractor, at the Authority's sole cost and expense with all utility services (water, electrical) generally available at location and required by the Contractor to perform its obligations and functions under the Contract.

1.6.3 The Authority will provide access to the Motor Pool facility for water supply to replenish Contractor’s truck containers that will perform pressure washing at those locations that have no water source.

1.6.4 The Authority will provide the Contractor with parking for the Contractor’s employees, solely for the performance by such employees of the work specified herein.

1.6.5 Authority will provide the Contractor, at the Authority's sole cost and expense, with reasonable amount of storage space (no more than 10’ X 10’) for the storage by the Contractor of its supplies and the equipment required to perform the work and functions under the Contract in such locations in the Terminal Complex, as the Authority shall determine. All such space is provided to Contractor in "as is" condition. At the termination of the Contract, all such space shall be returned to Authority in the same condition as when received, reasonable wear and tear excluded. The Contractor shall bear all risk of loss, damage or theft of any supplies and equipment stored in such space.

1.7 WARRANTY:

Not Applicable.

1.8 ON-SITE COMMUNICATIONS:

1.8.1 The Authority will provide Contractor with a minimum of three (3) Authority owned radios to be used by the Site Manager, Supervisors and employees.

1.8.2 The Contractor is responsible for the replacement cost of lost or damaged radios.

1.8.3 Contractor shall exercise reasonable care in the operation and use of the radios. The Authority will repair or replace any defective radios at Authority's expense, however, the Contractor will be obligated to pay for the repair or replacement of any radios damaged, destroyed or lost by Contractor or its employees, agents or subcontractors.

1.8.4 Upon termination of the Contract, Contractor shall return the radios to the Authority in the same condition as when received, reasonable wear and tear excepted.

1.9 QUALITY ASSURANCE:

1.9.1 The Contractor's organizational structure shall include a designated Contract Manager, an On-Site Supervisor, and sufficient number of high-rise glass, wall, and canopy cleaning employees to perform the services as noted in Section “A” and “C” of this solicitation.

1.9.2 Contractor must have in place an employee training program, inspection information and procedures for the proper use of high rise cleaning equipment for all work being performed as part of Section “A” and “C” of this solicitation.

1.9.3 The Contractor shall provide an adequate number of licensed/skilled workmen who are thoroughly trained and experienced in the pressure washing work as noted in Section “B” of this solicitation.

1.10 CONTRACTOR’S SUPERVISORY PERSONNEL:

1.10.1 Contractor's supervisory personnel shall be furnished with a uniform different from non-supervisory personnel. 1.10.2 The Contractor shall employ and designate a qualified Contract Manager authorized to represent and act for the Contractor in matters pertaining to Contractor’s operations and activities and otherwise carry out the provisions of this Contract.

1.10.3 The Contractor shall employ and designate qualified on-site Supervisors to be present at all times when work is being done on Authority property.

1.10.4 Contractor's designated Supervisors working with services under Sections “A” and “C” of this Contract shall have experience in managing high rise glass, wall, and canopy cleaning services and operations. Such person must have knowledge and experience with high rise glass, wall, and canopy cleaning methods and coordinating multiple tasks. Such person must also be capable of interpreting the requirements and cleanliness standards set forth herein and possess the monitoring, communication, and comprehension skills needed to effectively manage the work to be performed under this Specification.

1.10.5 Contractor's designated Supervisors working with services under Section “B” of this Contract shall have experience in managing the pressure washing work and operations under a contract comparable in size and scope to the work to be performed under this Contract. Such person must have knowledge and experience with the pressure washing of surfaces of equal or similar construction and a proven track record of coordinating multiple tasks. Such person must also be capable of interpreting the requirements and cleanliness standards set forth herein and possess the monitoring, communication, and comprehension skills needed to effectively manage the work to be performed under this Specification.

1.10.6 Contractor’s designated Supervisors working with services under Sections “A” and “C” of this Contract shall have attended (and obtained certification from) an International Safety Training seminar conducted by the International Window Cleaning Association (IWCA) or similar/equivalent entity that provides similar/equivalent instruction/training and obtained certificate of completion by the same.

