Exhibit II Task Order Scope of Work Request Example_WSB Ver II.pdf

PDF 321 KB Posted

Attached to
Master Agreement AZ|CTR052953
Contract number
CTR052953
Issued by
Arizona

About this file

This document is a Task Order Scope of Work Request (TOSOWR) from the Arizona Department of Public Safety's Wireless Systems Bureau (WSB). The document is an exhibit (Exhibit II) that serves as a template for task order requests under a state contract, involving an unspecified contractor who will provide services related to wireless systems or tower-related work.

The document outlines reimbursement terms and conditions for task order work, including specific rates for travel mileage ($0.445 per mile), lodging ($91 per night), and meal expenses ($41). The task order requires contractors to submit detailed proposals specifying total hours, hourly rates, a comprehensive work plan, schedule, and list of key personnel. No work can commence without a direct release purchase order, and contractors must bear all costs associated with responding to individual task orders. The targeted start date for this particular task order is 5/1/2020, with a required response date of 4/23/2020, and the specific task order number is TOSOWR# 18018.

View the file

Other files

File Type Posted
1-Attachment 1 Offer and Acceptance Form Signed.pdf PDF
1-Attachment 3-B Key Personnel Proposal.pdf PDF
1-Attachment 3-D Performance Guarantee.pdf PDF
CTR052953_Amendment_02_Travel_10-22.pdf PDF
Enertech_Certificate_of_Insurance_Valid_Thru_2-28-21.pdf PDF
Part 3A Special Terms and Conditions Tower Services.pdf PDF
Part_2_Technical_and_Commerical_Tower_Services_Revision_10-22.pdf PDF
Part_3A_Special_Terms_and_Conditions_Tower_Services_Revised_10-22.pdf PDF
1-Attachment 3-C Proposed Subcontractors.pdf PDF
1-Attachment 5-C Insurance and Bonding Evidence.pdf PDF
1-Attachment 6 Boycott of Israel Disclosure.pdf PDF
Award Letter Enertech for Maintenance and Repair Portion of Tower Services Solicitation.docx DOCX document
CTR052953_COI_Valid_Thru_2-28-23.pdf PDF
Clarification Letter Enertech 11-3.docx DOCX document
Clarification Response Enertech 10-30.pdf PDF
Enertech Pricing.pdf PDF
Evaluation Tool-Tower Services---Maintenance 12-7.xls XLS spreadsheet
Tower Services Executive Summary Mainteance and Repair.pdf PDF
Tower Services NDA's.pdf PDF
1-Attachment 3-A Method Proposal.pdf PDF
1-Attachment 5-A Confidential Information Designation.pdf PDF
1-Attachment 5-B Conformance Statements.pdf PDF
1-Combined RFP Proposal Attachment File.pdf PDF
BPM002972 Solictation Documents.zip ZIP file
CTR052953 Signed Offer and Acceptance Maintenance Enertech.pdf PDF
CTR052953_Amendment_03_Contract_Extension_to_12-8-23.pdf PDF
CTR052953_Amendment_05_Contract_Extension_to_12-8-25.pdf PDF
Clarification Response Enertech 11-3.pdf PDF
Exhibit I WSB State Owned Telecommunications Sites.pdf PDF
Listing of Suppliers from APP.docx DOCX document
Part 1 Tower Services Instructions and Attatchments Ver IV- MG.pdf PDF
Part 3B UniformTerms Conditions Tower Services.pdf PDF
1-Attachment 2-A Experience and Capacity Questionnaire.pdf PDF
1-Attachment 2-B Organization Profile.pdf PDF
1-Attachment 5-D Offer Checklist.pdf PDF
CTR052953_Amendment_04_Contract_Extension_to_12-8-24.pdf PDF
CTR052953_Amendment_06_Contract_Extension_to_4-8-26.pdf PDF
CTR052953_Enertech_Determination_for_Electrical_Repair_Manualito_NM_June_2022.pdf PDF
Clarification Letter Enertech 10-30.docx DOCX document
Enertech Resources Proposal.zip ZIP file
Exhibit III_Change Order_WSB Ver II.pdf PDF
Part 2 Technical and Commerical Tower Services.pdf PDF
Tower Service Legal Add.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit II

Customer Name Wireless Systems Bureau Contractor Name

Requested By Project Manager

Jobsite Location: Contract Number

Jobsite Conditions: Task Order Number TOSOWR# 18018

Targeted Start Date 5/1/2020 Required Response Date: 4/23/2020

Type of services (i.e. Scope of Work) to be performed at the jobsite

Site Map Link:

Quantity of personnel to be assigned

Labor and Travel Hours - per person

Total Project Labor and Travel Hours

Contracted Hourly Rate (Shall be a firm fixed hourly rate per one-site contract personnel providing

Task Order services. Defined in State Contract)

Total Labor Cost

(Total Project Hours multiplied by Contracted Hourly Rate and qty of personnel)

Estimated Project Duration (days)

Number of Vehicles Required

Special Equipment Fee (Snow Cat vehicles, tractors, cranes, forklifts, other equipment rentals as required)

Section 4, Fixed Rate Reimbursement Schedule

Exhibit II

Travel Mileage (Mileage distance from DPS headquarters to individual tower jobsite locations and back to DPS headquarters shall be reimbursed at the state of AZ max allowable rate per mile (currently 44.5 cents per mile)

Travel Mileage Reimbursement (*per vehicle) $0.445

Lodging rate relative to jobsite location (reference SAAM Topic 50, Section 95; All lodging incurred by on-site Contract personnel shall be reimbursed at current state of Arizona rates) $91

Meal Reimbursement rate (reference SAAM Topic 50, Section 95; All meals incurred by on-site

Contract personnel shall be reimbursed at current state of Arizona rates Days of Departure and Return for Travel Involving an Overnight Stay equal seventy-five percent (75%) of the Full-Day

Meal and Incidental Expense Reimbursement Limits for that night’s destination )

$41

TOSOWR TOTAL

All WSB equipment, components, tower related materials, parts and supplies to be provided

TERMS FOR THIS TASK ORDER REQUEST

No work under a DPS Task Order shall be started without the issuance of a duly authorized DPS direct release purchase order.

Upon receipt of individual TOSOWR’s, Contractor(s) shall submit a task order offer on or before the date specified on TOSOWR. Offered pricing under a task order offer shall be all inclusive for completion of the task order. Task order offers shall also, at a minimum:

1. Specify the total number of hours times the hourly rate specified on the price sheet to complete the task order’s Scope of Wo rk;

2. Provide a detailed plan and schedule to complete the task order’s Scope of Work; and

3. Contain a list of Key personnel, tower rigging personnel and or ground support personnel and any related resources to be utilized during performance of the Scope of Work.

4. All cost associated with responding to individual task order offers shall be borne by the Contractor(s).

DPS/WSB Manager or Authorization Designee Contractor Job Authorization Designee

Authorized Signature Authorized Signature

Printed Name and Badge No. Printed Name and Title

File details come from the government source that posted it. Updated .