Existing_Flow_Monitoring_Equipment_Inventory_and_Existing_Monitoring_Location_Map.pdf

PDF 492 KB Posted

Attached to
Charles County Flow Monitoring Services for the Sanitary Sewer System
Solicitation number
26-040
Issued by
Charles County, Maryland

About this file

This document is an inventory and equipment map prepared by Charles County, Maryland for RFP 26-040, which solicits proposals for Flow Monitoring Services for the Sanitary Sewer System. The County operates a comprehensive monitoring network within the Mattawoman Sewer Service Area that currently consists of 19 installed Triton+ flow meters distributed across various monitoring wells and pump stations, 5 installed Rain Alert III rain gauges positioned at key facilities including the Matt WWTP and three pump stations, and 3 spare Triton+ flow meters and 1 spare Rain Alert III rain gauge held in reserve. The selected contractor will be responsible for the operation, maintenance, data management, and reporting of this entire monitoring network, including routine inspections, equipment maintenance, data collection and analysis to support inflow and infiltration investigations, and wastewater infrastructure planning. The contractor may also be tasked with installing or relocating monitoring equipment as needed and supporting the County's broader wastewater system planning efforts through technical analysis and reporting.

The document does not specify pricing terms, contract duration, response deadlines, or other procurement details in the inventory file itself. However, the contract is intended to facilitate the County's long-term wastewater infrastructure planning and system evaluation by ensuring reliable data collection from the existing monitoring network. The County has indicated it may utilize the contract for expansion of the monitoring network and additional technical support services beyond routine maintenance during the contract term, suggesting flexibility in scope and potential growth in deliverables based on the County's evolving needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 26-040, Charles County Flow Monitoring Services for the Sanitary Sewer System

EXISTING FLOW MONITORING EQUIPMENT INVENTORY

A. Installed Flow Meters (19 Total)

Site ID Meter Type Manhole /

Structure ID

Status

MW03R Triton+ 50620 Installed

MW05 Triton+ 50679 Installed

MW07 Triton+ 53599 Installed

MW09 Triton+ 57497 Installed

MW14-A Triton+ 58371 Installed

MW15 Triton+ 56754 Installed

MW17 Triton+ 50354 Installed

MW19 Triton+ 52717 Installed

MW19-A Triton+ 50308 Installed

MW37 Triton+ 51814 Installed

MW44 Triton+ 58054 Installed

MW44-A Triton+ 58102 Installed

MW48 Triton+ 55616 Installed

MW49 Triton+ 55967 Installed

MW49-A Triton+ 57763 Installed

PS16A Triton+ 461012 Installed

PS20-A Triton+ 51948 Installed

BA01-A Triton+ 54283 Installed

BA02 Triton+ 59194 Installed

B. Installed Rain Gauges (5 Total)

Site ID Rain Gauge Type Location

Description

Status

RG01 Rain Alert III Bldg. 5 Matt

WWTP

Installed

RG02 Rain Alert III North Pointe Pump

Station

Installed

RG03 Rain Alert III Dorchester Pump

Station

Installed

RG04 Rain Alert III Zekiah Pump

Station

Installed

RG05 Rain Alert III Potomac Heights

SWM Pond

Installed

C. County-Owned Spare Equipment (Not Currently Installed)

Equipment Type Quantity Status

Triton+ Flow Meter 3 Spare

Rain Alert III Rain

Gauge

1 Spare

MAPS

EXISTING MONITORING LOCATION MAP