Exhibit R - Past Performance Form-Questionaire.pdf

PDF 398 KB Posted

Attached to
X1AA--Saginaw CC-HBPC Clinic RLP Amendment 0004 RLP 36C25022R0049
Solicitation number
36C25022R0049
Issued by

View the file

Other files

File Type Posted
36C25022R0049 0004_1.docx DOCX document
36C25022R0049 0004.pdf PDF
36C25022R0049 0003_1.docx DOCX document
36C25022R0049 0002_1.docx DOCX document
36C25022R0049 0001-Complete.pdf PDF
36C25022R0049 0001_1.docx DOCX document
Exhibit B - ASR Requirements - CC-HBPC.pdf PDF
Exhibit E - GSA Form 1364 Proposal to Lease Space - Rev.10.2018.docx DOCX document
Exhibit F - GSA Form 1217 Lessors Annual Cost Statement rev.11.2016.pdf PDF
Exhibit Q - Pre-Proposal Conference Registration.pdf PDF
Exhibit A - 36C25022L0015 Lease Saginaw CC HBPC.pdf PDF
Exhibit J - VA6500.6 Contractor Security IT Handbook.pdf PDF
Exhibit S - Appendix - Applicable Codes and Standards.pdf PDF
Exhibit L - Certification of Building Energy Performance.pdf PDF
Exhibit I - TICS Table (10.13.2015).xlsx XLSX spreadsheet
Exhibit T - FAR 52.204-24 Representation Telecommunications(Rev-11.21).pdf PDF
Exhibit G - GSA Form 12000 Prelease FPLS Eval Off Bldg rev.5.2015.pdf PDF
Exhibit K - Wage Determination-MI20220097 - 06.24.2022.pdf PDF
Exhibit C - GSA Form 3516 - Solicitation Provisions (Modified-7-21).pdf PDF
Exhibit M - Offering Entity Acknowledgement Form.pdf PDF
Exhibit N - Contractor Confidentiality Certificate.pdf PDF
Exhibit D - GSA Form 3517B - General Clauses (Modified-01-22).pdf PDF
Exhibit H - FSL Level II Security Requirements and Price List.pdf PDF
Exhibit O - SF330 Architect-Engineer Qualifications rev 8.2016.pdf PDF
Exhibit P - GSA Form 527 Contractor Qualifications Financial Information.rev10.2015.pdf PDF
36C25022R0049_1.docx DOCX document
36C25022R0049 RLP Saginaw CC HBPC.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Past Performance Questionnaire Page 1 of 6

RLP No.: _____________________

PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Offeror to complete Blocks 1-4)

1. OFFEROR INFORMATION

Past Performance Reference No.: _____________________________________________________________ Offeror Name: _____________________________________________________________________________ Address: _________________________________________________________________________________ Phone Number:_______________________________ UEI Number: ________________________________ Contact Name: ____________________________________________________________________________ Email Address: _______________________________ Contact Phone Number: _________________________

2. GENERAL WORK INFORMATION

Work performed as: Offering Entity Key Personnel Percent (%) of project work performed by Offering Entity or Key Personnel: _____________________________ List of Major Subcontractor(s) and Role(s):_______________________________________________________

3. CONTRACT INFORMATION

Contract Number: __________________________________________________________________________ Contractor Name - Contract Awarded To: _______________________________________________________ Contractor Contact Name: ___________________________________________________________________ Phone:_________________________________________ Email: ____________________________________ Contract Type: Firm Fixed Price Cost Reimbursement Other (Please explain) Contract Title: _____________________________________________________________________________ Contract Location: __________________________________________________________________________ Award Date (mm/dd/yy): ___________________________________________ Construction Completion Date (mm/dd/yy): _____________________________ Awardee Ongoing Services: _________________________________________ Original Contract Price (Award Amount): _______________________________ Final Contract Price (to include all modifications, if applicable): _______________________________________

REFERENCE INFORMATION

Past Performance Questionnaire Reference

Name & Title:

Phone No.:

Email:

Address:

Contracting Officer (CO) or Individual Responsible for Signing Contract

Name & Title:

Phone No.:

Email:

Address:

Resident Engineer/COR’s Technical Representative

Name & Title:

Phone No.:

Email:

Address:

Past Performance Questionnaire Page 2 of 6

PAST PERFORMANCE QUESTIONNAIRE (CONTINUED)

4. PROJECT DESCRIPTION

Type of Work (check all that apply): VA Federal Medical Office Other:_______________ Reference Project Key Personnel Assigned as Key to Lease Project: Yes No If yes, please provide key personnel names and roles:

KEY PERSONNEL NAMES AND ROLES

DETAILED DESCRIPTION OF THE WORK PERFORMED

EXPLANATION OF RELEVANCY TO RLP REQUIREMENTS

Past Performance Questionnaire Page 3 of 6

INSTRUCTIONS FOR REFERENCES COMPLETING THIS QUESTIONNAIRE: VA requests that the Offerors’s Reference completes this questionnaire and submits it directly back to VA’s Contract Officer/Specialist at Lisa Newlin at Lisa.Newlin@va.gov no later than ___________PM Local Time on _________________, 2022 with a subject line that reads RLP No. ___________________, [Name of Offeror], Completed Past Performance Questionnaire”.

