Exhibit_B_-_Prime_Sub_Form.xls

XLS spreadsheet 49 KB Posted

Attached to
CDBG-DR Lantern Park Stormwater Pond Construction
Solicitation number
26-B-119KW
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida's CDBG-DR Lantern Park Stormwater Pond Construction project, related to Contract No. C2092 and ITB No. 26-B-119KW. The form requires bidders to list all proposed subcontractors and specify the scope of work and dollar values for each contractor performing on the project. Bidders must complete all green-shaded cells indicating dollar values and work percentages for the prime contractor and each subcontractor, with the total percentages equaling 100 percent. Anticipated subcontractor disciplines for this project include landscaping, paving, masonry, heavy equipment operation, plumbing, and electrical work, with additional blank rows available for other required disciplines not listed.

The form establishes that the prime contractor is responsible for ensuring all subcontractors hold appropriate licenses and that any subcontractor changes during project completion require prior written approval from the County Project Manager. The total bid price submitted on this form must match the total bid price listed on Exhibit F—Bid Price Sheet and is inclusive of any performance or payment bonds. The form will also be used to determine local preference eligibility in accordance with Section 2.8, D of the solicitation. Failure to complete and return this form may result in a non-responsive bid, and the County reserves the right to seek clarification on subcontractors but will not permit changes to the total submitted base bid pricing.

View the file

Other files

File Type Posted
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction_(Addendum_#6_Revision).pdf PDF
EXHIBIT_Q_-_City_Utilities_Asbuilt_Map.pdf PDF
EXHIBIT_P_-_TOPOGRAPHIC_SURVEY.pdf PDF
Exhibit_F_-_Bid_Price_Sheet_REVISION_1.xlsx XLSX spreadsheet
Exhibit_D_-_Plans_REVISION_1.pdf PDF
Exhibit_E_-_Technical_Specifications_-REVISION_2.pdf PDF
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction_(Addendum_#2_Revision).pdf PDF
Exhibit_E_-_Technical_Specifications_-REVISION_1.pdf PDF
CDBG-DR_Lantern_Park_Stormwater_Pond_Construction.pdf PDF
Exhibit_A_-_Required_Types_and_Limits_of_Insurance.pdf PDF
Exhibit_F_-_Bid_Price_Sheet.xlsx XLSX spreadsheet
Exhibit_N_-_HEAVY_Wage_Determination_(3).pdf PDF
Exhibit_G_-_Project_Sign_(6).pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025_(3).pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025_(3).pdf PDF
Exhibit_D_-_Plans.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36_(4).pdf PDF
Exhibit_E_-_Technical_Specifications.pdf PDF
Exhibit_H_-_Supplemental_Conditions_(4).pdf PDF
Exhibit_K_-_MWBE_Information_and_Form_(3).pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms_(3).pdf PDF
Exhibit_O_-_Geosyntec_Lantern_Park_Design_Drainage_Report_2026-06-12_S&S.pdf PDF
Exhibit_C_-_Draft_Contract_26-B-119KW.pdf PDF
Exhibit_H_-_Supplemental_Conditions.pdf PDF
Fillable_Cost_Estimate.xlsx XLSX spreadsheet
Geosyntec_Lantern_Park_Final_2026-06-12_S&S.pdf PDF
Lantern_Park_Stomrwater_Improvements_Project_Description.docx DOCX document
1-PRIME-SUB_Form_-_Lantern_Park.xls XLS spreadsheet
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_K_-_MWBE_Information_and_Form.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Geosyntec_Lantern_Park_Design_Drainage_Report_2026-06-12_S&S.pdf PDF
Geosyntec_Lantern_Park_Pond_Tech_Specs_2026-06-12.pdf PDF
Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_G_-_Project_Sign.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
GEOSYNTEC_LANTERN_PARK_POST_DESIGN_SCOPE_2026-06-12.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C2092ITB No. 26-B-119KW
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BIDThis number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Exhibit F - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
0.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Landscaping110.00%
Paving$ - 00.00%
Mason$ - 00.00%
Heavy Equipment Operation$ - 00.00%
Plumbing$ - 00.00%
Electrician$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .