This document appears to be a set of project drawings related to the Mu2e Target Air Handling and HEPA System project. The drawings provide a location plan, mechanical cover sheet, mechanical floor plans, mechanical elevations and schedules, and electrical plans. Key details include:
The project involves the construction of a Mu2e target air handling and HEPA system at the Fermi National Accelerator Laboratory. The drawings illustrate the layout of ductwork, HEPA filtration equipment, differential pressure monitoring, and electrical power distribution for the system. The project location is depicted on the vicinity plan. Mechanical equipment schedules provide details on the HEPA filter unit and exhaust fan specifications. The electrical plans show the power distribution and wiring for the new equipment.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mu2e TARGET AIR HANDLING & HEPA SYSTEM
PROJECT NO.: 6-10-29
LIST OF DRAWINGS
G-1 LOCATION PLAN
M-0 MECH. COVER SHEET
M-1 MECH. FLOOR PLANS
M-2 MECH. ELEVATIONS AND
SCHEDULES.
E-1 ELEC. PLANS
PROJECT
AREA
RAILYARD
STORAGE
AREA
ROAD
C
HWY. 56 BUTTERFIELD RD.
INDUSTRIAL
MAIN
TO
IN
TE
R
ST
AT
E I-8
FA
R N
SW
O
R
TH
KAUTZ RD.
CONSTRUCTION
ENTRANCE
INJECTOR
MAIN
SUBSTATION
KA
U
TZ
R
D
KAUTZ RD.
RING RD.
WILSON ST.
ENTRANCE
PINE ST.
ENTRANCE
(NO TRUCKS)
R O
AD
B
PINE ST. (OUT)
PINE ST. (IN)
KI
R
K R
D
ROAD
A
-2
ROAD
A -1
HOLTER RD
AREA
LABORATORY
CENTRAL
CDF
FE
LD
O
TT
R D
BATAVIA RD.
WILSON ST.
RECEIVING
SITE
BURLINGTON NORTHERN R.R.
TO ENTER THIS GATE
FA
RM
R D
LEGEND
SITE BOUNDARY LINES
ON SITE CONST. ROUTES
SW
ENSON
HOURS
(NO ACCESS)
EOLA RD.
ENTRANCE
TO RT. 59
HWY 38 ROOSEVELT RD.
BATAVIA RD.
EO
LA
R D
FIXED
TARGET
AREA
ROAD D
FERMILAB
VILLAGE
LOCKED
GATE
WILSON ST.
NOTE: APPROPRIATE I.D. IS REQUIRED
(LOAD LIMIT-6 TONS)
C O
M M
O N
W
EA
LT
H
E D
IS
O
N P
O W
ER
L
IN
ES
BATAVIA RD.
ENTRANCE
TO HWY 59
EL
G
IN
J
O
LI
ET
E
AS
TE
R
N R
.R
WILSON ST 6 AM TO 6 PM
PINE ST 6 AM TO 8 PM
BATAVIA RD 6 AM TO 8 PM
KAUTZ RD CLOSED
NOTE: APPROPRIATE I.D.
IS REQUIRED TO ENTER
THIS GATE (REAL ID)
VICINITY PLAN
NOT TO SCALE
G-1REVISIONS
DATEREV. DESCRIPTIONS
SUBMITTED
APPROVED
CHECKED
DRAWN
DESIGNED
NAME
FERMI NATIONAL ACCELERATOR LABORATORY
DATE
SCALE:
DRAWING NO. REV.
