CDBG-DR Lantern Park Stormwater Pond Construction
Solicitation number
26-B-119KW
Issued by
Volusia County, Florida

About this file

This is a bonding requirements exhibit for federal grant-funded construction contracts, specifically implementing 24 CFR Part 85.36 requirements for Volusia County's Office of Recovery and Resiliency in Florida, which is managing HUD Community Development Block Grant for Disaster Recovery (CDBG-DR) funding. The exhibit establishes mandatory bonding compliance standards that must be verified prior to issuance of the notice to proceed for the Lantern Park Stormwater Pond Construction project, a Hurricane Ian recovery initiative. The bonding requirements apply to all construction and facility improvement contracts or subcontracts exceeding the simplified acquisition threshold and are binding unless the awarding agency has made a specific determination that its interests are adequately protected under alternative bonding policies.

The minimum bonding requirements mandate that each bidder provide a bid guarantee equivalent to five percent of the bid price in the form of a firm commitment such as a bid bond, certified check, or other negotiable instrument. Additionally, the contractor must furnish a performance bond for 100 percent of the contract price to ensure fulfillment of all contractual obligations and a payment bond for 100 percent of the contract price to assure payment to all labor and material suppliers. These bonding requirements are established under federal regulations governing grants and cooperative agreements to state, local, and federally recognized Indian tribal governments and represent mandatory compliance obligations for all participating contractors on this federally funded disaster recovery project.

View the file

Other files

File Type Posted
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction_(Addendum_#6_Revision).pdf PDF
EXHIBIT_Q_-_City_Utilities_Asbuilt_Map.pdf PDF
EXHIBIT_P_-_TOPOGRAPHIC_SURVEY.pdf PDF
Exhibit_F_-_Bid_Price_Sheet_REVISION_1.xlsx XLSX spreadsheet
Exhibit_D_-_Plans_REVISION_1.pdf PDF
Exhibit_E_-_Technical_Specifications_-REVISION_2.pdf PDF
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_E_-_Technical_Specifications_-REVISION_1.pdf PDF
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction.pdf PDF
Exhibit_A_-_Required_Types_and_Limits_of_Insurance.pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination_(3).pdf PDF
Exhibit_G_-_Project_Sign_(6).pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025_(3).pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025_(3).pdf PDF
Exhibit_D_-_Plans.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_H_-_Supplemental_Conditions_(4).pdf PDF
Exhibit_K_-_MWBE_Information_and_Form_(3).pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms_(3).pdf PDF
Exhibit_O_-_Geosyntec_Lantern_Park_Design_Drainage_Report_2026-06-12_S&S.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Exhibit_C_-_Draft_Contract_26-B-119KW.pdf PDF
Exhibit_H_-_Supplemental_Conditions.pdf PDF
Fillable_Cost_Estimate.xlsx XLSX spreadsheet
Geosyntec_Lantern_Park_Final_2026-06-12_S&S.pdf PDF
Lantern_Park_Stomrwater_Improvements_Project_Description.docx DOCX document
1-PRIME-SUB_Form_-_Lantern_Park.xls XLS spreadsheet
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_K_-_MWBE_Information_and_Form.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Geosyntec_Lantern_Park_Design_Drainage_Report_2026-06-12_S&S.pdf PDF
Geosyntec_Lantern_Park_Pond_Tech_Specs_2026-06-12.pdf PDF
Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_G_-_Project_Sign.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
GEOSYNTEC_LANTERN_PARK_POST_DESIGN_SCOPE_2026-06-12.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 CFR PART 85.36 Administrative Requirements for Grants and Cooperative Agreements to State, Local and Federally Recognized Indian Tribal Governments

Compliance with the following bonding requirements is mandatory.

Proof of bonding will be verified prior to issuance of the notice to proceed.

(h) Bonding requirements.

For construction or facility improvement contracts or subcontracts exceeding the simplified acquisition threshold, the awarding agency may accept the bonding policy and requirements of the grantee or sub grantee provided the awarding agency has made a determination that the awarding agency's interest is adequately protected. If such a determination has not been made, the minimum requirements shall be as follows:

(1) A bid guarantee from each bidder equivalent to five percent of the bid price. The bid guarantee shall consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified.

(2) A performance bond on the part of the contractor for 100 percent of the contract price. A performance bond is one executed in connection with a contract to secure fulfillment of all the contractor's obligations under such contract.

(3) A payment bond on the part of the contractor for 100 percent of the contract price. A payment bond is one executed in connection with a contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract.

EXHIBIT M

https://www.hud.gov/sites/documents/24CFR85-36PROC.PDF

File details come from the government source that posted it. Updated .