Exhibits 3 and 4 127EAX21R0023.pdf

PDF 5 MB Posted

Attached to
Construction: Nogales RD Security System Modernization Federal contract opportunity
Solicitation number
127EAX21R0023
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

View the file

Other files for this federal contract opportunity

Other files attached to Construction: Nogales RD Security System Modernization, newest first.
File Type Posted
127EAX21R0023 Amendment 0002r 7-16-21.pdf PDF
127EAX21R0023 Amendment 0001r.pdf PDF
Exhibit 5 Building Floorplan.pdf PDF
12837121R0023 NRD Security System Modernization 7-14-21.pdf PDF
12837121R0023 NRD Security System Modernization.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Front Entry Main View

Front Entry View B-B

Brick Ceiling Run View

Front Entry View A-A

Brick Ceiling Run View

Brick Ceiling Run and Brick Wall

Front Desk Counter

Map Counter. To be Removed

Front Desk

New Wall to tie into Brick Wall.

Map Counter and Desk

Front Desk

AC Enclosure Gate Location

Gate To be Removed and Replaced

AC Enclosure Fence Panel Location

Extended V-Track Location

Nogales Warehouse

Pedestrian Emergency Gate Location

Exterior Lightbulb to be Replaced

SPECIFICATIONS

FOR

NOGALES RANGER DISTRICT OFFICE

SECURITY SYSTEM MODERNIZATION

February 26, 2021 ii iii

TABLE OF CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS

01010 - SCOPE OF WORK

1.1 – Definitions

1.2 – Description

1.3 – Location and Conditions

1.4 – Schedule

1.5 – Contract Administration

1.6 – Quality of Work

1.7 – Codes and Standards

1.8 – Special Construction Requirements

1.9 – Contract Closeout

01020 – MEASUREMENT & PAYMENT

1.1 – Measurement & Payment

01030 - MOBILIZATION

1.1 - Summary

01050 – SUBMITTALS

1.1 - General

2.1 - Description

2.2 - Products

DIVISION 2 – SITE WORK

02010 – DEMOLITION

1.1 – Description

2.1 – Not Used

3.1 - Preparation

3.2 – Protection

3.4 – Removal

DIVISION 3 – CONCRETE

03000 – PORTLAND CEMENT CONCRETE

1.1 - Summary iv

1.2 – References

1.3 – Submittals For Review

1.4 – Quality Assurance

1.5 – Environmental Requirements

2.1 – Form Materials

2.2 – Concrete Materials

2.3 – Accessories

2.4 – Concrete Mix

3.1 – Examination

3.2 – Preparation

3.3 – Forming

3.4 – Placing Concrete

3.5 – Joints

3.6 – Finishing

3.7 – Tolerances

3.8 – Field Quality Control

3.9 – Protection

03010 –CONCRETE FORMWORK

1.1 - Summary

1.2 – References

1.3 – Design Requirements

1.4 – Quality Assurance

1.5 – Qualifications

1.6 – Regulatory Requirements

1.7 – Delivery, Storage, And Handling

1.8 – Coordination

PART 2 – PRODUCTS

2.1 – Wood Form Materials

2.2 – Prefabricated Forms

2.3 – Formwork Accessories

3.1 – Examination

3.2 – Erection Formwork v

3.3 – Form Release Agent Application

3.4 – Inserts, Embedded Parts And Openings

3.5 – Form Cleaning

3.6 – Formwork Tolerances

3.7 – Field Quality Control

3.8 – Form Removal

03020 –CONCRETE REINFORCEMENT

1.1 - Summary

1.2 – References

1.3 – Submittals

1.4 – Quality Assurance

1.5 – Coordination

2.1 – Reinforcement

2.2 – Accessory Materials

2.3 – Fabrication

3.1 – Placement

03030 – CAST-IN-PLACE CONCRETE

1.1 - Summary

1.2 – Quality Assurance

1.3 – Submittals For Review

2.1 –Materials

2.2 – Mixes

3.1 – Subgrade Preparation

3.2 – Preparation For Concrete Placement

3.3 – Formwork

3.4 – Reinforcement

3.5 – Accessory Materials

3.6 – Joints

3.7 – Placing Concrete

3.8 – Hot Weather Requirements

3.9 – Cold Weather Requirements

3.10 – Removal of Forms vi

3.11 – Finishing

3.12 – Cement Mortar

3.13 – Curing

3.14 – Defective Materials And Concrete

3.15 – Protection Of Completed Work

3.16 – Cleaning

DIVISION 10 – SPECIALTIES

10000 – INTRUSION DETECTION SYSTEM

1.1 – Summary

1.2 – General

1.3 – Submittals

1.4 – Quality Assurance

1.5 – Delivery, Storage, and Handling

2.1 - Components

3.1 – Installation

10010 – PHYSICAL ACCESS CONTROL SYSTEM

1.1 – Summary

1.2 – General

1.3 – Submittals

1.4 – Quality Assurance

1.5 – Delivery, Storage, and Handling

2.1 - Components

3.1 – Installation

10020 – REPLACEMENT LIGHTBULB

1.1 – Summary

1.2 – General

1.3 – Submittals

1.4 – Quality Assurance

1.5 – Delivery, Storage, and Handling

2.1 - Lightbulb

3.1 – Installation

DIVISION 13 – SPECIAL CONSTRUCTION

vii

13000 – PHYSICAL SECURITY BARRIER

1.1 – Summary

1.2 – General

1.3 – Submittals

1.4 – Quality Assurance

1.5 – Delivery, Storage, and Handling

2.1 - Materials

3.1 – Installation

13010 – METAL GATE

1.1 – Summary

1.2 – General

1.3 – Submittals

1.4 – Quality Assurance

1.5 – Delivery, Storage, and Handling

2.1 - Materials

3.1 – Installation

DIVISION 1 – GENERAL REQUIREMENTS

01010 - SCOPE OF WORK

PART 1 – GENERAL

1.1 – Definitions

Contractor – the successful bidder who is awarded the contract.

