Exhibit N TI Unit Price List.pdf
PDF 614 KB Posted
- Solicitation number
- 36C24W24R0040
- Issued by
-
Department of Veterans Affairs
About this file
This document appears to be a Tenant Improvement Cost Summary (TICS) template for a federal real estate lease opportunity. It provides a detailed cost breakdown for both the shell space and tenant improvements (TI) across various construction divisions such as general requirements, finishes, HVAC, plumbing, and electrical. The template includes fields for the Occupant Area (ABOA) square footage, TI allowance per ABOA SF, contractor fees, architectural/engineering fees, and other lessor costs. While the document does not directly address the required products or services, it indicates this template would be used to provide cost estimates for the shell and tenant improvement build-out as part of a federal real estate leasing solicitation.
The related federal contract opportunity is for leasing a minimum of 16,000 to a maximum of 16,800 ABOA SF of space for a Community-Based Outpatient Clinic (CBOC) in Las Cruces, New Mexico. The solicitation is being issued by the Department of Veterans Affairs.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
for 0 ABOA SF= -
Agency: 0 TIA PER ABOA SF= $ -
January 0, 1900 Location: January 0, 1900 TOTAL TIA $ -
RU Factor #DIV/0! RSF= - Masterformat
CSI System Elements TI* SHELL**
Div 1 General Requirements $ - $ - Div 2 Site work & Demolition $ - $ - Div 3 Concrete $ - $ - Div 4 Foundations / Masonry $ - $ - Div 5 Metals $ - $ - Div 6 Woods & Plastics $ - $ - Div 7 Thermal & Moisture $ - $ - Div 8 Doors & Windows $ - $ - Div 9 Finishes $ - $ - Div 10 Specialties $ - $ - Div 11 Equipment $ - $ - Div 12 Furnishings $ - $ - Div 13 Special Construction $ - $ - Div 15 General Construction $ - $ - Div 21 Fire Suppression $ - $ - Div 22 Plumbing $ - $ - Div 23 HVAC $ - $ - Div 26.1 Electrical $ - $ - Div 26.2 Lighting $ - $ - Div 27 Communications, Security & Other Elec. Systems $ - $ - Div 28.1 Electrical safety & Security $ - $ - Div 28.2 Security $ - $ - Div 32 Exterior $ - $ -
Subtotal Trade Costs $ - $ - General Contractor Fee Percent $ - $ -
Subtotal Construction Costs $ - $ - Architectural & Engineering Fees (NIC DID costs) lump sum $ - $ - Other Lessor Costs Established Under the Lease $ - $ -
Subtotal Lessor's Costs: $ - $ - Lessor's Project Management Fee Percent $ -
Total Price to Government: GRAND TOTAL $ - Cost per ABOA SF #DIV/0! #DIV/0!
Cost per RSF #DIV/0! #DIV/0!
Notes:
* Include all subcontractors' costs.
** Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the SHELL
DEFINITIONS tab, and the lease for further information.
TENANT IMPROVEMENTS COST SUMMARY (TICS)
EXHIBIT N
LEASE GS-XXX-XXXXX or Project Agency
Location: City, State
ABOA SF =
TENANT IMPROVEMENT ALLOWANCE PER ABOA SF = General contractor fee, A/E
Fee and Lessor's Project RSF= Management Fee fields are
DATE: structured to allow you to choose percentage or a lump sum.
Tenant Improvement General Contractor Fee percent Shell General Contractor Fee percent
Tenant Improvement A/E Fees (per Lease) lump sum For A/E fees established as a cost per ABOA sf, convert
Shell A/E Fees lump sum rate to lump sum.
Lessor's TI Project Management Fee (per Lease) percent
Other Lessor Costs Established Under the Lease TI Shell
TOTAL $ - $ -
INFORMATION NEEDED TO COMPLETE TICS TABLE
Read and understand SHELL DEFINITION tab.
Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worksheet. This includes ANSI-BOMA Office Area (ABOA) square footage, General Contractor Fee, Lessor's Project Management Fee, and A/E Fees. Note that some of these fees are already established under the lease agreement and must be used when completing this worksheet.
Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
Material Description Accurately describe each item being priced.
Quantity List the quantity e.g., 1,2, 3, etc.