UNITED STATES DEPARTMENT OF ENERGY
J an
0,
- 2
:4 5p m H
:\a ct iv e pr oj ec ts
\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m
\3 fin al d es ig n\
D ra w in gs \6
-1 0-
C
O
VE
R .d w g
A TAYLOR
A TAYLOR
L HAMMOND
J WILLS
J WILLS
1/26/24
Mu2e TARGET AIR
HANDLING & HEPA SYSTEM
6-10-291/26/24
1/26/24
1/26/24
1/26/24
J a n
LOCATION PLAN
ABBREVIATIONS
NEW DUCTWORK DIMENSIONS10x10
EXISTING DUCTWORK DIMENSIONS10/10
ATMOSPHERIC VENT
APPARATUS DEW POINT
ABOVE FINISHED FLOOR
AVERAGE
AFF
ADP
ATV
AVG
BOILER BLOW DOWNBBD
BACKDRAFT DAMPERBDD
BELOW FINISHED CEILINGBFC
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BTU PER HOURBTUH
COOLING COILCC
CUBIC FEET PER MINUTECFM
CHILLED WATER RETURNCHWR
CHILLED WATER SUPPLYCHWS
CONDENSER WATER RETURNCWR
CONDENSER WATER SUPPLYCWS
EXHAUST AIREA
ENTERING AIR TEMPERATUREEAT
EXTERNAL STATIC PRESSUREESP
ENTERING WATER TEMPERATUREEWT
FIRE DAMPERFD
FUEL OILFO
FEET PER MINUTEFPM
FEETFT
FOOT POUNDFT LB
GAUGEGA
GALLONGAL
GALLONS PER MINUTEGPM
GRAINSGR
HEATING COILHC
HEADHD
HORSEPOWERHP
HOT WATER RETURNHWR
HOT WATER SUPPLYHWS
INNER DIAMETERID
INCHESIN
KILOWATTKW
LEAVING AIR TEMPERATURELAT
POUNDSLBS
LINEAR FEETLF
LEAVING WATER TEMPERATURELWT
MIXED AIRMA
THOUSAND BTUS PER HOURMBH
MAKEUP AIRMUA
MAKEUP WATERMUW
MANUAL VOLUME DAMPERMVD
NEWN
NOT APPLICABLEN/A
NOISE CRITERIANC
NORMALLY CLOSEDNC
NATURAL GAS, HIGH PRESSURENGHP
NOT IN CONTRACTNIC
NORMALLY OPENNO
OUTSIDE AIROA
OUTSIDE DIAMETEROD
PUMPED CONDENSATEPCND
PRESSURE DIFFERENCEPD
ELECTRICAL PHASEPH
PARTS PER MILLIONPPM
POUNDS PER SQUARE FOOTPSF
POUNDS PER SQUARE INCHPSI
RETURN AIRRA
RELATIVE HUMIDITYRH
REVOLUTIONS PER MINUTERPM
SUPPLY AIRSA
SMOKE DAMPERSD
SAFETY FACTORSF
SPECIFIC GRAVITYSG
STATIC PRESSURESP
SQUARESQ
TEMPERATURE DIFFERENCETD
TOTAL STATIC PRESSURETSP
UNDERCUT DOORUC
UP THROUGH ROOFUTR
VOLTAGEV
VARIABLE AIR VOLUMEVAV
VELOCITY PRESSUREVP
VARIABLE REFRIGERANT VOLUME/FLOWVRV/F
VARIABLE VOLUME AND TEMPERATUREVVT
INCHES WATER COLUMNWC
EXISTING TO REMAINX
EXISTING TO BE DEMOLISHEDXD
EXISTING TO BE RELOCATEDXR
EXISTING REMOVED AND RELOCATEDXRR
AIR SYSTEM SYMBOLS
NEW SUPPLY DIFFUSER
NEW RETURN GRILLE
NEW SUPPLY DIFFUSER WITH BLANK OFF PANEL
NEW ROUND SUPPLY DIFFUSER
SURFACE MOUNTED SUPPLY GRILLE
DIRECTION OF AIRFLOW
MANUAL VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
NEW DUCTWORK
EXISTING SUPPLY DUCTWORK TO REMAIN
EXISTING SUPPLY DUCTWORK TO BE DEMOLISHED
EXISTING SUPPLY DIFFUSER
EXISTING RETURN GRILLE
EXISTING EXHAUST GRILLE
NEW EXHAUST GRILLE
POINT OF CONNECTION
POINT OF DISCONNECTION
CONTROL DIAGRAM SYMBOLS
THERMOSTAT
TEMPERATURE SENSOR
HUMIDISTAT
EQUIPMENT SYMBOLS
ELECTRIC UNIT HEATER
ELECTRIC WALL HEATER
ELECTRICAL/CONTROL PANEL
PUMP
ELECTRIC CABINET HEATER
VARIABLE AIR VOLUME BOX
ANNOTATION SYMBOLS
NEW AIR DEVICE TAG
EQUIPMENT TAG
REVISION DELTA
KEY NOTE
EXISTING AIR DEVICE TAG
S = SUPPLY AIR
