This file is a technical specification document for the Hicpochee 138KV Davit Arms project issued by Glades Electric Cooperative, Inc. (GEC) in Florida. The document provides structural dimensions for existing davit arm installations on 138kV transmission poles located in Glades and Hendry counties. The project involves the removal of approximately 110 existing davit arms, insulators, and bird discouragers from 85-foot spun concrete poles and the installation of approximately 110 new davit arms, insulators, and bird discouragers according to GEC specifications. All work must be performed using barehand or hot-stick methods while maintaining energized line continuity. The contractor must adhere to GEC's standard work schedule of Monday through Thursday, 6:30 a.m. to 5:00 p.m. The question submission deadline is April 16, 2026, at 5:00 p.m., with proposals due April 30, 2026. The intent to award is anticipated in mid-May 2026, with an estimated project start date of August 31, 2026.

The technical specification table presents transmission pole configurations with varying pole lengths ranging from 75 to 90 feet, corresponding setting depths, ground clearances, and dimensional measurements (labeled as A, B, C, and H values). These specifications establish the baseline parameters for davit arm structure dimensions on the existing 138kV system. GEC will evaluate proposals using a 100-point scoring rubric comprising Qualifications of the Firm and Staff (40 points), Relevant Past Performance (30 points), and Cost Proposal (30 points). The procurement will award a Firm Fixed Price agreement to the selected contractor based on a lump sum bid with hourly time and equipment rates for potential scope additions. No set-asides are designated for this procurement. GEC reserves the right to reject any or all proposals and award to other than the lowest-priced offeror. No subcontracting is permitted, and all work materials are to be supplied by GEC unless otherwise approved. The specific contract award value or budget range has not been disclosed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FLA.-35-GLADES

MONi'URA 138 KV TRANSNmSSION

POLE

LENGTH

L

SETTING

DEPTH

D

GROUND

CLEARANCE

A1

C! C A B 0

' A + B

H-C

75 11.5 24.2 38.2 43.4 49.4 55.4 62.5 148.2

80 t 2 28.7 42.7 4 7. 9 53.9 59.9 670 IG1.-7

85 12.5 33.2 47.2 52.4 58.4 64.4 71.5 175,2

90 1 3 3 7. 7 51.7 56.9 62.9 68.9 76.0 188.7