Government – the Contracting Officer (CO) or designated Contracting Officer’s Representative (COR) of the Coronado National Forest.

1.2 – Description

Contractor shall furnish all materials, equipment, transportation, labor, supervision, and other associated work necessary to complete work according to the specifications.

A Physical Security Assessment was conducted at the Nogales Ranger District Office Complex in April 2018. The assessment identified both deficiencies and recommendations of several security upgrades at the site. Some of the security findings and recommendations were: insufficient exterior lighting, outdated Intrusion Detection System (IDS), employee access control, front lobby configuration, security of critical areas, security of critical equipment, no Video Surveillance System (VSS), no duress alarm, no secondary pedestrian emergency egress at the rear of the compound and a new vehicle gate to replace the current damaged vehicle gate.

Scope of work includes:

• Remove and Replace Exterior Lighting.

• Supply and Install new IDS to include VSS.

• Supply and Install Physical Access Control System

• Supply and Install Physical Security Barrier.

• Supply and Install fence and gate at AC enclosure.

• Supply and Install new security door for Law Enforcement evidence room.

• Re-key Safe room.

• Supply and Install duress alarm at front lobby.

• Supply and Install a pedestrian emergency gate.

• Remove and Replace the damaged gate with a new one and extend V-Track.

1.3 – Location and Conditions

Work will take place at the Nogales Ranger District Office Complex which is located in the town of Nogales and is within the Nogales Ranger District of the Coronado National Forest in Santa Cruz County, Arizona. The physical address is 303 Old Tucson Rd., Nogales, Arizona 85621.

It will be the Contractor’s responsibility to familiarize themselves with the existing conditions and notify the Government of any discrepancies shown in these documents.

For delivery of materials and other construction-related items, the Contractor shall coordinate with Contracting Officers Representative (COR) and is advised to determine safe vehicle lengths and load limits for roads that access the site.

1.4 – Schedule

A pre-work meeting for clarification of the project will be held if needed or desired by either the contractor or the Government

A schedule for all work must be submitted to and approved by the Government prior to construction beginning.

The Contractor shall notify the Forest Service three (3) days in advance of any survey work and seven (7) days in advance of any construction work.

All work shall be completed within 120 days of award.

1.5 – Contract Administration

The Contractor shall be fully responsible for seeing that construction activities conform to the specifications and provisions of this contract. The Government will provide timely reviews as requested by the Contractor and may periodically review work at any time.

Construction quality control shall include supplying all the personnel, equipment, and documentation necessary to ensure that construction is completed in compliance with the specifications and provisions of the contract.

The Contractor shall clearly stake limits of construction and maintain marks throughout construction. The Government will review all staking.

1.6 – Quality of Work

The products listed in the specifications are preferred products chosen for building compatibility and quality. However, equal or better alternatives submitted by the Contractor will be considered and are encouraged.

Use recovered materials, recyclable materials, and environmentally preferable products and services where possible as per Executive Order 13423.

1.7 – Codes and Standards

Codes and standards of the following associations and listed publications will become part of this contract:

1. International Building Code (IBC)

2. American Concrete Institute (ACI)

3. National Electrical Code (NEC)

4. International Mechanical Code (IMC)

5. International Fire Code (IFC)

6. Americans with Disability Act Standards (ADA) for Accessible Design

7. Occupational Health and Safety Administration (OSHA) Standards

8. American Society for Testing and Materials (ASTM)

9. American National Standards Institute (ANSI)

10. Standardized Specifications for Paints and Coatings (SSPC)

11. International Organization for Standardization (ISO)

12. National Sanitary Foundation (NSF)

All materials, workmanship, and designs shall meet specified requirements of the standards referenced in this section and other local or state codes, related to this type of work, whichever is more stringent.

If a particular item is not covered by a standard, it shall be proven by certified test by a reputable laboratory to be capable of performing satisfactorily, at no additional cost to the Government.

1.8 – Special Construction Requirements

Upon completion of the project, all demolished improvements and other construction materials shall be removed from Government land and disposed of in accordance with State and County standards.

All site features to remain shall be protected from damage during the project. Any damage to site features shall be repaired to their original condition at the cost of the Contractor.

Construction Access and Protection: The Contractor shall be responsible for securing the project area from the public and government personnel. This includes providing the necessary security for protection of the Contractor's materials, equipment, tools and work until final acceptance by the Government. The Contractor shall also provide sufficient signs, barriers, barricades, markers, etc. to warn of hazardous conditions and to protect people from injury.

Equipment and Material Storage: The Contractor shall obtain permission from the Government for equipment and material storage, and for other areas needed for construction.

Utilities: Electricity and water are available on site.

1.9 – Contract Closeout

Remove temporary facilities and provide final cleaning and touch-up. Restore portions of buildings, site improvements, landscaping, and other items damaged by construction operations to the satisfaction of the Government at no additional expense to the Government.

*** END OF SPECIFICATION 01010 ***

01020 – MEASUREMENT & PAYMENT

1.1 – Measurement & Payment

Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to the completion of the items shown and no separate payment will be made.

*** END OF SPECIFICATION 01020 ***

01030 - MOBILIZATION

1.1 - Summary

Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.

***END OF SPECIFICATION 01030***

01050 – SUBMITTALS

PART 1 – REQUIREMENTS

1.1 - General

It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow 5 days for processing of submittals by the Government. Submittals may also be referred to as shop drawings.

