127EAX24R0021 Amendment I Extension_ Sign in sheet_ RFI responses.pdf
PDF 311 KB Posted
- Attached to
- 127EAX24R0021 – Dry Blue Creek UTV Trail
- Solicitation number
- 127EAX24R0021
About this file
This document is an amendment to a federal solicitation for the Dry Blue Creek UTV Trail Construction project. The amendment extends the deadline for responses to August 7, 2024, provides a site visit sign-in sheet, and posts responses to submitted RFIs.
The solicitation is for a firm-fixed price contract to restore and construct the Dry Blue UTV Trail 61 on the Quemado Ranger District of the Gila National Forest in New Mexico. The work includes rerouting trail sections, stabilizing and hardening low-water crossings, and revegetating disturbed areas. The government anticipates awarding the contract using a best value trade-off process, with the technical factors being more important than price. A site visit was held on July 16, 2024, and contractors were required to bring a UTV or ATV for access. The project is estimated to be between $100,000 to $250,000 and is a 100% small business set-aside. Davis-Bacon wages apply. Offers are due by July 31, 2024 at 1:00 PM MDT.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
127EAX24R0021
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ALBUQUERQUE NM 87102
333 BROADWAY SE
SOUTHWESTERN REGION
113019506/18/2024
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/18/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment I is being put into place to:
1. Extend the Deadline to August 7, 2024 @ 1:00pm MT
2. Post site visit sign-in sheet Page 3
3. Post RFI responses Page 3 & 4
All Other Terms and Conditions Remain The Same
Delivery: 10/01/2024
Delivery Location Code: 8377
USDA FS
QUEMADO RANGER DIST
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
127EAX24R0021
PO BOX 159
QUEMADO NM 87829 US
FOB: Destination
Period of Performance: 09/01/2024 to 09/01/2025
0001 0306 Q4 CON POW WFRPR Dry Blue Creek AOP NEW OUT
- UTV Trail Construction
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
127EAX24R0021 Dry Blue Creek UTV Trail Construction
Questions and Sign-In Sheet from Pre-Bid Meeting (7/16/2024)
Name Company Contact Information Mike Lane Frontier Development Inc. mlane@frontierdevelopmentinc.com
352-425-3574
Wayne Reidhead Alpine Excavation LLC alpineexcavation@yahoo.com 928-245-2761
George Geisler Geisler Skidding ggeisler@frontiernet.net 928-245-3167
James Vigil CBKU Dirtworks james@cbkudirtworks.com Josh Adams Westfork Companies Jnadams80@gmail.com
480-540-8124 Greg Church DRC Gwtransport91@gmail.com
575-544-1867 Omar Salmeron Globe Builders 3009 Pesing Dr., El Paso TX
Questions and Answers:
1. Where do we source rock?
a. Rock must be sourced from an offsite location, to be determined by contractor.
2. Do the trail re-routes and hardened approaches need to be surveyed in or use best judgement for location?
a. Project can be implemented without a full survey but should be completed by flagging out alignments and crossings with a GIS track at a minimum. Critical locations for following coordinates closely are the crossings. Both the re-routes and crossings include coordinates which can be found in the design plans.
3. Do we need to seed the center of the new 2-track trail?
a. No, new center-line should re-vegetate over time. Seeding should be reserved for disturbance sites and for abandoned trail restoration.
4. Can we get a clarification on the timeline for work?
a. Implementation will be approved for 120 days, starting October 1 and not to exceed past February 28th.
5. Can we seed after the contract timeframe, so the seeds take in a more appropriate season/time of year?
a. Yes, if the contracting officer is notified that this is the preference so a stop order can be placed and re-initiated when the timeline for seeding work would be preferred.
mailto:mlane@frontierdevelopmentinc.com mailto:alpineexcavation@yahoo.com mailto:ggeisler@frontiernet.net mailto:Jnadams80@gmail.com mailto:Gwtransport91@gmail.com
6. Can the wire gate at the Mother Hubbard Trail be taken down temporarily to allow access of equipment to pass through to project site?
a. Yes, gate may be temporarily taken down, with the expectation that the width will not exceed 8 feet and that the gate will be returned to the original configuration at close out of project. There must be a temporary 8’ gate (can be wire, metal) that needs to always remain closed to prevent cattle from entering Dry Blue, as this is an area with sensitive species and cattle are not permitted.
7. Can full sized equipment be used?
a. Beyond the staging area, no full-sized vehicles or equipment are permitted to access the project site. Equipment such as mini excavators, skidsteer, dump trailer, small tractors or backhoes would be examples of equipment suitable for project area. Trail width is 8 feet, so equipment utilized should not exceed this.
8. Do the trees in the designated re-routes need to be flagged or have approval before they are removed?
a. No, they do not need approval before removal if they are under 15” DBH (diameter at breast height). Tree removal will be at the discretion of the contractor but should only be performed when necessary to clear the path for the re-routes. Material can be used to aid with blocking the old trail.
9. Are there any tonnages for the required Aggregates: (Primary and secondary treatment)?
a. We decided it is up to the contractor to come up with estimated amounts for the crossing treatments based on the details/dimensions on page 12 of the plans.
10. Is the source for said aggregates off site?
a. I do not know the exact location, but Caorlyn may be able to chime in as she stated they at the district found a good rock source in an ephemeral drainage on the lower end.
11. Plans indicate on sheet 5: “MINIMAL LOCAL GRADING ANTICIPATED.
CONSTRUCTION TRAFFIC WILL PRIMARILY ESTABLISH NEW ROUTE.” On sheet 8 (crossing detail ) it shows cutting which I suppose is only applicable to create the entry/exit slopes for the crossing, and is not present anywhere else along the new trail?
a. .Correct, the minimal local grading is only applicable to the entry/exit for the new crossings. The realignment will mostly be established by the construction equipment and vehicles. The terrain is flat thus making minimal to no grading necessary for the realignment. This trail is limited to OHV traffic only so
12. Can you provide co-ordinates for the end of the re-route section please.
a. The Northing/Easting for all the realignments are called out on the respective realignment sheets.
File details come from the government source that posted it. Updated .