View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRE-PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITNATIONAL AVERAGE MATERIAL (MATL) UNIT COSTMATL TOTAL COSTNATIONAL AVERAGE LABOR UNIT COSTLABOR TOTAL COSTNATIONAL AVERAGE EQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Selective demolition, rubbish handling, dumpster, 40 C.Y., 10 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost0241191908404WK$ 775.00$ 3,100.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Central station air handler, 17.5 thru 30 ton, selective demolition2305051004103EA$ - 0$ - 0$ 1,175.00$ 3,525.00$ - 0$ - 0$ - 0$ - 0
Ductwork, metal; steel and stainless steel, fabricated, selective demolition2305051015702000LB$ - 0$ - 0$ 0.90$ 1,800.00$ - 0$ - 0$ - 0$ - 0
Fans, 1-1/2 thru 10 HP or 20,000 CFM, selective demolition2305051021242EA$ - 0$ - 0$ 169.00$ 338.00$ - 0$ - 0$ - 0$ - 0
Balancing, air conditioning equipment, central station, (Subcontractor's quote including material & labor)2305931020003EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 910.00$ 2,730.00
Balancing, air conditioning equipment, central station, built-up low pressure unit, (Subcontractor's quote including material & labor)2305931021003EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 840.00$ 2,520.00
Balancing, air conditioning equipment, supply, return, exhaust, registers and diffusers, induction unit, (Subcontractor's quote including material & labor)23059310350020EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 91.00$ 1,820.00
Balancing, water, boiler, (Subcontractor's quote including material & labor)2305932000802EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 515.00$ 1,030.00
Balancing, water, converter, (Subcontractor's quote including material & labor)2305932004001EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 365.00$ 365.00
Balancing, water, pumps, (Subcontractor's quote including material & labor)2305932010004EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 320.00$ 1,280.00
Control components/DDC system, subcontractor's quote incl. material & labor, analog inputs, sensors (average 50' run in 1/2" EMT), duct temperature23092310012014EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 415.00$ 5,810.00
Control components/DDC system, analog inputs, sensors (average 50' run in 1/2" EMT), space temperature2309231001305EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 665.00$ 3,325.00
Control components/DDC system, subcontractor's quote incl. material & labor, analog inputs, sensors (average 50' run in 1/2" EMT), duct humidity, +/- 3%2309231001403EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 695.00$ 2,085.00
Control components/DDC system, subcontractor's quote incl. material & labor, status (alarms), digital inputs (average 50' run in 1/2" EMT), current sensor23092310215015EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 435.00$ 6,525.00
Control components/DDC system, status (alarms), digital output (average 50' run in 1/2" EMT), start/stop2309231022105EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 340.00$ 1,700.00
Control components/DDC system, status (alarms), digital output (average 50' run in 1/2" EMT), on/off (maintained contact)23092310222010EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 585.00$ 5,850.00
Control components/DDC system, subcontractor's quote incl. material & labor, controller MUX panel, 48 point, incl. function boards2309231031002EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 5,275.00$ 10,550.00
Control components/DDC system, subcontractor's quote incl. material & labor, DDC controller (average 50' run in conduit), mechanical room, 32 point controller, incl. 120V/1 phase power supply2309231032294EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 5,425.00$ 21,700.00
Control components/DDC system, subcontractor's quote incl. material & labor, host computer (average 50' run in conduit), package complete with PC, keyboard, printer, monitor & basic software2309231032821EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 3,150.00$ 3,150.00
Control components/DDC system, front end costs, computer (PC) with software program2309231041001EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 6,350.00$ 6,350.00
Control components/DDC system, front end costs, color graphics software2309231042001EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 3,925.00$ 3,925.00
Control components/DDC system, front end costs, engineering labor, excl. drafting23092310450075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 94.00$ 7,050.00
Control components/DDC system, front end costs, calibration labor23092310460075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 120.00$ 9,000.00
Control components/DDC system, front end costs, startup, checkout labor23092310470075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 120.00$ 9,000.00
Control components/DDC system, communications bus (data transmission cable), #18 twisted shielded pair in 1/2" EMT conduit2309231050104CLF$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 380.00$ 1,520.00
Control components/DDC system, applications software, basic maintenance manager software, excl. database entry2309231080501EA$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,950.00$ 1,950.00