PART 2 – MANUFACTURER’S LITERATURE AND SHOP DRAWINGS

2.1 - Description

The Contractor shall submit one copy of all submittals to the Government for approval on the items required herein. For each submittal, the Contractor must receive written approval from the Government to use the item before incorporating it into the project work. Literature must be marked or otherwise designated to show the exact model, size, etc. the Contractor proposes to use. Information must be adequate to determine compliance with the specifications. Approvals must be received for products differing from those described in the Government-supplied specifications.

2.2 - Products

Certificates of compliance are required for the following:

1. Concrete

2. Rebar

3. Steel: Square Tubing for gate

4. Tandem wheel assembly

5. HSPD12, FIPS 201 Compliant Multi-Technology Card Readers

6. Polycarbonate Security Glass, LP 750 Level I Compliant

7. Non-Secure Framing

8. Wood Door and Frame Level I, U.L. 752 Standards Compliant

9. Intrusion Detection System (IDS) components: keypads, cameras, sensors, siren, duress alarm

10. Exterior lighting replacement bulbs

***END OF SPECIFICATION 01050***

***END OF DIVISION 1***

DIVISION 2 – SITE WORK

02010 – DEMOLITION

1.1 – Description

The work of this section consists of removal of existing square steel tubing gate.

PART 2 – PRODUCTS

2.1 – Not Used

PART 3 – EXECUTION

3.1 - Preparation

Coordinate removal work with the Government.

3.2 – Protection

Protect existing structures and features not required to be removed by construction from damage or displacement.

3.4 – Removal

A. All facilities and materials scheduled for demolition must be completely removed off Government lands and disposed of legally by the Contractor.

B. Gate to be removed: Constructed from square steel tubing. Dimensions the same as new proposed gate.

***END OF SPECIFICATION 02010***

*** END DIVISION 2 ***

DIVISION 3 – CONCRETE

03000 – PORTLAND CEMENT CONCRETE

1.1 - Summary

Section Includes: The work of this section consists of the concrete to be used in the installation of the extension the new 22 feet of V-Track. The concrete strength shall be of 3,000 psi.

1.2 – References

A. ACI 304 – Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete.

B. ASTM C33 – Concrete Aggregates.

C. ASTM C94 – Ready Mix Concrete.

D. ASTM C150 – Portland Cement.

E. ASTM C260 – Air-Entraining Admixtures for Concrete.

F. ASTM C309 – Liquid Membrane-Forming Compounds for Curing Concrete.

G. ASTM C494 – Chemical Admixtures for Concrete.

H. ASTM D1751 – Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction.

I. ASTM D1752 – Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction.

1.3 – Submittals For Review

Product Data.

1.4 – Quality Assurance

A. Perform work in accordance with ACI 301.

B. Obtain cementitious materials from same source throughout.

1.5 – Environmental Requirements

Do not place concrete when base surface temperature is less than 40°F, or surface is wet or frozen.

2.1 – Form Materials

Wood or steel form material, profiled to suit conditions.

2.2 – Concrete Materials

As specified in Section 02060 Cast-in-Place Concrete

2.3 – Accessories

A. Curing Compound: AASHTO M148 (ASTM C309), Type 1, Class A.

B. Joint Fillers: 1/2-inch preformed strips.

2.4 – Concrete Mix

A. Mix concrete in accordance with ACI 304. Deliver concrete in accordance with

ASTM C94.

B. Select proportions for normal weight concrete.

C. Provide concrete to the following criteria:

1. Compressive Strength: 3,000 psi at 28 days.

2. Slump: 3 inches.

3. Air entrainment: 3-5%.

D. Use accelerating admixtures in cold weather only when approved by the Government. Use of admixtures will not relax cold weather placement requirements.

E. Use calcium chloride only when approved by the Government.

F. Use set retarding admixtures during hot weather only when approved by the Government.

PART 3 – EXECUTION

3.1 – Examination

A. Verify base conditions under provisions of Section 02020.

B. Verify gradients and elevations of base are correct.

3.2 – Preparation

A. Moisten base to minimize absorption of water from fresh concrete.

B. Notify the Government minimum 24 hours prior to commencement of concreting operations.

3.3 – Forming

A. Place and secure forms to correct location, dimension, profile, and gradient.

B. Assemble formwork to permit easy stripping and dismantling without damaging concrete.

C. Place joint filler vertical in position, in straight lines. Secure to formwork during concrete placement.

3.4 – Placing Concrete

Place concrete in compliance with Standard Specifications. As specified in Section 02060 Cast-in-Place Concrete.

3.5 – Joints

A. General: Construct expansion, weakened-plane (contraction) and construction joints true-to-line with face perpendicular to surface of concrete. Construct transverse joints at right angles to the center line, unless otherwise indicated. Locate joints as shown on the foundation plan or, if not shown, divide concrete slabs into maximum 12-foot sections in both directions not to exceed a ratio of 4:5, as approved by the Government.

B. Weakened-Plane (Contraction) Joints: Provide weakened-plane (contraction) joints, if shown on foundation plan. Construct weakened-plane joints for a depth equal to at least 1/4 concrete thickness as follows:

1. Saw-Cut Joints: Saw cuts should be made 12 to 24 hours after finishing. Cut to a depth of 2", clean groove of loose debris.

2. Construction Joints: Place concrete joints at the end of pours and at locations where placement operations are stopped for a period of more than 1/2 hour, except where such pours terminate at expansion joints.

3. Expansion Joints: Provide pre-molded joint filler for expansion joints, in sidewalks and abutting concrete curbs, catch basins, manholes, inlets, structures, walks and other fixed objects, unless otherwise indicated. Depress joint filler 1/2 inch below surface where joint sealer is required.