1.10.7 Due to the importance of management in the performance of the service requested hereunder, the Contractor shall advise the Authority in writing of the name and qualifications of its intended Contract Manager and On-Site Supervisors within ten (10) days of receipt of Notice of Intent to award to the Contractor (and thereafter with respect to any substitute or replacement Contract Supervisor). The Authority shall have the right, in its sole discretion, to approve or reject any supervisory personnel selected by Contractor. During the term of the Contract, Contractor shall promptly transfer from the Airport any supervisory employee if Authority advises in writing that such employee is objectionable to Authority for any reason.

1.10.8 The Contract Manager for this Contract shall:

· be a full-time employee of the Contractor; and

· have overall responsibility for the work to be performed under the Contract.

1.10.9 The Supervisors for this Contract shall:

· be on-site during the times when any work is being performed and devote adequate time to effectively manage Contractor's operations at the airport; and

· be capable of supervising employees effectively and be vested with authority to respond to any concerns raised by the Authority, and

· be responsible for enforcing discipline and good order among Contractor’s employees under their supervision and ensuring that their work is performed in a high-quality manner.

1.10.10 The Supervisors shall routinely inspect all areas and when requested by the Authority the areas covered hereunder to ensure that the designated work satisfies the requirements of the Contract.

1.10.11 Contractor's on-site Manager must be capable of supervising employees effectively and be vested with authority to respond to any concerns raised by the Authority.

1.10.12 Contractor's on-site Supervisors shall be responsible for enforcing discipline and good order among contractor's employees under their supervision and ensuring that their work is performed in a high-quality manner.

1.10.13 The Contract Manager and Supervisors shall attend meetings scheduled by Authority to review Contractor's compliance with Authority's procedures and when follow-up action, if any, is required to correct identified deficiencies in Contractor's performance.

1.11 KEYS:

1.11.1 Prior to the commencement of the Contract work, the Authority will issue to the Contractor the Terminal Complex keys needed to access the areas where Contractor will be required to perform the Contract work.

1.11.2 Contractor shall be responsible for security of keys at all times.

1.11.3 The Contractor shall not permit any individual to access or have keys which will permit access to sensitive or restricted areas, until the Authority determines that access by such individual to such sensitive or restricted areas will not be contrary to Authority's interests. In making such determination, the Authority must be satisfied that the appropriate background checks have been completed with respect to such individual, and that there is no other information, instruction, rule or regulation which would reasonably prohibit access to a sensitive or restricted areas by such individual.

1.11.4 Contractor shall promptly report any lost or missing keys to Authority and shall be responsible for the cost to install a new lock or, if appropriate, replace the keys.

1.11.5 Contractor shall return all Terminal Complex keys in its possession to the Authority upon the expiration or earlier termination of the Contract.

1.12 THE AUTHORITY’S BUILDING SERVICES STAFF:

1.12.1 The Authority maintains a Building Services Staff whose duties include monitoring and inspecting the performance of the Contractor for the purpose of bringing any deficiencies in such performance to the AAR's and Contractor's attention.

1.12.2 The Building Services Staff is not authorized to revoke, alter, or waive any requirements of the Contract. No statements made by members of the Building Services Staff shall be construed as binding the Authority or releasing the Contractor from any of the requirements of the Contract.

1.12.3 The AAR may authorize the suspension of some or all of the work until the questions at issue can be resolved to the satisfaction of the Authority.

1.13 UNIFORMS:

1.13.1 The Contractor shall furnish each of its employees with appropriate uniforms on which Contractor’s name shall be prominent identified and footwear of a style that complies with all legal and safety requirements, including and without limitation, the requirements of OSHA. All of the Contractor’s employees shall wear their uniforms at all times while on duty. The uniforms shall be clean and fresh daily, fit properly and be in good repair. The uniforms must meet OSHA visibility requirements for reflective clothing.

1.13.2 Contractor’s supervisory personnel shall be furnished with a uniform different from non-supervisory personnel.

1.13.3 Any of the Contractor employee(s) (supervisory or non-supervisory) working under this Contract and not wearing a uniform which complies with the provisions of this Section shall immediately be suspended from further duties hereunder until such time as the employee returns wearing the proper uniform.

1.14 TOOLS AND EQUIPMENT:

1.14.1 The Contractor at its own expense, shall provide all necessary equipment, including any aerial and lifting equipment, to perform all the activities required in this Specification. The Contractor will provide a ReachMaster Denka Series Model DL92N high-lift or approved equivalent.

