Exhibit F FY26 Construction Specifications Bid Proposal Worksheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Lease for office space - 6, 533 sq ft required
Solicitation number
DACA455270014400
Issued by

About this file

This is a Bid Proposal Worksheet template for construction work associated with the Recruiting Facilities Program lease solicitation for office space in the Menomonee Falls/Milwaukee area of Wisconsin. The worksheet is designed to collect itemized pricing from bidders for build-out work required to meet construction specifications at the leased facility.

The worksheet itemizes approximately 116 line items across multiple construction categories including HVAC/Mechanical, Plumbing, Electrical, Communications, Safety & Fire Equipment, Architectural Finishes, Fixtures, Supplies, Signage, and Security Systems. Specific items include general trades work, water fountains, restroom fixtures, janitorial closets, interior and exterior lighting, emergency lighting, CAT-6 wiring, fire equipment, ceilings, walls, soundproofing, paint (with service-specific options for Army, Navy, Marines, Air Force/Space Force, and National Guard variants), flooring options (porcelain tile, vinyl composition tile, luxury vinyl tile, and service-specific carpet selections), windows, doors, mini-blinds, roller shades, perforated window wraps, interior and exterior signage with service-specific graphics, video intercom entry control systems, CCTV systems, and permits and architectural/design costs. The worksheet requires bidders to enter a unit price for each item and calculate subtotals, with a grand total line showing 116 items and a final bid amount. This template is mandatory to complete in its entirety; incomplete submissions may result in rejection of the overall offer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Recruiting Facilities Program
Construction Specifications Bid Proposal Worksheet
Version: 2021-10-15
IMPORTANT NOTES:
1) All information supplied by the lessor/contractor on this bid proposal worksheet MUST include ALL appropriate requirements from the construction specifications Appendix provided by the USACE Representative.
2) The entire bid proposal worksheet MUST be filled out in its entirety. Failure to fill out this bid proposal worksheet may result in the overall offer being rejected by USACE.
Bid CategoryQuantity$ - EachSub-TotalComments
HVAC / Mechanical1$ 1.00$ 1.00
Plumbing:
General1$ 1.00$ 1.00
Water Fountain1$ 1.00$ 1.00
Restroom (1)1$ 1.00$ 1.00
Restroom (2)1$ 1.00$ 1.00
Janitorial Closet1$ 1.00$ 1.00
Wet Pantry (if applicable)1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Electrical:
General1$ 1.00$ 1.00
Interior Lighting1$ 1.00$ 1.00
Exterior Lighting1$ 1.00$ 1.00
Exterior Signage1$ 1.00$ 1.00
Emergency Lighting1$ 1.00$ 1.00
Roller Shades1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Communications:
General1$ 1.00$ 1.00
Conduit1$ 1.00$ 1.00
CAT-6 Wiring1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Safety & Fire Equipment1$ 1.00$ 1.00
Archetectural Finishes-Fixtures-Supplies:
Ceilings1$ 1.00$ 1.00
Walls1$ 1.00$ 1.00
Soundproofing1$ 1.00$ 1.00
Paint:
Common Area (Gov't Controlled)1$ 1.00$ 1.00
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Porcelain Tile (wall / floor)1$ 1.00$ 1.00
Vinyl Composition Tile (VCT)1$ 1.00$ 1.00
Luxury Vinyl Tile (Air & Army Natl Guard)1$ 1.00$ 1.00
Carpet:
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Base Cove (to include tiled areas)1$ 1.00$ 1.00
Fragment Retention Film1$ 1.00$ 1.00
Mini-Blinds1$ 1.00$ 1.00
Windows1$ 1.00$ 1.00
Doors1$ 1.00$ 1.00
Trim Work (chair rail, etc.)1$ 1.00$ 1.00
Roller Shades1$ 1.00$ 1.00
Fixed Panel Shade(s)1$ 1.00$ 1.00
Secondary Exit Door Security Hardware1$ 1.00$ 1.00
Restroom Fixtures1$ 1.00$ 1.00
Perforated Window Wrap(s):
JRFC (Joint) Graphic1$ 1.00$ 1.00
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Shelving1$ 1.00$ 1.00
Desk-Top(s)1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Signage:
Interior Signage:
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Restroom(s)1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Exterior Signage:
Army1$ 1.00$ 1.00
Navy1$ 1.00$ 1.00
Marines1$ 1.00$ 1.00
Air Force/Space Force1$ 1.00$ 1.00
Air Force Reserve1$ 1.00$ 1.00
Air National Guard1$ 1.00$ 1.00
Army National Guard1$ 1.00$ 1.00
Video Intercom Entry Control System1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Marquee / Pylon Signage1$ 1.00$ 1.00
Security Systems:
Video Intercom Entry Control System:
General/System (main parts/wiring/etc.)1$ 1.00$ 1.00
Door Station(s)1$ 1.00$ 1.00
Desk Stations (master + sub-masters)1$ 1.00$ 1.00
CCTV System:
General/System (NVR /Wiring / Etc.)1$ 1.00$ 1.00
Cameras1$ 1.00$ 1.00
TV Monitor(s) - (office displays)1$ 1.00$ 1.00
Security Closet1$ 1.00$ 1.00
Other (define)1$ 1.00$ 1.00
Permits Fees (all necessary, including low voltage if applicable)1$ 1.00$ 1.00
Architectural / Design Costs1$ 1.00$ 1.00
Other Items (define):
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
1$ 1.00$ 1.00
BID PROPOSAL - GRAND TOTAL1$ 1.00$ 116.00