This document is an Explanation of Contract Line Item Numbers (CLINs) for a Sugarcane Greenhouse Construction project at the USDA Agricultural Research Service site in Houma, Louisiana. The file details five CLIN items: a Base CLIN for Greenhouse A (including construction, roadway, corridor, and site preparation) and four optional CLINs covering additional greenhouse expansions and infrastructure improvements. Each CLIN includes specific construction elements such as pile-driving, concrete mat installation, grading, seeding, and regulatory permitting. Notably, the Greenhouse Controls System for each CLIN is to be priced separately. The options include a first and second addition to the main greenhouse, an Entomology Greenhouse, and a new road, gate, and control system extension to Bull Run Road. The construction project involves multiple phases of greenhouse expansion and supporting infrastructure, with each CLIN representing a distinct scope of work that can be individually priced and potentially executed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sugarcane Greenhouse Construction

Explanation of CLIN Items - Page 1

EXPLANATION OF CLIN ITEMS

GENERAL: This section comprises an explanation of the CLIN items identified in the pricing schedule. This section is a general scope of work for the CLIN items described in the pricing schedule and is not intended to be all encompassing in the descriptions. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. Some drawings and specifications are identified below to reference general locations and detail information for various CLIN items, however other drawings, details and specifications also apply. The Contractor shall price each type of work under the applicable CLIN item. CLIN pricing are lump sum and all- inclusive of that part of the work. Payment described for the various CLIN items will be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the Pricing schedule shall be included in the payment for the item of work to which it is made subsidiary.

BASE CLIN

CLIN Item No.1: Base CLIN, Greenhouse A

Payment under CLIN Item No.1 “Greenhouse A” includes all construction work associated with Greenhouse A, the Connecting Corridor with physical connection to the existing Headhouse, the new asphalt roadway and firetruck turnaround south of the Greenhouse, and all applicable regulatory permitting and survey work and fees required. Also included is all rough grading for the entire construction site, pile-driving (for the main greenhouse and Connecting Corridor) and the concrete mat on top of the piles. Finish grading and seeding for the Greenhouse A and Connecting Corridor is included, as well as the contractor staging area and trailer(s). Included is the maintenance gantry and transfer trolley.

The cost for the Greenhouse Controls System for the Base CLIN is to be identified separately.

OPTIONS

CLIN Item No.2: Option 1A, First Addition to Greenhouse A

Payment under CLIN Item No.2 “Addition to Greenhouse A” includes all construction work associated with the first Addition to the Main Greenhouse, and all applicable regulatory permitting and survey work and fees required. Included is all grading for needed for Option 1A, pile-driving, and the concrete mat on top of the piles. Also included is all finish grading and seeding around the addition.

The cost for the Greenhouse Controls System for Option 1A is to be

CLIN Item No.3: Option 1B, Second Addition to Greenhouse A

Payment under CLIN Item No.3 “Addition to Main Greenhouse” includes all construction work associated with the second Addition to the Main Greenhouse, and all applicable regulatory permitting and survey work and fees required. Included is all grading for needed for Option 1B, pile-driving, and the concrete mat on top of the piles. Also included is all finish grading and seeding around the addition.

The cost for the Greenhouse Controls System for Option 1B is to be

CLIN Item No.4: Option 2, Entomology Greenhouse

Payment under CLIN Item No.4 “Entomology Greenhouse” includes all construction work associated with the Entomology Greenhouse, connecting it to the Connecting Corridor, and all applicable regulatory permitting and survey work and fees required. Included is pile-driving, and the concrete mat on top of the piles. Finish grading, seeding and landscaping for the Entomology Greenhouse is included.

The cost for the Greenhouse Controls System for the Entomology Greenhouse is to be identified separately.

CLIN Item No. 5: Option 3, New Road, Gate and Controls

Payment under CLIN Item No.5 “New Road, Gate and Controls” includes all construction work associated with the asphalt road extension from the south-west corner of Greenhouse A to Bull Run Road, and all applicable regulatory permitting and survey work and fees required. Run underground conduit for power and controls for the new gate. Include final grading and seeding adjacent to the road. At Bull Run Road, modify the existing fence to install a new motorized sliding gate and a card reader.

BASE CLIN
OPTIONS