1.14.2 All tools and equipment shall be available at the time the Contract begins. All tools and equipment shall be at a minimum "mechanical or motorized" and "state of the art" to ensure that the highest productivity, safety and efficiency are achieved.

1.14.3 Contractor's equipment including any aerial equipment shall be kept clean and in good operating condition at all times.

1.14.4 The Contractor shall remove from the Airport equipment not in compliance, as determined by the AAR.

1.14.5 Contractors equipment shall comply with the requirements and standards specified in Federal, State and Local codes where applicable.

1.14.6 Each piece of Contractor's equipment must be individually numbered and include the Contractor's logo.

1.14.7 The Contractor shall conduct daily inspections of its equipment prior to being used to ensure the equipment is in good operating and safe condition and shall remove from the Airport equipment not in compliance with these requirements.

1.14.8 Any employee who will be required to operate a vehicle or piece of equipment during the performance of the work shall be properly trained and licensed at Contractor's expense to operate such vehicle or piece of equipment.

1.14.9 All powered equipment must have the following features:

· safeguards, such as rollers or rubber bumpers, to avoid damage to building surfaces;

· ergonomic design to minimize vibration, noise, and user fatigue, as reported in the user manual in accordance with ISO 5349-1 for arm vibrations, ISO 2631–1 for vibration to the whole body, and ISO 11201 for sound pressure at operator’s ear.

· as applicable, environmentally preferable batteries (e.g., gel, absorbent glass mat, lithium-ion) except in applications requiring deep discharge and heavy loads where performance or battery life is reduced by the use of sealed batteries.

· Powered floor maintenance equipment must be equipped with items, such as, vacuums, guards, or other devices for capturing fine particulates and must operate with a maximum sound level of 70 dBA, in accordance with ISO 11201.

· Automated scrubbing machines must be equipped with variable-speed feed pumps and either (1) on-board chemical metering to optimize the use of cleaning fluids or (2) dilution control systems for chemical refilling. Alternatively, scrubbing machines may use tap water only, with no added cleaning products.

1.15 MOTORIZED EQUIPMENT WORKING AROUND AIRCRAFT:

1.15.1 The majority of work to be performed in Section “A and “C”, the exterior high-rise glass, wall, and canopy cleaning services, specified herein will require working around aircraft/airline operations. The Contractor shall use extreme caution when cleaning exterior surfaces around any of the Airside concourses or when operating any mechanical and/or motorized lift/platform equipment so as not to come in contact with or damage any aircraft, passenger loading bridge or other support equipment. The Contractor shall coordinate the work and movement of equipment in and around the Airside concourses with the Airline operating from the area which Contractor is preparing to clean. Aircraft shall be given the right of way at all times.

1.15.2 Contractor shall use extreme caution when working around operational aircraft engines and use the necessary safety and health precautions to minimize exposure to aircraft engine noise, jet blast and other hazards.

PART TWO - PRODUCTS

2.1 SUPPLIES AND MATERIALS:

2.1.1 The Contractor shall provide and maintain at the Airport an adequate quantity of all necessary cleaning supplies, other materials and equipment as may be required in order to fully and timely perform the obligations under this Specification. The Authority shall approve all chemicals to be utilized under this Contract prior to the use of such chemicals.

2.1.2 Cleaning products must meet one or more of the following standards:

· Green Seal GS-37, for general-purpose, bathroom, glass and carpet cleaners used for industrial and institutional purposes;

· UL 2792 (formerly CCD 110), for cleaning and degreasing compounds; UL 2759 (formerly CCD 146), for hard-surface cleaners;

· UL 2795 (formerly CCD 148), for carpet and upholstery care;

· Green Seal GS-40, for industrial and institutional floor care products;

· UL 2777 (formerly CCD 147) , for hard-floor care;

· EPA Design for the Environment Program’s Standard for Safer Cleaning Products; and/or Cleaning devices that use only ionized water or electrolyzed water and have third-party-verified performance data equivalent to the other standards mentioned above (if the device is marketed for antimicrobial cleaning, performance data must demonstrate antimicrobial performance comparable to EPA Office of Pollution Prevention and Toxics and Design for the Environment requirements, as appropriate for use patterns and marketing claims);

2.2 CLEANING PRODUCTS REQUIRED FOR SECTION “A”: The Contractor shall be responsible for providing and maintaining all cleaning supplies and materials necessary to perform the high rise glass, wall, and canopy cleaning services. The Contractor shall provide the following minimum types of chemicals and materials to be used in performing the required cleaning.

