Exhibit K - MOW MOS Operating Rules.pdf
PDF 15 MB Posted
- Solicitation number
- RFP-10060
- Issued by
- Volusia County, Florida
About this file
This document is an exhibit titled "MOW MOS Operating Rules" related to the Central Florida Rail Corridor (CFRC) Track Improvements - Multiple Locations contract opportunity issued by the Florida Department of Transportation (FDOT) District Five. The contract involves track improvements at multiple locations along the CFRC. A mandatory pre-proposal meeting will be held on September 4, 2024, at 10:00 AM, and technical and price proposals are due by October 2, 2024, at 10:00 AM. The contract will be awarded after the proposal due date, and the term of the contract is not specified.
The document does not provide details on pricing, set-asides, incumbents, funding sources, or other salient financial information. It focuses on outlining the operating rules for maintenance of way (MOW) and maintenance of signal (MOS) activities along the CFRC. The document contains legal language, contract clauses, and other non-essential information that is not summarized here.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Florida Department of Transportation
Exhibit “K”
MOW Operating Rules and Instructions
Central Florida Rail Corridor (CFRC) Track Improvements
– Multiple Locations
Financial Projects Number(s): 412994-4-52-33, 412994-8- 82-54, 412994-8-82-55, 412994-8-82-56, 412994-8-82-47
DOT-RFP-25-5002-TIML
06/03/2023 Initial Document
[Diagram A.]
[Diagram B.]
Once the Train Reaches the Restricted Area. The speed specified by track warrant, track bulletin, general order, or radio speed restriction must not be exceeded until the rear of the train clears the restricted area.
When a yellow flag is displayed and no restriction is in effect as specified by a mandatory directive, once the train is 2 miles beyond the yellow flag, crew members must:
1. Continue moving the train not exceeding 10 MPH.
2. Resume speed only after:
a. The crew has received a mandatory directive associated with the yellow flag.
b. The rear of the train has passed a green flag. or
c. The rear of the train has traveled 4 miles beyond the yellow flag and the train dispatcher has verified that no mandatory directive specifying a temporary speed restriction is in effect.
[Diagram A.]
2. A derail capable of restricting access to the track where work will occur must be locked in derailing position with an effective locking device and positioned at least:
A blue signal must be displayed at each derail.
[Diagram B.]
-1
[Diagram C.]
[Diagram D.]
A utility employee is released from a train or yard crew when:
The utility employee notifies the designated crew member that the work is completed.
The designated crew member notifies each crew member that the utility employee is being released.
1.
2.
3.
4.
5.
File details come from the government source that posted it. Updated .