Exhibit_F_-_Bid_Price_Sheet_REVISION_1.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
CDBG-DR Lantern Park Stormwater Pond Construction
Solicitation number
26-B-119KW
Issued by
Volusia County, Florida

About this file

This is a Bid Price Sheet (Exhibit F, Revision 1) for Volusia County's Office of Recovery and Resiliency in Florida for IFB 26-B-119KW, a CDBG-DR funded stormwater construction project at Lantern Park. The project encompasses two primary components: Stormwater Pond and Pump Station Improvements and Lantern Park Subdivision Drainage Improvements. Major work items include clearing and grubbing, regular excavation of approximately 48,000 cubic yards, installation of a 66-inch elliptical concrete pipe culvert system with flap gates, riprap ditch lining of 85 tons, approximately 1,250 linear feet of Type B fencing with one double gate, performance turf sod installation, a portable emergency generator, approximately 1,500 linear feet of 18-inch high-density polyethylene utility piping with fittings and valve/meter boxes, a complete stormwater pump station with junction boxes, mechanical systems including startup, electrical systems with control and power panels and remote monitoring, utility coordination, driveway access, and subdivision drainage improvements including stabilization, base courses, asphaltic concrete, and curb inlets. The non-mandatory pre-bid meeting was scheduled for August 27, 2026 at 10:00 a.m. in DeLand, Florida, with questions due by September 3, 2026 at 11:59 p.m. and bids due September 17, 2026 at 3:00 p.m. via Microsoft Teams through the County's eProcurement Portal. The contract term requires substantial completion within 360 days of Notice to Proceed and final completion within 390 days total, with liquidated damages assessed at $1,200 per day for delays beyond the completion date, and bids must remain firm for 120 days following opening.

The price sheet contains all unit costs listed at $0, indicating this is a blank template for bidders to complete with their pricing. The estimated construction cost for the project is $3.917 million, funded entirely by a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery (CDBG-DR) in support of recovery efforts from Hurricane Ian damage in September 2022. Bid requirements include a bid bond equal to 5 percent of the bid price, a performance bond for 100 percent of contract price, and a payment bond for 100 percent of contract price. Contractors must comply with Davis-Bacon Act prevailing wage determinations with 34 classifications ranging from $8.44 to $31.50 per hour base wage plus fringe benefits, and must submit weekly certified payroll on WH-347 forms. Section 3 requirements mandate that at least 25 percent of total labor hours be performed by Section 3 workers and at least 5 percent by Targeted Section 3 workers. Contractors must demonstrate affirmative action in utilizing minority and women-owned business enterprises as suppliers and subcontractors. Insurance requirements include commercial general liability ($1 million per occurrence / $2 million aggregate), auto liability ($1 million combined single limit), excess liability ($1 million per occurrence/aggregate), contractors pollution liability ($1 million occurrence/aggregate), and installation floater covering wind, hail, named storms, and flood including storm surge. The County will remit payment within 20 to 25 days in accordance with Florida Statutes 218.735, retaining 5 percent of each monthly payment request.

View the file

Other files

File Type Posted
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction_(Addendum_#6_Revision).pdf PDF
EXHIBIT_Q_-_City_Utilities_Asbuilt_Map.pdf PDF
EXHIBIT_P_-_TOPOGRAPHIC_SURVEY.pdf PDF
Exhibit_E_-_Technical_Specifications_-REVISION_2.pdf PDF
Exhibit_D_-_Plans_REVISION_1.pdf PDF
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_E_-_Technical_Specifications_-REVISION_1.pdf PDF
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction.pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_A_-_Required_Types_and_Limits_of_Insurance.pdf PDF
Exhibit_N_-_HEAVY_Wage_Determination_(3).pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025_(3).pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025_(3).pdf PDF
Exhibit_H_-_Supplemental_Conditions_(4).pdf PDF
Exhibit_G_-_Project_Sign_(6).pdf PDF
Exhibit_O_-_Geosyntec_Lantern_Park_Design_Drainage_Report_2026-06-12_S&S.pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_D_-_Plans.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36_(4).pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms_(3).pdf PDF
Exhibit_K_-_MWBE_Information_and_Form_(3).pdf PDF
Exhibit_C_-_Draft_Contract_26-B-119KW.pdf PDF
Exhibit_B_-_Prime_Sub_Form.xls XLS spreadsheet
Geosyntec_Lantern_Park_Final_2026-06-12_S&S.pdf PDF
Geosyntec_Lantern_Park_Design_Drainage_Report_2026-06-12_S&S.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Geosyntec_Lantern_Park_Pond_Tech_Specs_2026-06-12.pdf PDF
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
GEOSYNTEC_LANTERN_PARK_POST_DESIGN_SCOPE_2026-06-12.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_G_-_Project_Sign.pdf PDF
Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_K_-_MWBE_Information_and_Form.pdf PDF
Lantern_Park_Stomrwater_Improvements_Project_Description.docx DOCX document
Fillable_Cost_Estimate.xlsx XLSX spreadsheet
1-PRIME-SUB_Form_-_Lantern_Park.xls XLS spreadsheet
Exhibit_H_-_Supplemental_Conditions.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