2.2.1 Glass Cleaners- Primarily for use on windows, mirrors, and other glass surfaces, to spot clean and wash glass and certain other synthetic surfaces where slight spotting or streaking would be detrimental to the appearance of the area. The cleaner should be a concentrate, which is mixed with water before using.

2.2.2 Metal cleaners and polish to be used for cleaning window shades, moldings, framing and louvers.

2.2.3 Stain removers.

2.2.4 Canopy cleaners shall be Murphy’s Oil Soap diluted in water at a ratio of 23% by volume (except canopy supporting structures which shall be cleaned with water only). Mixing guidelines using the above ratio are as follows:

· 33 oz. Per gallon

· 165 oz. Per 5 gallons

· 800 oz. Per 24 gallons

· 3300 oz. Per 100 gallons

2.2.5 Contractor shall not use products containing ammonia, chlorine, bleach, or powdered cleansers without obtaining the prior written permission from Authority. Refer to Section 2.1.2 of this Specification for chemical requirements.

2.2.6 Submission of SDS (Safety Data Sheets) to the AAR is required prior to use, for chemical agents, additives and approved biodegradable chemicals used in the performance of the cleaning work.

2.3 CLEANING PRODUCTS FOR SECTION “B”

2.3.1 The Contractor shall be responsible for providing all cleaning supplies and materials necessary to perform the pressure washing work, which may include:

2.3.1.1 Submission of SDS (Safety Data Sheets) to the AAR is required prior to use, for chemical agents, additives and approved biodegradable chemicals used in the performance of the cleaning work.

2.3.1.2 Cleaners, which are primarily defined as degreasing agents for use on walls and ceilings to remove dirt, oil, tar exhaust residue, spider webs, egg sacs, mud dauber nests and any other deposits or film, which may be present. The cleaner should be a concentrate, which is mixed with water before using.

2.3.1.3 Chemical cleaners that are used on surfaces in areas of plants and grass shall not be harmful to vegetation. Care shall be taken to avoid any damage to plants, shrubs and trees. The Contractor shall mix all chemical and cleaning products in strict accordance with manufacturer’s recommendations.

2.3.1.4 The use of stain removers will be subject to approval by the AAR. Any new or existing stains which are persistent shall be brought to the attention of the AAR.

2.3.1.5 All cleaning shall be uniform and not leave patterns. All surfaces shall be rinsed clean.

2.3.2 All cleaning products and chemicals used in performing the pressure washing cleaning services under this Contract shall meet the industry's minimum standards and shall conform to and be used in strict compliance with all Federal, State and Local environmental and safety laws and regulations.

2.3.2.1 All approved cleaning chemicals must have original labels on the containers. The Contractor shall also maintain on site:

2.3.2.1.1 A product brochure which contains the instructions for use.

2.3.2.1.2 A copy of OSHA Form 174 Material Safety Data Sheet, or equivalent, and a label for all chemicals used in the performance of the work. A copy of OSHA form 174 shall be provided to the Authority prior to work being performed on this Contract.

2.3.2.1.3 For each chemical used in performing the pressure washing services, Contractor shall maintain on file, a copy of the chemical specifications, which contain safety warnings and safety instructions.

2.4 CLEANING PRODUCT SAFETY:

2.4.1 All cleaning products and chemicals used in performing the high rise glass, wall, and canopy cleaning services under this Contract shall possess a certification through Ecology, Green Seal or similar program that is recognized by the United States Green Building Council.

2.4.2 All cleaning products and chemicals used in performing the high rise glass, wall, and canopy cleaning services under this Contract shall conform to and be used in strict compliance with all Federal, State and local environmental and safety laws and regulations.

2.4.3 All cleaning chemicals must have original labels on the containers. Contractor shall also maintain on site a copy of OSHA Form 174, Safety Data Sheet, and a label for all chemicals used in the performance of the work. A copy of OSHA Form 174 shall be provided to Authority.

2.4.4 Contractor shall maintain on file, a copy of the chemical specifications for each chemical used in performing the high rise glass, wall, and canopy cleaning services. The chemical specifications shall contain safety warnings and safety instructions.