3.6 – Finishing

A. Heavy Broom Finish.

B. Place curing compound on exposed concrete surfaces immediately after finishing.

Apply in accordance with manufacturer's instructions.

3.7 – Tolerances

A. Maximum Variation of Surface Flatness: 1/4 inch in 10 feet.

B. Maximum Variation From True Position: 1/4 inch.

3.8 – Field Quality Control

None.

3.9 – Protection

A. Immediately after placement, protect concrete from premature drying, excessive hot or cold temperatures, and mechanical injury.

B. Do not permit traffic over concrete until 75 percent design strength of concrete has been achieved.

***END OF SPECIFICATION 03000***

03010 –CONCRETE FORMWORK

1.1 - Summary

The work of this section consists:

A. Formwork for cast-in place concrete, with shoring, bracing, and anchorage

B. Form accessories

C. Form stripping.

1.2 – References

A. ACI 301 – Structural Concrete for Buildings.

B. ACI 318 – Building Code Requirements for Reinforced Concrete.

C. ACI 347 – Recommended Practice for Concrete Formwork.

D. PS 1 – Construction and Industrial Plywood.

1.3 – Design Requirements

Design, engineer and construct formwork, shoring, and bracing to conform to design and code requirements; resultant concrete to conform to required shape, line, and dimension.

1.4 – Quality Assurance

A. Perform work in accordance with ACI 347.

1.5 – Qualifications

Design of formwork is the responsibility of the Contractor.

1.6 – Regulatory Requirements

Conform to applicable code for design, fabrication, erection, and removal of formwork.

1.7 – Delivery, Storage, And Handling

A. Deliver, store, protect, and handle products to site under provisions of General Conditions.

B. Deliver void forms and installation instructions in manufacturer's packaging.

C. Store off ground in ventilated and protected manner to prevent deterioration from moisture.

1.8 – Coordination

A. Coordinate work under provisions of General Conditions.

B. Coordinate this Section with other Sections of work which require attachment of components to formwork.

C. If formwork is placed after reinforcement resulting in insufficient concrete cover over reinforcement before proceeding, request instructions from Government.

PART 2 – PRODUCTS

2.1 – Wood Form Materials

A. Softwood Plywood: PS 1, C Plugged Grade, Group 2.

B. Lumber: Pine species; construction grade or better; with grade stamp clearly visible.

2.2 – Prefabricated Forms

A. Preformed Steel Forms: Minimum 16 gage matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to tolerances and appearance of finished surfaces.

2.3 – Formwork Accessories

A. Form Ties: Snap-off type, galvanized metal, adjustable length, cone type, with waterproofing washer, free of defects that could leave holes larger than 1 inch in concrete surface.

B. Form Release Agent: Colorless mineral oil which will not stain concrete, or absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.

C. Dovetail Anchor Slot: Galvanized steel, 22 gage thick, foam filled, release tape sealed slots, anchors for securing to concrete formwork.

D. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required, of sufficient strength and character to maintain formwork in place while placing concrete.

E. Waterstops: Rubber, minimum 1,750 psi tensile strength, minimum 50°F to plus 175°F working temperature range, maximum possible lengths, ribbed profile, preformed corner sections, heat welded jointing.

PART 3 – EXECUTION

3.1 – Examination

A. Government to approve all forms at least 4 hours prior to placing concrete. Notify Government 24 hours in advance of pouring concrete.

B. Verify lines, levels, and centers before proceeding with formwork. Ensure that dimensions agree with drawings.

3.2 – Erection Formwork

A. Erect formwork, shoring, and bracing to achieve design requirements, in accordance with requirements of ACI 301.

B. Provide bracing to ensure stability of formwork. Shore or strengthen formwork subject to over stressing by construction loads.

C. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. Permit removal of remaining principal shores.

D. Align joints and make watertight. Keep form joints to a minimum.

E. Install void forms in accordance with manufacturer's recommendations. Protect forms from moisture or crushing.

3.3 – Form Release Agent Application

A. Apply form release agent on formwork in accordance with manufacturer's recommendations.

B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.

C. Do not apply form release agent where concrete surfaces will receive special finishes or applied coverings which are affected by agent. Soak inside surfaces of untreated forms with clean water. Keep surfaces coated prior to placement of concrete.

3.4 – Inserts, Embedded Parts And Openings

A. Provide formed openings where required for items to be embedded in passing through concrete work.

B. Locate and set in place items which will be cast directly into concrete.

C. Coordinate with work of other sections in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other Work.

D. Install accessories in accordance with manufacturer's instructions, straight, level, and plumb. Ensure items are not disturbed during concrete placement.

E. Install water stops continuous without displacing reinforcement. Heat seal joints watertight.

F. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain.

G. Close temporary openings with tight fitting panels, flush with inside face of forms, and neatly fitted so joints will not be apparent in exposed concrete surfaces.

3.5 – Form Cleaning

A. Clean forms as erection proceeds, to remove foreign matter within forms.

B. Clean formed cavities of debris prior to placing concrete.

C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out-ports.

D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts. Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure. Use compressed air or other means to remove foreign matter.

3.6 – Formwork Tolerances

A. Construct formwork to maintain tolerances required by ACI 301.

3.7 – Field Quality Control

A. Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with formwork design, and that supports, fastenings, wedges, ties, and items are secure.

B. Do not reuse wood formwork more than 3 times for concrete surfaces to be exposed to view.

C. Do not patch formwork.

3.8 – Form Removal

A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads.

B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.

C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged. Discard damaged forms.

***END OF SPECIFICATION 03010***

03020 –CONCRETE REINFORCEMENT

1.1 - Summary

The work of this section consists of reinforcing steel bars, wire fabric, and accessories for cast-in-place concrete.

