Exhibit_F_-_Bid_Price_Sheet.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- 26-B-119KW
- Issued by
- Volusia County, Florida
About this file
Exhibit F - Bid Price Sheet Summary
This is a Bid Price Sheet for Volusia County, Florida's CDBG-DR Lantern Park Stormwater Pond Construction project (Contract 26-B-119KW). The project encompasses two primary scopes of work: Stormwater Pond and Pump Station Improvements, and Lantern Park Subdivision Drainage Improvements. The stormwater pond improvements include 22 line items covering mobilization, maintenance of traffic, erosion control, clearing and grubbing, regular excavation (48,000 cubic yards), concrete elliptical pipe culvert installation (65 linear feet), flap gates, riprap, fencing (1,250 linear feet), performance turf, a portable emergency generator, utility pipe installation (1,500 linear feet of high-density polyethylene), and comprehensive pump station components including mechanical, electrical, and control systems. The drainage improvements section includes additional line items for mobilization, traffic maintenance, erosion control, clearing and grubbing, stabilization, optional base, asphaltic concrete, and curb inlet work.
The bid price sheet presents all unit costs and total costs as $0, indicating this is a blank template document for bidders to complete with their pricing. All items are structured with defined quantities and unit measurements (lump sum, cubic yards, linear feet, tons, and each) to enable standardized bidding across proposing contractors. The project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR) to support Volusia County's recovery from Hurricane Ian damage sustained in September 2022.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| EXHIBIT F - BID PRICE SHEET 26-B-119KW |
| CDBG-DR LANTERN PARK STORMWWATER POND CONSTRUCTION |
Company Name
| Item | Pay Item No. | Description | Units | Unit Cost | Quantity | Total | |
| Stormwater Pond and Pump Station Improvements | |||||||
| 1 | 101-1 | Mobilization (10% of Total) | LS | 1 | $0 | ||
| 2 | 102-1 | Maintenance of Traffic (5% of Total) | LS | 1 | $0 | ||
| 3 | 104-1 | Prevention, Control and Abatement of Erosion and Water Pollution (5% of Total) | LS | 1 | $0 | ||
| 4 | 110-1-1 | Clearing and Grubbing (10% of Total) | LS | 1 | $0 | ||
| 5 | 120-1 | Regular Excavation | CY | 48000 | $0 | ||
| 6 | 430-175-266 | Pipe Culvert, Concrete, Elliptical, 66" S/CD | LF | 65 | $0 | ||
| 7 | 430-880 | Flap Gates, 0-24'' | EA | 1 | $0 | ||
| 8 | 430-982-644 | Mitered End Section, Elliptical, 66" CD | EA | 1 | $0 | ||
| 9 | 530-3-4 | Riprap, Rubble, F&I, Ditch Lining | TN | 85 | $0 | ||
| 10 | 550-10-220 | Fencing, Type B, 5.1-6.0', Standard | LF | 1250 | $0 | ||
| 11 | 550-60-222 | Fence Gate, Type B, Double, 6.1-12.0' Opening | EA | 1 | $0 | ||
| 12 | 570-1-2 | Performance Turf, Sod | LS | 1 | $0 | ||
| 13 | 639-4-4 | Emergency Generator - Portable Install - Non | |||||
| retrofit; FDOT Furnished | EA | 1 | $0 | ||||
| 14 | 1050-42-218 | Utility Pipe - High Density Polyethylene, Furnish | |||||
| & Install, Water/Sewer, 18" | LF | 1500 | $0 | ||||
| 15 | 1055-13 | Utility Fittings, Install | LS | 1 | $0 | ||
| 16 | 1080-21-118 | Utility Fixture - Valve/Meter Box, Furnish & | |||||
| Install, 18" | EA | 1 | $0 | ||||
| 17 | 900-1 | Stormwater Pump Station | LS | 1 | $0 | ||
| 18 | 900-2 | Junction Box | LS | 1 | $0 | ||
| 19 | 900-3 | Mechanical (including startup) | LS | 1 | $0 | ||
| 20 | 900-4 | Electrical (including purchase and startup of | |||||
| control and power panels, remote monitoring, and related items) | LS | 1 | $0 | ||||
| 21 | 900-5 | Misc. Utility Coordination | LS | 1 | $0 | ||
| 22 | 900-6 | Driveway Access | LS | 1 | $0 | ||
| Lantern Park Subdivision Drainage Improvements | |||||||
| 23 | 101-1 | Mobilization (15% of Total) | LS | 1 | $0 | ||
| 24 | 102-1 | Maintenance of Traffic (5% of Total) | LS | 1 | $0 | ||
| 25 | 104-1 | Prevention, Control and Abatement of Erosion and Water Pollution (5% of Total) | LS | 1 | $0 | ||
| 26 | 110-1-1 | Clearing and Grubbing (10% of Total) | LS | 1 | $0 | ||
| 27 | 160-4 | Type B Stabilization (12") | SY | 40 | $0 | ||
| 28 | 285-704 | Optional Base, Base Group 04 (6") | SY | 40 | $0 | ||
| 29 | 334-1-13 | Superpave Asphaltic Concrete, Traffic C (2") | TN | 5 | $0 | ||
| 30 | 425-1-441 | Inlet, Curb, Type J-4, <10' | EA | 5 | $0 | ||
| 31 | 425-11 | Modify Existing Drainage Structure | EA | 4 | $0 | ||
| 32 | 430-175-224 | Pipe Culvert, Concrete, Elliptical, 24" S/CD | LF | 105 | $0 | ||
| 33 | 430-175-230 | Pipe Culvert, Concrete, Elliptical, 30" S/CD | LF | 140 | $0 | ||
| 34 | 430-175-236 | Pipe Culvert, Concrete, Elliptical, 36" S/CD | LF | 225 | $0 | ||
| 35 | 522-1 | Concrete Sidewalk and Driveways, 4" Thick | SY | 20 | $0 | ||
| 36 | 570-1-2 | Performance Turf, Sod | LS | 1 | $0 |
| 37 | 900-7 | Civil Allowance* | $50,000 |
| 38 | 900-8 | Utility allowance* | $50,000 |
| Total Base Bid: | $100,000 |
| Performance and Payment Bonds | |
| Total Bid (Base Bid + Performance and Payment Bonds) | $100,000 |
*Allowance of $100,000 is included in the project budget to address unforeseen conditions encountered during construction . This allowance shall not be included by the Contractor in the lump sum bid price. Payment for allowances will be made based on the actual price for required services. Allowance requests must be submitting in writing and pre-approved by the County Project Manager and the EOR prior to completing services and submitting for payment.