EXHIBIT_F_FKEC_Q_Feeder_-_Staking_Sheet.pdf
PDF 73 KB Posted
- Solicitation number
- FKEC BID #26-03
- Issued by
- Florida
About this file
This staking sheet, prepared for the Florida Keys Electric Cooperative Association (FKEC), is a technical exhibit documenting the structural specifications and geographic coordinates for the Q Feeder project. The document details 37 new distribution poles and associated framing locations across a 5-mile feeder route extending from Crawl Key to Marathon Substations along US1/Overseas Highway between Mile Markers 57 and 52. Each structure entry includes specific technical parameters such as span distances (ranging from 42.789 to 285.244 feet), line angles, vertical and horizontal coordinates in State Plane Feet (X Easting and Y Northing), structure heights (38.5 to 43.0 feet), pole class designations (45_H1, 50_H1, 50_12.8 kip, and 50_20 kip), embedded depths (6.5 to 10 feet), framing specifications, latitude and longitude coordinates, phasing designations (AR, BT), phases (BM, AM, CB), and construction sequence (Transfer, Attach, None). The structures are identified by designations including R00, R01, R02, Q12 through Q55, B14A, and B15, with new construction indicated throughout. This technical staking sheet serves as the baseline reference document for contractors to understand pole locations, specifications, and installation requirements for the overall feeder reconstruction project.
The staking sheet includes notation of specialized equipment integration points, including 900A terminators, various voltage class designations (VC1-P through VC33-1P), and cross-arms or attachment designations (M3-13, M5-9, M5-10, VG1, VG2, VG3, VA5-P). Joint use provisions are identified for limited structures, indicating coordination requirements with other utility providers. The geographic data provided establishes precise locations within Florida's state coordinate system, essential for permitting, environmental review, right-of-way verification, and field survey validation. This document reflects the engineering design phase completion and represents the contractual baseline for construction execution, material procurement, and project scheduling, directly supporting the March 3, 2026 bid deadline and December 31, 2027 project completion deadline established in the procurement specifications.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Structure Number Existing Ahead Span
(ft) Line Angle
(deg) X Easting
(ft) Y Northing
(ft) Structure Height
(ft) Class
Modeled Embedded Depth
(ft) Framing
Latitude (deg)
Longitude (deg)
PHASING Joint Use Tree Trim
R00 New 266.201 4.061 663799.501 151408.669 38.5 45_H1 6.5
VC1-P
VG2
24.749996 -80.977007 AR BM CF Transfer
R01 New 42.789 24.6177 663816.802 151143.031 40.0 50_12.8 kip 10 VC8-P 24.749258 -80.976957 AR BM CF Transfer
R02 New 77.908 -1.513 663801.544 151103.055 38.5 45_H3 6.5
VC1-P
VC7-P
900A TERM
24.749154 -80.977002 AR BM CF Transfer
Q12 New 81.614 -2.9919 649667.495 145137.764 40.0 50_20 kip 10
VC8-P
900A TERM
24.7327 -81.0196 AR BM CF None
Q13 New 109.011 0.3124 649563.276 145105.8 38.5 45_H1 6.5
VC1-P
M3-13
24.7327 -81.0199 AR BM CF None
Q14A New 165 43.0 50_H1 7 VC1-P 24.732535 -81.0203 AR BM CF None Q15 New 198 -1.0883 649228.378 145003.736 43.0 50_H1 7 VC1-P 24.7324 -81.0209 AR BM CF None Q16 New 201.445 -2.0796 649034.543 144948.894 38.5 45_H1 6.5 VC1-P 24.7322 -81.0215 AR BM CF None
Q17 New 171.511 1.012 648867.925 144908.22 38.5 45_H1 6.5
VC1-P
VG2
24.7321 -81.0220 AR BM CF None
Q18 New 194.246 -3.4719 648680.063 144858.829 38.5 45_H1 6.5 VC1-P 24.7320 -81.0226 AR BM CF None
Q19 New 202.714 3.2329 648481.251 144819.252 38.5 45_H1 6.5
VC1-P
VC7-P
M5-9 x2
24.7319 -81.0232 AR BM CF None
Q20 New 130.614 -0.6369 648354.792 144786.569 40.0 50_20 kip 10
VC7-P
900A TERM
24.7318 -81.0235 AR BM CF None X
Q24 New 76.931 4.1794 647183.815 144560.027 40.0 50_20kip 10
VC7-P
VA5-P
M5-9
900A TERM
24.7311 -81.0271 AR BM CF Attach
Q28 New 177.546 0.4441 645731.695 144240.421 43.0 50_12.8 kip 7
VC17-P
VC5-P
M5-10 x3
24.7303 -81.0314 BT AM CB Transfer X
Q29 New 159.193 5.5672 645641.404 144223.129 38.5 45_H3 6.5
VC19-P
VG2
24.7302 -81.0317 BT AM CB Transfer
Q30 New 230.553 -1.2497 645417.026 144170.126 38.5 45_H1 6.5 VC1-P 24.7301 -81.0324 AR BM CF Transfer
Q31 New 233.158 2.5416 645188.998 144121.486 38.5 45_H1 6.5
VC33-1P
VG2
24.7299 -81.0331 AR BM CF Transfer
Q32 New 134.102 -1.5909 645059.216 144087.722 38.5 45_H1 6.5
VC1-P
VG1
24.7298 -81.0335 AR BM CF Transfer
Q33 New 205.066 -0.061 644859.4 144041.62 38.5 45_H1 6.5 VC1-P 24.7297 -81.0341 AR BM CF Transfer Q35 New 215 3.3061 644323.346 143923.654 38.5 45_H1 6.5 VC1-P 24.7294 -81.0357 AR BM CF Transfer
Q36 New 212 -5.0589 644197.214 143889.164 38.5 45_H1 6.5
VC1-P
VG3
24.7293 -81.0361 AR BM CF Transfer
Q37 New 259.373 5.3631 643941.968 143843.081 38.5 45_H1 6.5 VC33-1P 24.7292 -81.0368 AR BM CF Transfer
Q39 New 285.244 6.3249 643423.832 143722.94 43.0 50_H1 7
VC1-P
VG3
24.7288 -81.0384 AR BM CF Attach
Q41 New 246.536 643184.35 143664.387 43.0 50_H1 7
VC1-P
M3-13
24.7287 -81.0391 AR BM CF Attach
Q43 New 172.792 -0.6009 642857.563 143590.1 43.0 50_H1 7 VC1-P 24.7285 -81.0401 AR BM CF Attach Q45 New 130.969 -1.9082 642617.248 143537.479 40.0 50_20 kip 10 VC8-P 24.7283 -81.0408 AR BM CF Transfer
Q47 New 229.345 4.7888 642328.139 143476.153 38.5 45_H1 6.5
VC1-P
VG3
24.7282 -81.0417 AR BM CF Transfer
Q51 New 247.054 1.0062 641576.286 143213.654 38.5 50_H1 6.5
VC1-P
VG2
24.7274 -81.0440 AR BM CF Transfer
Q55 New 147.211 641027.233 142984.533 40.0 50_20 kip 10
VC7-P
VG2
24.7268 -81.0456 AR BM CF Transfer
B15 New 184.781 0.0163 639012.554 142149.08 43.0 50_12.8 kip 7
VC1-P
VC8-P
900A TERM
24.7245 -81.0517 AR BM CF Transfer X
B14A New 134.97 -0.2216 638889.061 142094.617 38.5 45_H1 6.5
VC1-P
900A TERM
24.7244 -81.0521 AR BM CF Attach
File details come from the government source that posted it. Updated .