1.2 – References

A. ACI 301 – Structural Concrete for Buildings.

B. ACI 318 – Building Code Requirements for Reinforced Concrete.

C. ACI SP-66 – American Concrete Institute – Detailing Manual.

D. ANSI/ASTM A82 – Cold Drawn Steel Wire for Concrete Reinforcement.

E. ANSI/ASTM A184 – Fabricated Deformed Steel Bar Mats for Concrete Reinforcement.

F. ANSI/ASTM A185 – Welded Steel Wire Fabric for Concrete Reinforcement.

G. ANSI/AWS D1.4 – Structural Welding Code for Reinforcing Steel.

H. ASTM A615 – Deformed and Plain Billet Steel Bars for Concrete Reinforcement.

I. AWS D12.1 – Welding Reinforcement Steel, Metal Inserts, and Connections in Reinforced Concrete Construction.

1.3 – Submittals

Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

1.4 – Quality Assurance

Perform Work in accordance with ACI 301, ACI SP-66 and ACI 318.

1.5 – Coordination

A. Coordinate work under provisions of General Conditions.

B. Coordinate with placement of formwork, formed openings, and other Work.

C. Masonry Joint Reinforcement: ASTM A82, unfinished.

2.1 – Reinforcement

A. Reinforcing Steel: ASTM A615, 60 ksi yield grade, as noted on drawings; deformed billet steel bars, unfinished.

B. Welded Steel Wire Fabric: ASTM A185 plain type; in flat sheets; unfinished.

2.2 – Accessory Materials

A. Tie Wire: Minimum 16 gauge annealed type.

B. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor barrier puncture.

C. Special Chairs, Bolsters, Bar Supports, Spacers Adjacent to Weather Exposed Concrete Surfaces: Plastic coated steel type; size and shape as required.

2.3 – Fabrication

A. Fabricate concrete reinforcing in accordance with ACI SP-66 and ACI 318.

B. Weld reinforcement in accordance with ANSI/AWS D1.4 and ANSI/AWS D12.1.

C. Locate reinforcing splices not indicated on drawings, at point of minimum stress.

PART 3 – EXECUTION

3.1 – Placement

A. Place, support, and secure reinforcement against displacement. Do not deviate from required position.

B. Do not displace or damage vapor barrier, if present.

C. Accommodate placement of formed openings.

D. Conform to ACI 318 code for concrete cover over reinforcement.

E. Chairs to be used for all welded-wire mesh in concrete slabs.

***END OF SPECIFICATION 03020***

03030 – CAST-IN-PLACE CONCRETE

1.1 - Summary

The work under this section shall consist of furnishing all labor, tools, materials, and equipment for construction of the pedestrian emergency gate and V-Track extension to be cast-in-place, in accordance with the details shown on drawings. All costs associated to this specification shall be considered incidental to the placement of concrete.

The location of the new V-Track extension shall continue directly to the East of the existing track. The dimensions for the cast-in-place concrete are 1 ft X 1.5 ft X 22 ft. The pedestrian emergency gate footers shall be adequate to support all loading.

1.2 – Quality Assurance

A. Standards: Concrete work shall conform to the latest edition of the following standards and to the Contract Drawings and Specifications.

B. Uniform Building Code, as adopted and modified by the local governing authority.

C. American Concrete Institute "Manual of Concrete Practice", and publication ACI 318 "Building Code Requirements for Reinforced Concrete".

D. American Society for Testing and Materials, Standards as referenced herein.

1.3 – Submittals For Review

A. Ready-mix delivery tickets shall be given to the Project Superintendent for examination by the Government.

B. The tickets shall contain the following information.

1. Number of cubic yards in batch.

2. Quantity and description of admixtures used.

3. Maximum size of aggregate.

4. Design compressive strength.

5. Gallons of water added at the site.

2.1 –Materials

A. Cement: Portland Cement, Type II, ASTM C150.

B. Aggregate:

1. Standard weight aggregates conforming to requirements of ASTM C33.

2. Uniformly graded, clean and durable material free of organic matter or other deleterious substances.

3. The maximum size used in a particular location shall be consistent with the form and dimensions of the section being placed and with the method of compaction. The aggregate sizes shall be such as will produce dense, uniform concrete, free of rock pockets, honey combs and other irregularities unacceptable to an Architectural finished surface.

4. Fill shall be compacted to 95% maximum density in 6” lifts.

C. Water: Potable, free of harmful acids, alkalis, oils and organic substances.

D. Admixtures: No admixtures shall be used unless specifically requested by the General Contractor and approved by the Government. When used, the Contractor shall provide evidence from an independent testing laboratory which assures that the admixture will have no deleterious effect upon reinforced concrete; and which indicates chemical compounds, effects upon strength, durability, and resistance to weathering and wear, and curing time.

E. Expansion Joint Filler:

1. Non-extruding, preformed type; thickness as shown on drawings or plans.

2. Fiber joint filler may be used only with a rubber asphalt sealer. Do not use fiber material with a chemically-cured sealant.

F. Control Joint: Propose layout for Government approval

2.2 – Mixes

A. Ready Mix Concrete: Transit mixed concrete shall conform to the requirements of Standard Specifications for Ready-Mix Concrete, ASTM C94, Alternative 2.

B. Proportions: Proportions of cement, aggregates and water shall be such as to produce a concrete that will work into all corners and angles of forms, and around reinforcement and inserts; and that will not segregate. Proportions shall be as required within limits specified and shall produce concrete of strength and durability required. Excess free surface water is not permitted.

C. Strength: 3,000 psi at 28 days.

D. Temperature: Concrete when deposited shall have a temperature above 50°F and below 95°F. Design shall provide for duration and type of conveyance and handling.