EXHIBIT F - BID PRICE SHEET 26-B-119KW
CDBG-DR LANTERN PARK STORMWWATER POND CONSTRUCTION

Company Name

ItemPay Item No.DescriptionUnitsUnit CostQuantityTotal
Stormwater Pond and Pump Station Improvements
1101-1Mobilization (10% of Total)LS1$0
2102-1Maintenance of Traffic (5% of Total)LS1$0
3104-1Prevention, Control and Abatement of Erosion and Water Pollution (5% of Total)LS1$0
4110-1-1Clearing and Grubbing (10% of Total)LS1$0
5120-1Regular ExcavationCY48000$0
6430-175-266Pipe Culvert, Concrete, Elliptical, 66" S/CDLF65$0
7430-880Flap Gates, 0-24''EA1$0
8430-982-644Mitered End Section, Elliptical, 66" CDEA1$0
9530-3-4Riprap, Rubble, F&I, Ditch LiningTN85$0
10550-10-220Fencing, Type B, 5.1-6.0', StandardLF1250$0
11550-60-222Fence Gate, Type B, Double, 6.1-12.0' OpeningEA1$0
12570-1-2Performance Turf, SodLS1$0
13639-4-4Emergency Generator - Portable Install - Non
retrofit; FDOT FurnishedEA1$0
141050-42-218Utility Pipe - High Density Polyethylene, Furnish
& Install, Water/Sewer, 18"LF1500$0
151055-13Utility Fittings, InstallLS1$0
161080-21-118Utility Fixture - Valve/Meter Box, Furnish &
Install, 18"EA1$0
17900-1Stormwater Pump StationLS1$0
18900-2Junction BoxLS1$0
19900-3Mechanical (including startup)LS1$0
20900-4Electrical (including purchase and startup of
control and power panels, remote monitoring, and related items)LS1$0
21900-5Misc. Utility CoordinationLS1$0
22900-6Driveway AccessLS1$0
Lantern Park Subdivision Drainage Improvements
23101-1Mobilization (15% of Total)LS1$0
24102-1Maintenance of Traffic (5% of Total)LS1$0
25104-1Prevention, Control and Abatement of Erosion and Water Pollution (5% of Total)LS1$0
26110-1-1Clearing and Grubbing (10% of Total)LS1$0
27160-4Type B Stabilization (12")SY40$0
28285-704Optional Base, Base Group 04 (6")SY40$0
29334-1-13Superpave Asphaltic Concrete, Traffic C (2")TN5$0
30425-1-441Inlet, Curb, Type J-4, <10'EA5$0
31425-11Modify Existing Drainage StructureEA3$0
32430-175-224Pipe Culvert, Concrete, Elliptical, 24" S/CDLF105$0
33430-175-230Pipe Culvert, Concrete, Elliptical, 30" S/CDLF140$0
34430-175-236Pipe Culvert, Concrete, Elliptical, 36" S/CDLF225$0
35522-1Concrete Sidewalk and Driveways, 4" ThickSY20$0
36570-1-2Performance Turf, SodLS1$0
37900-7Civil Allowance*$50,000
38900-8Utility allowance*$50,000
Total Base Bid:$100,000
Performance and Payment Bonds
Total Bid (Base Bid + Performance and Payment Bonds)$100,000

*Allowance of $100,000 is included in the project budget to address unforeseen conditions encountered during construction . This allowance shall not be included by the Contractor in the lump sum bid price. Payment for allowances will be made based on the actual price for required services. Allowance requests must be submitting in writing and pre-approved by the County Project Manager and the EOR prior to completing services and submitting for payment.

File details come from the government source that posted it. Updated .