PART THREE - EXECUTION 3.1 PERFORMANCE REQUIREMENTS:

3.1.1 Contractor shall perform all of its obligations and functions under the Contract in accordance with Contract specifications, industry standards and manufacturers’ specifications. The Contractor shall adjust and coordinate its activities to the needs and requirements of the Authority and perform its activities so as not to annoy, disturb, endanger, unreasonably interfere with or delay the operations or activities of the Authority.

3.1.2 Contractor’s personnel shall perform Work in a neat and professional manner, and in compliance with all Federal, State, and City of Orlando regulations and ANSI specs. OSHA rules and regulations shall be followed at all times.

3.1.3 Contractor shall attend a reasonable number of coordination meetings before and during the term of the Contract. The Contractor shall interface with the AAR or designee(s) as needed to exchange information regarding work, which the Contractor intends to perform or the condition of work that was performed.

3.1.4 Any work required beyond that which is specified herein shall be reported in advance to the AAR. At no time shall work beyond the scope be performed without prior written authorization from the AAR.

3.1.5 Contractor shall utilize maximum safety precautions. Tools and equipment will be in a good state of repair, safe to use, and be used in the manner in which they were intended. Contractor is required to inform all workers and concerned persons of the Safety Data Sheets on all products being utilized on this project. No materials or equipment will be left unattended or stored on the project site at any time.

3.1.7 The AAR or designee will be available for the day to day interface with the Contractor’s Manager and/or Supervisor.

3.1.8 The AAR shall have initial responsibility for answering questions which may arise as to the quality of work performed, the manner of performance, the rate of progress of the work, and the acceptability of chemicals, supplies, tools and equipment utilized by the Contractor. The AAR will be responsible for contacting other Authority Departments if needed.

3.1.9 The Contractor shall provide each employee engaged in the performance of work under this Contract with the training needed to safely and competently perform the work hereunder.

3.1.10 For work to be performed under Sections “A” and “C” of this Contract, at a minimum, each employee shall receive training in the following areas prior to beginning work on Authority property or when new procedures, methods, equipment or chemicals have been introduced:

3.1.10.1 General Orientation on areas of Contractor’s responsibility.

3.1.10.2 Introductions to Contractor’s areas of assignments.

3.1.10.3 Cleaning chemicals-usage and safety precautions.

3.1.10.4 Tools and equipment operations and general safety.

3.1.10.5 Safety issues and compliance with OSHA Act of 1970.

3.1.10.6 Safety while working with equipment and heights.

3.1.11 The Contractor shall perform all obligations and functions in accordance with this Specification and in adherence to well established industry standards so that the areas to be serviced under the Contract will be maintained in a clean and neat condition and satisfactory to Authority.

3.1.12 For work to be performed under Section “B” of this Contract: Roadway Bridge Abutment, Kneewall, Pier and Toll Structures Pressure Washing:

3.1.12.1 The Contractor shall at all times employ adequate numbers of properly trained personnel.

3.1.12.2 The Contractor shall (upon AAR request), power-wash all concrete surfaces. After power washing, all surfaces shall be free from adhered and impregnated soil.

3.1.12.3 The Contractor shall (upon AAR request), remove all loose and adhered soil from signs, bridges, bridge kneewalls, piers, abutment surfaces, and toll structures. After cleaning, all surfaces and structures shall be free of dust, dirt, and discoloration.

3.1.12.4 Vegetation or plant life that could be harmed by the pressure washing should be covered for protection and the cover removed after the cleaning in that area is complete. After pressure washing, all area surfaces shall be free from dirt, discoloration, foreign matter, film, etc.

3.1.12.5 Contractor shall control the dwell time and working distance on the soiled areas so as to accomplish the cleaning without harming the integrity of the surface being cleaned.

3.1.12.6 Contractor shall use care when cleaning around any light fixtures. All excess water shall be removed from the housing and lens surfaces upon completion of each area. Light fixtures shall be dusted and cleansed to remove all loose, adhered and impregnated soil.

3.1.12.7 When cleaning a vertical surface, the surface should be free from all foreign substances, including but not limited to streaks, drips, mildew, fingerprints or any other loose or adhered soil.

3.1.12.8 Stainless steel, aluminum and other metal surfaces including support structures and beams shall be washed to remove all loose, adhered and impregnated soil.