E. Air Entrainment: All concrete shall have 3-5% air entrainment.

PART 3 – EXECUTION

3.1 – Subgrade Preparation

Subgrades shall be shaped, dressed, moistened and compacted, as required. Test the subgrade for crown, elevation, and density in advance of placing pavement. Remove and replace soft or unsuitable material with approved material. Bring low sections, holes, or depressions to the required grades with approved material, shape the entire sub-grade to line, grade and cross , and thoroughly compact as specified.

Footings shall rest on undisturbed soil or compacted fill. In the event of over excavation for footings, over excavated portion shall be filled with concrete to correct elevation. Such concrete will be the same quality as that specified for footings.

3.2 – Preparation For Concrete Placement

A. Place embedded items, and expansion strips as indicated; maintain items securely in place. The Contractor shall give reasonable and adequate advance notice of concrete placement to all subcontractors and concerned parties who must place items to be embedded in or pass through the concrete to be poured, e.g. pipes, anchor bolts, sleeves, reglets, casings, etc., as shown on the drawings or otherwise required. Notify Government immediately of any conflict with structural elements.

B. Water shall be removed from place of deposit before concrete is placed unless otherwise permitted by the Government. All laitance and other unsound material shall be removed from hardened concrete before additional concrete is placed.

C. Screeds shall be rigidly secured in place. When the formwork is cambered, screeds shall be set to a like camber to maintain the proper concrete thickness.

D. Upon completion of preparatory operations, but prior to placement of concrete, Government shall be notified for observation minimum 24 hours prior to commencement of concreting operations. No concrete shall be placed without notification. The Government may regard preparatory work unacceptable if he has not had reasonable opportunity for such observation.

3.3 – Formwork

A. Formwork shall be structurally sound and rigid and shall conform in section and dimension to the drawings or plan. Forms are subject to the approval of the Government. Oil forms each time they are used.

B. Shoring and forms shall be cleaned of all loose dirt and other foreign matter. Dampen dry soil and forms just prior to pouring. Avoid excessive watering.

3.4 – Reinforcement

A. Reinforcing Steel: ASTM A615, 60 ksi yield grade, as noted on drawings; deformed billet steel bars, unfinished.

B. Welded Steel Wire Fabric: ASTM A185 plain type; in flat sheets; unfinished.

C. For spacing refer to drawings.

3.5 – Accessory Materials

A. Tie Wire: Minimum 16 gauge annealed type.

B. Special Chairs, Bolsters, Bar Supports, Spacers Adjacent to Weather Exposed Concrete Surfaces: Plastic coated steel type; size and shape as required.

3.6 – Joints

Joints not indicated on the drawings or plans shall be so made and located as to least impair the strength of the structure, while reducing the effects of shrinkage. The location of joints not indicated on the drawings or plans are subject to the approval of the Government.

Install pre-molded expansion joints if indicated on the drawings or plans. Expansion joint strips shall be installed to the full depth of the joint. Where caulked expansion joints are indicated on the drawings, set the top of expansion joint strips down from the finished top surface of slabs to the depth required to receive the caulking.

3.7 – Placing Concrete

A. Concrete shall be deposited as nearly as practicable in its final position to avoid segregation due to re-handling or flowing. The placing of concrete shall be carried on at such a rate that concrete is at all times plastic and flows readily into the spaces between the bars. No concrete that has been contaminated by foreign material shall be used, nor shall re-tempered concrete be used unless approved by the Government.

B. When placing is once started, it shall be carried on as a continuous operation until placement of the panel or section is completed. When construction joints are necessary, they shall be made as specified herein.

C. No concrete shall be dropped freely into place from a greater height than four feet.

Tremies shall be used for placing concrete where the drop is in excess of such height.

D. All concrete shall be thoroughly consolidated by suitable means during placement. It shall be thoroughly worked around reinforcement and embedded fixtures and into the corners of the forms. Vibration shall be transmitted directly to the concrete; in no case shall it be transmitted through the forms. The vibration shall be sufficiently intense to cause the concrete to settle readily into place and to visibly affect the concrete over a radius of at least 18". Vibrators shall not, however, be used to transport concrete or force concrete to flow horizontally. Vibration shall be supplemented by manual forking or spading adjacent to the forms on exposed faces in order to secure smooth, dense surfaces. If, for any reason, the surfaces or interiors have voids or are in any way defective, such concrete shall be repaired as directed by the Government, and no defective work shall be patched or repaired without the prior inspection and approval of the Government.

E. Slump:

1. Concrete samples shall be measured for slump in accordance with ASTM C143. The slump of the concrete shall be the minimum that is practicable.

2. In any case, the slump shall not exceed 4-1/2" without the expressed approval of the Government.

3.8 – Hot Weather Requirements

Concrete pours during hot weather should be scheduled for early morning hours to the maximum extent possible in order to permit finishing operations to be completed by noon.

3.9 – Cold Weather Requirements

A. Adequate equipment shall be provided for heating concrete materials and protecting concrete during freezing or near-freezing weather. No frozen materials or materials containing snow or ice shall be used.

B. All reinforcement, forms, fillers, and ground with which the concrete is to come in contact shall be free from snow or ice. Whenever the temperature of the surrounding air is below 40°F or higher after placement. Adequate means shall be provided for maintaining this temperature for 4 days. When high-early-strength concrete is used, a temperature of at least 45°F shall be maintained for 3 days. In either case, any additional time necessary to ensure proper curing of the concrete shall be provided as directed by the Government. The housing, covering, or other protection used in connection with curing shall remain in place and intact at least 24 hours after the artificial heating is discontinued. No dependence shall be placed on salt or other chemicals for the prevention of freezing.

