Exhibit_B_-_Prime_Sub_Form.xls
XLS spreadsheet 49 KB Posted
- Solicitation number
- 26-B-119KW
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for Volusia County, Florida's CDBG-DR Lantern Park Stormwater Pond Construction project, related to Contract No. C2092 and ITB No. 26-B-119KW. The form requires bidders to list all proposed subcontractors and specify the scope of work and dollar values for each contractor performing on the project. Bidders must complete all green-shaded cells indicating dollar values and work percentages for the prime contractor and each subcontractor, with the total percentages equaling 100 percent. Anticipated subcontractor disciplines for this project include landscaping, paving, masonry, heavy equipment operation, plumbing, and electrical work, with additional blank rows available for other required disciplines not listed.
The form establishes that the prime contractor is responsible for ensuring all subcontractors hold appropriate licenses and that any subcontractor changes during project completion require prior written approval from the County Project Manager. The total bid price submitted on this form must match the total bid price listed on Exhibit F—Bid Price Sheet and is inclusive of any performance or payment bonds. The form will also be used to determine local preference eligibility in accordance with Section 2.8, D of the solicitation. Failure to complete and return this form may result in a non-responsive bid, and the County reserves the right to seek clarification on subcontractors but will not permit changes to the total submitted base bid pricing.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C2092 | ITB No. 26-B-119KW | |||
| PRIME/SUBCONTRACTOR FORM | ||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | ||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | ||||
| TOTAL BID | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit F - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| 0.00% | |||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Landscaping | 11 | 0.00% | |
| Paving | $ - 0 | 0.00% | |
| Mason | $ - 0 | 0.00% | |
| Heavy Equipment Operation | $ - 0 | 0.00% | |
| Plumbing | $ - 0 | 0.00% | |
| Electrician | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |