Existing_Flow_Monitoring_Equipment_Inventory_and_Existing_Monitoring_Location_Map.pdf
PDF 492 KB Posted
- Solicitation number
- 26-040
- Issued by
- Charles County, Maryland
About this file
This document is an inventory and equipment map prepared by Charles County, Maryland for RFP 26-040, which solicits proposals for Flow Monitoring Services for the Sanitary Sewer System. The County operates a comprehensive monitoring network within the Mattawoman Sewer Service Area that currently consists of 19 installed Triton+ flow meters distributed across various monitoring wells and pump stations, 5 installed Rain Alert III rain gauges positioned at key facilities including the Matt WWTP and three pump stations, and 3 spare Triton+ flow meters and 1 spare Rain Alert III rain gauge held in reserve. The selected contractor will be responsible for the operation, maintenance, data management, and reporting of this entire monitoring network, including routine inspections, equipment maintenance, data collection and analysis to support inflow and infiltration investigations, and wastewater infrastructure planning. The contractor may also be tasked with installing or relocating monitoring equipment as needed and supporting the County's broader wastewater system planning efforts through technical analysis and reporting.
The document does not specify pricing terms, contract duration, response deadlines, or other procurement details in the inventory file itself. However, the contract is intended to facilitate the County's long-term wastewater infrastructure planning and system evaluation by ensuring reliable data collection from the existing monitoring network. The County has indicated it may utilize the contract for expansion of the monitoring network and additional technical support services beyond routine maintenance during the contract term, suggesting flexibility in scope and potential growth in deliverables based on the County's evolving needs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 26-040, Charles County Flow Monitoring Services for the Sanitary Sewer System
EXISTING FLOW MONITORING EQUIPMENT INVENTORY
A. Installed Flow Meters (19 Total)
Site ID Meter Type Manhole /
Structure ID
Status
MW03R Triton+ 50620 Installed
MW05 Triton+ 50679 Installed
MW07 Triton+ 53599 Installed
MW09 Triton+ 57497 Installed
MW14-A Triton+ 58371 Installed
MW15 Triton+ 56754 Installed
MW17 Triton+ 50354 Installed
MW19 Triton+ 52717 Installed
MW19-A Triton+ 50308 Installed
MW37 Triton+ 51814 Installed
MW44 Triton+ 58054 Installed
MW44-A Triton+ 58102 Installed
MW48 Triton+ 55616 Installed
MW49 Triton+ 55967 Installed
MW49-A Triton+ 57763 Installed
PS16A Triton+ 461012 Installed
PS20-A Triton+ 51948 Installed
BA01-A Triton+ 54283 Installed
BA02 Triton+ 59194 Installed
B. Installed Rain Gauges (5 Total)
Site ID Rain Gauge Type Location
Description
Status
RG01 Rain Alert III Bldg. 5 Matt
WWTP
Installed
RG02 Rain Alert III North Pointe Pump
Station
Installed
RG03 Rain Alert III Dorchester Pump
Station
Installed
RG04 Rain Alert III Zekiah Pump
Station
Installed
RG05 Rain Alert III Potomac Heights
SWM Pond
Installed
C. County-Owned Spare Equipment (Not Currently Installed)
Equipment Type Quantity Status
Triton+ Flow Meter 3 Spare
Rain Alert III Rain
Gauge
1 Spare
MAPS
EXISTING MONITORING LOCATION MAP