Control components/DDC system, applications software, time program23092310810075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 6.85$ 513.75
Control components/DDC system, applications software, duty cycle23092310812075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 13.65$ 1,023.75
Control components/DDC system, applications software, optimum start/stop23092310814075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 41.50$ 3,112.50
Control components/DDC system, applications software, demand limiting23092310816075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 20.50$ 1,537.50
Control components/DDC system, applications software, enthalpy program23092310818075PT$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 41.50$ 3,112.50
Control component, burner solenoid valve, iron body, three way, flanged, 3" pipe size2309531078701EA$ 1,325.00$ 1,325.00$ 305.00$ 305.00$ - 0$ - 0$ - 0$ - 0
Hydronic heat control valve, system balancing and shut-off, butterfly, quarter turn, calibrated, bronze, threaded or solder, -30Deg. F to +350Deg. F, pressure to 175 psi, 3/4" size2321205880701EA$ 29.00$ 29.00$ 26.00$ 26.00$ - 0$ - 0$ - 0$ - 0
Metal ductwork, fabricated rectangular, galvanized steel, 2000 to 5000 lb., incl fittings, joints, supports & allow for a flexible connections field sketches, excludes as-built drawings and insulation2331131305701000LB$ 0.56$ 560.00$ 5.05$ 5,050.00$ - 0$ - 0$ - 0$ - 0
Insulation, ductwork, board type, fiberglass liner, FSK, 1-1/2 lb. density, 2" thick2333531033461000SF$ 1.34$ 1,340.00$ 7.05$ 7,050.00$ - 0$ - 0$ - 0$ - 0
Diffuser, aluminum, ceiling, perforated, 24" x 24" lay-in panel size, 12" x 12", includes opposed blade damper23371310056020EA$ 184.00$ 3,680.00$ 41.50$ 830.00$ - 0$ - 0$ - 0$ - 0
Grille, steel, air return, 24" x 24"2337133012604EA$ 65.50$ 262.00$ 33.00$ 132.00$ - 0$ - 0$ - 0$ - 0
Furnace components and combinations, air handler, modular, 30 kW, 102 MBH, includes heater2354241041803EA$ 2,581.80$ 7,745.40$ 90.65$ 271.95$ - 0$ - 0$ - 0$ - 0
Heat pump, air to air split system, 3 ton cooling, 13 MBH heat @ 0Deg.F, includes outside condensing unit only, excludes interconnecting tubing, curbs, pads and ductwork23814310104010EA$ 2,150.00$ 21,500.00$ 785.00$ 7,850.00$ - 0$ - 0$ - 0$ - 0
Heat pump, air to air split system, 7.5 ton cooling, 33 MBH heat @ 0Deg.F, includes outside condensing unit only, excludes interconnecting tubing, curbs, pads and ductwork2381431010801EA$ 3,975.00$ 3,975.00$ 2,100.00$ 2,100.00$ - 0$ - 0$ - 0$ - 0
Heating and ventilating unit, classroom type, heating/cooling coils, 2,000 CFM, 5 tons cooling, includes filter and standard controls2382192001602EA$ 7,200.00$ 14,400.00$ 2,925.00$ 5,850.00$ - 0$ - 0$ - 0$ - 0
Conduit, electric metallic tubing (EMT), 1/2" to 1" diameter, electrical demolition, remove conduit to 10' high, including fittings & hangers260505100200600LF$ - 0$ - 0$ 1.25$ 750.00$ - 0$ - 0$ - 0$ - 0
Electric metallic tubing (EMT), 2" diameter, to 10' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF260533135100200LF$ 4.37$ 874.00$ 6.15$ 1,230.00$ - 0$ - 0$ - 0$ - 0
Circuit breaker, 3 pole, 600 volt, 100 amp, enclosed (NEMA 1)2628161004006EA$ 735.00$ 4,410.00$ 213.00$ 1,278.00$ - 0$ - 0$ - 0$ - 0
Disconnect switch, 3 pole fusible, 100 amp, to 60 HP motor, 600 volt2628162090706EA$ 800.00$ 4,800.00$ 258.00$ 1,548.00$ - 0$ - 0$ - 0$ - 0
Variable frequency drives, enclosed, 460 volt, 5 HP motor size, NEMA 12629231001103EA$ 2,050.00$ 6,150.00$ 615.00$ 1,845.00$ - 0$ - 0$ - 0$ - 0
Motors, dripproof, premium efficiency, 1.15 service factor, 1,800 RPM, 230/460 V, 60 Hz, 3 HP2671132002002EA$ 805.00$ 1,610.00$ 109.00$ 218.00$ - 0$ - 0$ - 0$ - 0
TOTALS$ 75,760.40$ 41,996.95$ - 0$ 118,535.00
NON-PRE-PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Air Pollution Control District (APCD) notification fee 501 SF to 2,000 SF1EACH$ 250.00$ 250.00
PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$236,292.35
CITY COST INDEX _110.6____ (_SAN DIEGO, CA WEIGHTED AVERAGE)_$25,046.99
SUBTOTAL (PREPRICED LINE TOTALS + CCI)$261,339.34
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __7.75%_______$5,871.43
SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX)$267,210.77THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2020 BASE DATA.
PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET)DO NOT CHANGE THE UNIT PRICING OR SALES TAX PROVIDED.
TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 58) + PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 58 X LINE 59)ENTER YOUR EXHIBIT K COEFFICIENTS, COMPLETE THE CALCULATIONS IN ROWS 59 TO 68 AND RETURN.
NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$250.00
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%_________$0.00
SUBTOTAL$250.00
NON-PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET)
TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 64) + NON-PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 64 X LINE 65)
TOTAL TASK ORDER PRICE (LINE 60 + LINE 66)
NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE. IF AN OFFEROR BELIEVES THERE ARE PROBLEMS WITH THIS FORM, IT IS THE OFFEROR'S RESPONSIBILITY TO PROVIDE DOCUMENTATION OR EVIDENCE PRIOR TO SUBMISSION OF PROPOSALS TO ALLOW FOR GOVERNMENT REVIEW. THIS WILL BE THE BASIC FORMAT FOR ALL TASK ORDER PROPOSALS AFTER AWARD.

File details come from the government source that posted it. Updated .