Exhibit II Schedule of Items.pdf
PDF 726 KB Posted
- Attached to
- 127EAX24R0021 – Dry Blue Creek UTV Trail
- Solicitation number
- 127EAX24R0021
About this file
This document is a Schedule of Items for the Dry Blue OHV Trail Improvements project in the Gila National Forest, New Mexico. It provides a detailed breakdown of the construction and restoration work required, including mobilization, new trail construction, excavation, existing trail restoration, clearing and grubbing, low-water crossings, and seeding.
The related federal contract opportunity, solicitation number 127EAX24R0021, is for a Firm Fixed-Price Contract using a Best Value-Tradeoffs source selection process. The work is valued between $100,000 to $250,000 and is a 100% Small Business Set-Aside. A site visit is scheduled for July 16, 2024, and the deadline for responses is July 31, 2024 at 1:00 PM MDT. Award will be made to the offer that meets or exceeds the requirements, and the Price reasonableness will be determined through the competitive solicitation process. Davis-Bacon wages apply, and payment bonds are required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
UNIT
SOL #
ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
90701 MOBILIZATION LS 1
91101 CONSTRUCTION OF NEW TRAIL LF 3025
91103 EXCAVATION CY 100
91106 EXISTING TRAIL RESTORATION LF 3200
91202 CLEARING & GRUBBING LF 3000
91701 FORD, TYPE LOW WATER CROSSING EACH 4
91702 FORD MAINTENANCE LS 1
98101 SEEDING AC 0.75
TOTAL
NOTES
Signature
Vendor
Address
SCHEDULE OF ITEMS
SECTION B
Construction & Price/Cost Dry Blue OHV Trail Improvements Gila National Forest
1. Responses for quantities less than those listed in the numbered items may be rejected
2. Responses without prices for each item and sub-item may be rejected.
3. If award response is made in excess of $35,000, bonds will be required (Section I)
4. If response is greater than $150,000, include bid bond = 20% of the total price
5. Following are abbreviation definitions from FP-14, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC =Acre, CQ =Contract Quantity, CY = Cubic Yard, EA =Each, GAL =Gallon, HR =Hour, LF =Linear Foot, LS =Lump Sum, MI =Mile, LB =Pound, SF =Square Foot, SY =Square yard, ST =Station, TON =Ton. All Units will be measured as Actual Quantity unless denoted by an asterisk (*) and paid according to FAR clause 52.211-18, Variation in Estimated Quantity. If denoted by an asterisk, the quantity is measured as CQ in accordance with FP-14.
6. Roads and road access may be difficult and/or impassable due to weather and lapse in maintenance. Road repairs may be needed for access to project site and costs and work associated with access road shall be incidental and included in bid proposal