Unit (Example) LS,EA,GAL,LF, SF, etc.
Cost Amount Total Total cost of all material.
Labor Hours Time projected to perform the task.
Labor Rate Cost per hour of labor.
Total Cost of labor.
TOTAL Combines overall materials and labor.
Shell
1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.
2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.
Tenant Improvements (TI)
TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.
1. Fill out fields titled (TI), inputting only costs associated with (TI).
2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.
DATE PREPARED
CONSTRUCTION COST ESTIMATE January 0, 1900
DIVISION 9 - FINISHES (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL XYZ Paint 1 GAL. $25.00 $25.00 2.5 $36.25 $90.63
$0.00 $0.00 $0.00 $0.00
Total $25.00 Total $90.63
TOTAL $115.63
ABC Paint 10 GAL. $27.00 $270.00 6.0 $36.25 $217.50 $0.00 $0.00 $0.00 $0.00
Total $270.00 Total $217.50
TOTAL $487.50
DIVISION 9 - FINISHES (SHELL)
INSTRUCTIONS
Per GSA Pricing Desk Guide, 4th Edition.
DATE PREPARED
CONSTRUCTION COST ESTIMATE January 0, 1900
DIVISION 1 - GENERAL REQUIREMENTS (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
TOTAL $0.00
DIVISION 2 - SITE WORK AND DEMOLITION (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 2 - SITE WORK AND DEMOLITION (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 3 - CONCRETE (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 3 - CONCRETE (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 4 - MASONRY (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 4 - MASONRY (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 5 - METALS (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 5 - METALS (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 6 - WOOD AND PLASTICS (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 6 - WOOD AND PLASTICS (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 7 - THERMAL & MOISTURE (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 7 - THERMAL & MOISTURE (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 8 - DOORS & WINDOWS (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 8 - DOORS & WINDOWS (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 9 - FINISHES (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 9 - FINISHES (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 10 - SPECIALTIES (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 10 - SPECIALTIES (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 11 - EQUIPMENT (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 11 - EQUIPMENT (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 12 - FURNISHINGS & EQUIPMENT (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 13 - SPECIAL CONSTRUCTION (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 13 - SPECIAL CONSTRUCTION (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 15 - GENERAL CONSTRUCTION (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 15 - GENERAL CONSTRUCTION (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 22 - PLUMBING (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 22 - PLUMBING (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 23 - HVAC (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 23 - HVAC (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 26.1 - ELECTRICAL (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 26.2 - ELECTRICAL (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 26.2 - LIGHTING (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 26.2 - LIGHTING (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 27 - COMMUNICATIONS (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 27 - COMMUNICATIONS (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 28.1- ELECTRICAL SAFETY (TI),
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 28.1 - ELECTRICAL, SAFETY (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
DIVISION 28.2 - SECURITY (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00 $0.00 $0.00$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 28.2 - SECURITY (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00$0.00 $0.00
DIVISION 32 - EXTERIOR (TI)
MATERIAL LABOR
DESCRIPTION QUAN. UNIT COST TOTAL HOURS Labor Rate TOTAL
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
TOTAL $0.00 TOTAL $0.00
DIVISION 32 - EXTERIOR (SHELL) TOTAL $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
Accessibility Report
Filename:
TICS Table 5-15-2013.pdf
Report created by:
Organization:
LMI
[Personal and organization information from the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 0
Passed manually: 0
Failed manually: 0
Skipped: 20
Passed: 12
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Skipped Accessibility permission flag must be set
Image-only PDF Skipped Document is not image-only PDF
Tagged PDF Skipped Document is tagged PDF
Logical Reading Order Skipped Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Skipped Document title is showing in title bar
Bookmarks Skipped Bookmarks are present in large documents
Color contrast Skipped Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Skipped All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Skipped All multimedia objects are tagged
Screen flicker Skipped Page will not cause screen flicker
Scripts Skipped No inaccessible scripts
Timed responses Skipped Page does not require timed responses
Navigation links Skipped Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Skipped All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Skipped Alternate text that will never be read
Associated with content Skipped Alternate text must be associated with some content
Hides annotation Skipped Alternate text should not hide annotation
Other elements alternate text Skipped Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Skipped Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Skipped Appropriate nesting
Back to Top
File details come from the government source that posted it. Updated .