3.1.12.9 The Contractor is responsible for covering and protecting any vehicles which may be damaged as a result of pressure washing in the adjacent areas. All covering will be removed by the Contractor after the completion of the pressure washing. The Contractor shall be responsible for any damage to vehicles caused by overspray from pressure washing.

3.2 INCLEMENT WEATHER AND ELECTRICAL STORMS:

3.2.1 Extreme caution will be used during all electrical storms. Contractor shall be cognizant of the times throughout the year when electrical storms or inclement weather is likely to occur.

3.2.2 Contractor shall suspend exterior activities exposed to adverse weather elements or during electrical storms that are within close proximity of the Airport.

3.3 AIRPORT ACTIVITY:

3.3.1 Contractor shall become familiarized with the peak traffic periods and make appropriate work schedule adjustments as necessary to avoid interfering with any airport or passenger terminal activity.

3.3.2 The AAR has the right, from time to time, to instruct the Contractor to relocate cleaning operations if, in the reasonable opinion of the AAR, the work of the Contractor is interfering with Airport activity. The Contractor shall resume operations when conditions permit.

3.4 CLEANING SPECIFICATIONS SECTIONS “A” AND “C”:

3.4.1 The following are Authority's specifications for cleaning of high rise glass, wall, and canopies and other surfaces to be performed under this Contract. These specifications reflect recommendations of specialty consultants, and when available the maintenance specifications recommended by the manufacturers of the various materials to be cleaned.

3.4.2 Windows/Skylights and other Surfaces. The Contractor shall perform the following functions:

3.4.2.1 Dust, wash, and clean windows to remove all loose and adhered soil impregnated matter from the entire surface area (including, but not limited to, all sills, sunshades, louvers, muntons, mullions, connecting pipes, related supporting structures and light fixtures).

3.4.2.2 All windows and skylights should be thoroughly wet down and agitated, and all moisture removed with a squeegee. Moisture must also be removed from all sills, sunshades, louvers, muntons, and mullions, connecting pipers, related supporting structures and light fixtures. Pressure washing may not be used to clean skylights.

3.4.2.3 Light fixtures, stainless steel, aluminum and other metal surfaces (including support structures and beams) shall be dusted and cleaned to remove all dirt and adhered and/or impregnated matters.

3.4.2.4 Specialty Vertical Surfaces: Wash and clean entire areas. Remove all dust, dirt, gum, smudges, fingerprints, adhered and impregnated matter. Dry and remove all streaks from surface ledges adjoining windows, window frames/sills. The surfaces shall have clean, uniformed appearance, be free of streaks, spots, and other evidence of removable soil.

3.4.3 Canopy Areas and Supporting Structures. The Contractor shall perform the following:

3.4.3.1 Supporting Structures shall be cleaned with the canopies; provided, however that the supporting structures shall only be cleaned with clean water and a pressure washer.

3.4.3.2 Large areas can be cleaned more efficiently using equipment that applies the soap solution directly. Two methods of application can be used: 1) a car wash brush on the end of a wand that applies the soap/hot water solution under pressure, and 2) a pressure washer that applies the soap solution, loosening the dirt, while a second worker rinses the area with water, using a hose.

3.4.3.3 When using the soft car wash-type brush, Contractor shall ensure that the soap solution is prepared properly so that the final mixture has the appropriate ratio of .33 oz. soap per U.S. gallon of water.

3.4.3.4 When using the pressure washer with a soap mixture, Contractor shall ensure that the final mixture ratio is .33 oz. per U.S. gallon of water. The nozzle used shall have a flat, fan-like spray, and the nozzle shall never be held closer than two feet from the surface. Any closer than this can damage the fabric and the coating. If the spray pressure hitting the fabric is painful to your hand (test it to see), reduce the pressure and back farther away from the membrane.

3.4.3.5 After any cleaning effort using the soap solution, Contractor shall thoroughly rinse all soap off the membrane using clean water.

3.4.3.6 The use of a pressure washer to clean the fabric presents a high risk of membrane damage if operated carelessly or improperly. Pressure washer streams using excess pressure can quickly abrade the PVC coating or even cut the membrane. If the soil resists the pressure washer, use a car wash-type brush to agitate the soil and loosen it.

3.4.3.7 Contractor is responsible for replacing any canopies which are damaged by use of wrong equipment, wrong cleaning materials, by using the pressure washer too close to the canopies,…