R = RETURN AIR
E = EXHAUST AIR
M = MAKE-UP AIR
T = TRANSFER AIR
X-###
PIPING SYMBOLS
VENTLESS PRESSURE REGULATOR
PIPE UP
PIPE DOWN
PIPE TEE DOWN
PIPE CONTINUATION
PIPE CAP
VALVE (REFER TO LABEL FOR TYPE)
CHECK VALVE
PRESSURE REDUCING VALVE
CONTROL VALVE
CONTROL VALVE (3-WAY)
CONTROL VALVE (4-WAY)
STRAINER
STRAINER WITH BLOW DOWN VALVE
PIPE UNION
SURFACE MOUNTED RETURN/EXHAUST GRILLE
NEW SUPPLY PIPING
NEW RETURN PIPING
X XXXX
X"
XXX-X
X
X
M
MF
S
T
S
H
X
X DETAIL/SECTION MARKDETAIL #
SHEET #
XXX
XXX
XXX ROOM TAG
M
GAS FIRED UNIT HEATER
CHILLED/HOT WATER COIL
ELECTRIC HEATING COIL
OPPOSED BLADE DAMPER
M PARALLEL BLADE DAMPER
T AVERAGING TEMPERATURE SENSOR
T BULB TEMPERATURE SENSOR
H HUMIDITY SENSOR
PIPING PITCH (POINTING DOWN)X%
A AIRFLOW MEASURING STATION
FAN
FILTER
DIRECTION OF FLOW
NEW LINEAR SLOT DIFFUSER
ACCESS DOOR/PANEL
DUCTWORK CONTINUATION
COMPRESSED AIRAIR
CONDENSATECND
DUAL TEMPERATURE WATER RETURNDTWR
DUAL TEMPERATURE WATER SUPPLYDTWS
INDUSTRIAL COOLING WATER RETURNICWR
INDUSTRIAL COOLING WATER SUPPLYICWS
LOW CONDUCTIVITY WATER RETURNLCWR
LOW CONDUCTIVITY WATER SUPPLYLCWS
NATURAL GAS, LOW PRESSURENGLP
NATURAL GAS, MEDIUM PRESSURENGMP
NITROGEN GASNIT
REFRIGERANTREFR
VACUUM AIRVAC
PROJECT NORTHPN
TRUE NORTHTN
TRITIATED CONDENSATETCND
CHILLED WATER PIPING
HYDRONIC HOT WATER PIPING
CONDENSER WATER PIPING
INDUSTRIAL COOLING WATER PIPING
LOW CONDUCTIVITY WATER PIPING
CONDENSATE DRAIN PIPING
DUAL TEMP WATER PIPING
LOW PRESSURE NATURAL GAS PIPING
MEDIUM PRESSURE NATURAL GAS PIPING
HIGH PRESSURE NATURAL GAS PIPING
DEMO SUPPLY PIPING
DEMO RETURN PIPING
EXISTING SUPPLY PIPING
EXISTING RETURN PIPING
VARIABLE FREQUENCY DRIVEVFD
VARIABLE SPEED DRIVEVSD
POND WATER RETURNPWR
POND WATER SUPPLYPWS
MOTORIZED DAMPERM
BALANCING VALVE
M-0REVISIONS
DATEREV. DESCRIPTIONS
SUBMITTED
APPROVED
CHECKED
DRAWN
DESIGNED
NAME
FERMI NATIONAL ACCELERATOR LABORATORY
DATE
SCALE:
DRAWING NO. REV.
UNITED STATES DEPARTMENT OF ENERGY
J an
0,
- 2
:4 5p m H
:\a ct iv e pr oj ec ts
\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m
\3 fin al d es ig n\
D ra w in gs \6
-1 0-
M
EC
H
AN
IC
AL
.d w g
Mu2e TARGET AIR
HANDLING & HEPA SYSTEM
6-10-29 1 J a n
A TAYLOR
A TAYLOR
L HAMMOND
J WILLS
J WILLS
1/26/24
1/26/24
1/26/24
1/26/24
1/26/24
MECH. COVER SHEET
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
E
PN TN
DUMP
D E F
ELEVATOR
MACHINE ROOM
TRUCK B
8" ø
5" ø
5" ø
8" ø
24"x34" 24"x44"
2 " G
2 1/2" CGS
2 1/2" CGR
M
REMOTE
HANDLING ROOM
16"Ø
"Ø
HEF-1
1500-E
PRODUCTION
SOLENOID AREA
DETECTOR
HALL
EXTINCTION
MONITOR ROOM
4" AIR SAMPLING
TUBE (TYP. ALL)
INSTALL SPACE DP
TRANSMITTERS AND HEPA DP
TRANSMITTER IN EXISTING
CONTROL RACK.
ROUTE NEW PRESSURE SENSOR
TUBING THROUGH EXISTING CONDUIT
PIPES. REFER TO SPECIFICATIONS FOR
PROPER TUBING MATERIALS.
ROUTE PRESSURE SENSOR
TUBING THRU PIPE CONDUIT
AND TERMINATE IN SPACE.