C. Do not permit traffic over concrete until 75 percent design strength of concrete has been achieved.

3.10 – Removal of Forms

Forms shall be removed in such a manner as to ensure the complete safety of the structure.

3.11 – Finishing

Concrete slab shall have a Heavy Broom Finish.

3.12 – Cement Mortar

Cement mortar for the repair of imperfect concrete work, the filling of holes left by form bolts and ties, and the filling of voids around piping through concrete shall consist of cement and sand mixed in the same proportion as used for the concrete being repaired, with only sufficient water to give the required consistency, but in no case shall the water-cement ration be more than that specified for Class "A" concrete. Mortar that has not been placed within 30 minutes of mixing shall be discarded.

3.13 – Curing

Concrete shall be protected against loss of moisture, rapid drying, or temperature changes, mechanical injury or injury from rain or flowing water for a period of at least seven days in accordance with requirements of ACI 308 and ACI 305, as specified herein. Curing shall commence as soon as free water has disappeared from the surfaces after finishing.

3.14 – Defective Materials And Concrete

Concrete work shall be considered defective if not formed in accordance with the requirements of the drawings and specifications. Concrete may be judged to be unacceptable if it is not true to intended line, grade or plane, or contains sand streaks, objectionable joints, excessive pitting or dusting, voids or rock pockets detrimental to structure or finish, or which shows other irregularities, marking or deficiency including improper strength.

Defective concrete work shall be removed and replaced with new concrete acceptable to the Government, unless suitable correction of defects may be otherwise accomplished as authorized by the Government, and without additional cost to the Government.

3.15 – Protection Of Completed Work

During the curing period, protect the concrete from damaging mechanical disturbances, water flow, loading, shock, impact and vibration.

3.16 – Cleaning

After the concrete work is complete, carefully remove all excess concrete and all protective materials, expose the aggregate, and remove all mortar and other foreign materials. All concrete inserts, anchor bolts, etc., shall be cleaned of all concrete after forms are removed.

***END OF SPECIFICATION 03030***

*** END DIVISION 3 ***

DIVISION 10 – SPECIALTIES

10000 – INTRUSION DETECTION SYSTEM

PART 1 - GENERAL

1.1 – Summary

This section includes the supply and install of a complete and functional building Intrusion Detection System (IDS) to include a Video Surveillance System (VSS) for securing the Nogales Ranger District Office and Warehouse. Installation to include annual maintenance plan and monitoring service contract for 1 base year and 4 option years for the IDS, for a total of 5 years.

1.2 – General

Install all components, accessories, or appurtenances and perform testing to assure a fully operational IDS and VSS for securing District Office and Warehouse. Provide training to Forest Service personnel on proper operating procedure.

1.3 – Submittals

A. Product submittals shall include: Provide Manufacturers Original PDF catalog cut sheets in addition to hard copy for the materials incorporated into project with the specific product identified on each cut sheet by an arrow. Provide any data which substantiates that materials or products meet the contract standards or the acceptable standard product. Provide any available installation instructions.

B. Submit manufacturer's certificate of compliance with referenced specifications and standards signed by a representative in the manufacturer's employ.

C. Deliver to the job site in the original sealed containers with manufacturer's name, product name, type of product, manufacturer's specifications or catalog number, Federal specifications number, instructions for reducing where applicable, label analysis and be available and convenient for inspection. Include Material Safety Data Sheets.

D. Submit one (1) copy of shop drawings and product information of all products listed in Part 2 Products of this section

1.4 – Quality Assurance

A. All components supplied for the IDS and the VSS shall be from the same manufacturer.

B. Installer's Qualifications must include equipment manufacturers. Personnel must be certified to install all components and equipment.

1.5 – Delivery, Storage, and Handling

Deliver in original packaging and store in a dry and secure location accessible for inspection. Comply with fire and health regulations.

PART 2 - PRODUCTS

2.1 - Components

A. Base Station: 2 Total (1 @ Office, 1 @ Warehouse)

B. Keypad: 5 Total (3 @ Office, 2 @ Warehouse)

C. Entry Sensor: 33 Total (20 @ Office, 13 @ Warehouse)

D. Motion Sensor: 6 Total (6 @ Office, 0 @ Warehouse)

E. Panic Button: 1 Total (1 @ Office, 0 @ Warehouse)

F. Siren: 2 Total (1 @ Office, 1 @ Warehouse)

G. Camera: 10 Total (7 @ Office, 2 @ Warehouse, 1 @ Gate)

H. Monitor: (1 @ Office, 0 @ Warehouse)

PART 3 - EXECUTION

3.1 – Installation

A. Install in accordance with manufacturers recommendations.

B. Locate and install components at locations as directed per COR.

C. After installation, the Contractor shall submit all documentation to support the warranty in accordance with the manufacturer’s warranty requirements, including test results, and to apply for said warranty on behalf of the customer.

*** END OF SPECIFICATION 10000 ***

10010 – PHYSICAL ACCESS CONTROL SYSTEM

1.1 – Summary

This section includes the supply and install of a complete and functional Physical Access Control System (PACS) for securing the Nogales Ranger District Office and Warehouse.

1.2 – General

Install all components, accessories, or appurtenances and perform testing to assure a fully operational PACS for securing District Office and Warehouse. Provide training to Forest Service personnel on proper operating procedure.

1.3 – Submittals

A. Product submittals shall include: Provide Manufacturers Original PDF catalog cut sheets in addition to hard copy for the materials incorporated into project with the specific product identified on each cut sheet by an arrow. Provide any data which substantiates that materials or products meet the contract standards or the acceptable standard product. Provide any available installation instructions.

B. Submit manufacturer's certificate of compliance with referenced specifications and standards signed by a representative in the manufacturer's employ.