The government reserves the right to verify all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per VA policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

Past Performance Questionnaire Page 4 of 6

TO BE COMPLETED BY PPQ REFERENCE

PPQ REFERENCE

PPQ Reference Point of Contact Information:______________________________________________________ Name: ______________________________________________________________________________________ Title: _______________________________________________ Agency/Company: ____________________________________ Phone Number: ______________________________________ Email Address: ______________________________________

Contract No.: _______________________________________ Contract Type: _______________________________________ Contract Title: ________________________________________ Contract Location: ________________________

Describe your role in the project:

Does the narrative in No. 4, above, accurately describe the scope, complexity, and relevance?

Date Questionnaire was completed (mm/dd/yy):

PPQ Reference’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of building design, construction, workmanship, quality of materials used, interior spaces, and overall appearance.

(b) Ability to meet quality standards specified for technical performance.

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

(c) Rate your satisfaction with the contractor’s ability to respond to questions and/or comments in a timely manner.

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project?

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

(d) Overall customer satisfaction.

Past Performance Questionnaire Page 5 of 6

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of management, including management of subcontractors and/or labor force?

(b) Ability to hire, apply, and retain a qualified workforce to this effort.

(c) Government Information Property Control.

(d) Knowledge/expertise demonstrated by contractor key personnel.

(e) Government contract requiring a subcontracting plan (Complete if the contractor was required to submit and adhere to a small business subcontracting plan. Were small business goals met?

(f) Ability to simultaneously manage multiple projects with multiple disciplines.

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the project).

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)?

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the

PM.

(c) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.) Yes No

(d) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

Yes No

(e) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.) Yes No

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users’ rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all general and IT security requirements for the project and personnel security requirements.

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below

(c) In summary, provide an overall rating for the work performed by this contractor.

Past Performance Questionnaire Page 6 of 6

8. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.) Yes No

COMMENTS SECTION

Please provide responses to the above questions (if applicable) and/or additional remarks. Also, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

SIGNATURE

Signature: ___________________________________________________________________________________ Name: ______________________________________________________________________________________ Date: _____________________________________________ Title: ______________________________________________ Phone Number: _____________________________________ Email Address: ______________________________________

Past Performance Reference No:
Offeror Name:
Address:
Phone Number:
DUNs Number:
Contact Name:
Email Address:
Contact Phone Number:
Percent of project work performed by Offering Entity or Key Personnel:
List of Major Subcontractors and Roles:
Contract Number:
Contractor Name Contract Awarded To:
Contractor Contact Name:
Phone:
Email:
Firm Fixed Price: Off
Cost Reimbursement: Off
Other Please explain: Off
Contract Title:
Contract Location:
Award Date mmddyy:
Construction Completion Date mmddyy:
Awardee Ongoing Services:
Original Contract Price Award Amount:
Final Contract Price to include all modifications if applicable:
Name Title:
Phone No:
Email_2:
Address_2:
Name Title_2:
Phone No_2:
Email_3:
Address_3:
Name Title_3:
Phone No_3:
Email_4:
Address_4:
Other:
Reference Project Key Personnel Assigned as Key to Lease Project: Off
PPQ Reference Point of Contact Information:
Name:
Title:
AgencyCompany:
Phone Number_2:
Email Address_2:
Contract No:
Contract Type:
Contract Title_2:
Contract Location_2:
undefined_131: Off
undefined_132: Off
undefined_133: Off
Name_2:
Title_2:
Phone Number_3:
Email Address_3:
Offering Entity: Off
Key Personnel: Off
Name and Roles2:
Name and Roles3:
Name and Roles4:
Name and Roles5:
Name and Roles6:
Name and Roles7:
Name and Roles1:
Work1:
Work2:
Work3:
Work4:
Work5:
Work6:
Work7:
Work8:
Work9:
Work10:
Time: 1:00PM
Date:
Date-1:
RLP No: 36C25022R0049 - Saginaw CCHBPC
Date4_af_date:
Role In Project:
Comments1:
Comments2:
Comments3:
Comments4:
Comments5:
Comments6:
Comments7:
Comments8:
Comments9:
Comments10:
Comments11:
Comments12:
Comments13:
Comments14:
Comments15:
Comments16:
Comments17:
Comments18:
Comments19:
Comments20:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box37:
0:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
1:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
2:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
3:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
4:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
5:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
7:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
8:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
9:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box39:
0:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
1:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
2:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
3:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
4:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
Check Box38:
0:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
1:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
2:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
3:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off
4:
0: Off
1: Off
2: Off
3: Off
4: Off
5: Off

Group1: Off

File details come from the government source that posted it. Updated .