C. Deliver to the job site in the original sealed containers with manufacturer's name, product name, type of product, manufacturer's specifications or catalog number, Federal specifications number, instructions for reducing where applicable, label analysis and be available and convenient for inspection. Include Material Safety Data Sheets.

D. Submit one (1) copy of shop drawings and product information of all products listed in Part 2 Products of this section

1.4 – Quality Assurance

A. All components supplied for the PACS shall be from the same manufacturer.

B. Installer's Qualifications must include equipment manufacturers. Personnel must be certified to install all components and equipment.

1.5 – Delivery, Storage, and Handling

PART 2 - PRODUCTS

2.1 - Components

A. HID Cards: 1,000 Total

B. HSPD12, FIPS 201 Compliant Multi-Technology Card Readers: 12 Total (5 @ Office, 7 @ Warehouse)

PART 3 - EXECUTION

3.1 – Installation

A. Install in accordance with manufacturers recommendations.

B. Locate and install components at locations as directed per COR.

C. After installation, the Contractor shall submit all documentation to support the warranty in accordance with the manufacturer’s warranty requirements, including test results, and to apply for said warranty on behalf of the customer.

*** END OF SPECIFICATION 10010 ***

10020 – REPLACEMENT LIGHTBULB

1.1 – Summary

This section includes replacement of lightbulbs on the exterior of the Nogales Ranger District Warehouse.

1.2 – General

Install all lights and perform testing to assure a fully operational.

1.3 – Submittals

A. Product submittals shall include: Provide Manufacturers Original PDF catalog cut sheets in addition to hard copy for the materials incorporated into project with the specific product identified on each cut sheet by an arrow. Provide any data which substantiates that materials or products meet the contract standards or the acceptable standard product. Provide any available installation instructions..

B. Deliver to the job site in the original sealed containers with manufacturer's name, product name, type of product, manufacturer's specifications or catalog number, Federal specifications number, instructions for reducing where applicable, label analysis and be available and convenient for inspection. Include Material Safety Data Sheets.

C. Submit one (1) copy of shop drawings and product information of all products listed in Part 2 Products of this section

1.4 – Quality Assurance

A. All same model-type lights shall be from the same manufacturer.

1.5 – Delivery, Storage, and Handling

Deliver in original packaging and store in a dry and secure location accessible for inspection. Comply with fire and health regulations.

PART 2 - PRODUCTS

2.1 - Lightbulb

A. 50-WATT High Pressure Sodium, or approved equal.

B. F96T12, or approved equal.

PART 3 - EXECUTION

3.1 – Installation

A. Replace 10 (ten) Exterior Lightbulbs at Warehouse. Bulb: 50-WATT High Pressure Sodium.

B. Replace 4 (four) Exterior Lightbulbs at Warehouse. Lamp Bulb: F96T12.

*** END OF SPECIFICATION 10020 ***

*** END DIVISION 10 ***

DIVISION 13 – SPECIAL CONSTRUCTION

13000 – PHYSICAL SECURITY BARRIER

1.1 – Summary

This section includes all work associated with the supply and construction of a Physical Security Barrier (PSB) to properly re-configure the front lobby and secure the non-public space to prevent unauthorized access. The PSB consists of the construction of a new wall with accompanying security door and the installation of security glass. The installation of a new security door for the Law Enforcement evidence room and the re-keying of the District Safe room shall also be addressed.

1.2 – General

Install all components, accessories, or appurtenances in accordance with manufacturers recommendation and industry standard best building practice.

1.3 – Submittals

A. Product submittals shall include: Provide Manufacturers Original PDF catalog cut sheets in addition to hard copy for the materials incorporated into project with the specific product identified on each cut sheet by an arrow. Provide any data which substantiates that materials or products meet the contract standards or the acceptable standard product. Provide any available installation instructions.

B. Submit manufacturer's certificate of compliance with referenced specifications and standards signed by a representative in the manufacturer's employ.

C. Deliver to the job site in the original sealed containers with manufacturer's name, product name, type of product, manufacturer's specifications or catalog number, Federal specifications number, instructions for reducing where applicable, label analysis and be available and convenient for inspection. Include Material Safety Data Sheets.

D. Submit one (1) copy of shop drawings and product information of all products listed in Part 2 Products of this section

1.4 – Quality Assurance

A. All work shall be completed by Licensed Contractors in good standing in the State of Arizona.

1.5 – Delivery, Storage, and Handling

2.1 - Materials

A. Polycarbonate Security Glass LP 750 Level I, Total Security Solutions, Inc., or approved equal.

B. Non-Secure Framing, Total Security Solutions, Inc., or approved equal.

C. Wood Door and Frame Level I, U.L. 752 Standards Compliant, Total Security Solutions, Inc., or approved equal.

D. Steel Stud 16ga, Clark Dietrich, or approved equal.

E. Gypsum Board 5/8”.

PART 3 - EXECUTION

3.1 – Installation

A. Install security glass in locations as shown on drawings in accordance with manufacturers recommendations.

B. Construction of wall framing shall be standard steel stud construction with gypsum board. Secure wall to existing brick wall, brick ceiling and floor.

C. Replace Law Enforcement Evidence Room door with security door.

D. Re-key District Safe Room door.

*** END OF SPECIFICATION 13000 ***

13010 – METAL GATE

1.1 – Summary

This section includes all work associated with removal and replacement of the Nogales District Office Work Center Gate. Installation of additional V-Track. Supply and install of fence panel and gate to secure AC equipment. Supply and Installation of a secondary pedestrian emergency egress gate.

1.2 – General

Install all components, accessories, or appurtenances in accordance with manufacturers recommendation and industry standard best building practice.

1.3 – Submittals

A. Product submittals shall include: Provide…