TERMINATE TUBING IN STAIRWELL
SPACE. SLEEVE PIPING THROUGH
METAL DOOR FRAME.
TERMINATE TUBING IN
ENCLOSURE SPACE.
TERMINATE TUBING IN REMOTE
HANDLING AREA.
ROUTE TUBING THROUGH
DUMP AND TERMINATE IN
EXTINCTION AREA.
TERMINATE TUBING IN
PRODUCTION SOLENOID AREA.
COORDINATE FINAL LOCATION OF
SOLENOID AREA WALL IN FIELD.
DIFF. PRESS. SENSORS
DETECTION SOLENOID AREA TO
PRODUCTION
SOLENOID AREA
EGRESS STAIRWELL TO
M-4 ENCLOSURE TO
REMOTE HANDLING AREA TO
EXTINCTION AREA TO
PROVIDE DIFFERENTIAL PRESSURE SENSORS
BETWEEN THE FOLLOWING AREAS:
INSTALL HEPA EXHAUST FAN
HEF-1 ABOVE MEZZANINE.
M4
TUNNEL
HEPA-1
ROUTE SAMPLING TUBE PIPING
AS HIGH IN SPACE AS POSSIBLE.
FOLLOW EXISTING PIPE
ROUTING WHERE POSSIBLE.
A B C D E F
LOWER LEVEL MECHANICAL PLAN
1/88" = 1'-0"
FIRST FLOOR MECHANICAL PLAN
1/88" = 1'-0"
ROUTE TUBING IN GAP
AROUND DUCT PRIOR
TO SEALING
A
INSTALL AIRFLOW MEASURING
STATION IN HORIZONTAL SECTION OF
DUCT. FOLLOW MANUFACTURER'S
STRAIGHT DUCT REQUIREMENTS.
ROUTE CONTROL WIRE UP TO
EQUIPMENT RACK ON MEZZANINE.
GENERAL NOTES
1. COORDINATE FINAL LOCATION OF ALL PRESSURE MONITORING
TUBING WITH EXISTING EXPERIMENTAL EQUIPMENT IN THE
FIELD.
TERMINATE EXHAUST DUCT IN
PRODUCTION SOLENOID AREA.
COORDINATE FINAL LOCATION OF
SOLENOID AREA WALL IN FIELD.
M-1REVISIONS
DATEREV. DESCRIPTIONS
SUBMITTED
APPROVED
CHECKED
DRAWN
DESIGNED
NAME
FERMI NATIONAL ACCELERATOR LABORATORY
DATE
SCALE:
DRAWING NO. REV.
UNITED STATES DEPARTMENT OF ENERGY
J an
0,
- 2
:4 6p m H
:\a ct iv e pr oj ec ts
\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m
\3 fin al d es ig n\
D ra w in gs \6
-1 0-
M
EC
H
AN
IC
AL
.d w g
Mu2e TARGET AIR
HANDLING & HEPA SYSTEM
6-10-29 1 J a n
A TAYLOR
A TAYLOR
L HAMMOND
J WILLS
J WILLS
1/26/24
1/26/24
1/26/24
1/26/24
1/26/24
MECHANICAL FLOOR PLANS
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
03300.A2
03300.A4
03300.A4
03300.A1
07131.A1
07131.A1
03300.A2
05521.A3
"Ø
16"Ø
HEPA-1
HEF-1
EXHAUST FAN SCHEDULE
TAG CFM ESP
(IN. WC)
FAN
RPM LwA
ELECTRICAL
MANUFACTUER MODEL WEIGHT REMARKS
VOLT-PH-HZ HP MOTOR
RPM
HEF-1 1500 2.5 3456 87 480-3-60 2 3600 AEROVENT CDD-12 306 ALL
REMARKS:
1 PROVIDE WITH ELASTOMERIC SPRING ISOLATORS.
HEPA FILTER UNIT SCHEDULE
TAG PRE-FILTER
EFF.
PRE-FILTER
DIMS
FINAL
FILTER
EFF.
FINAL FILTER
DIMS MANUFACTUER MODEL REMARKS
HEPA-1 MERV 8 24X24X2 HEPA 24X24X11.5 CAMFIL CF-2X1-212P-3FB-SS ALL
REMARKS:
1 PROVIDE WITH PRESSURE INDICATING TRANSMITTER GAUGE. LOCATE GAUGE ON RACK IN
MEZZANINE SPACE AS INDICATED ON FLOOR PLANS.
2 PROVIDE WITH 2 SPARE HEPA FILTERS, 2 SPARE MERV 8 PREFILTERS, AND 2 CHANGE-OUT BAGS
FOR EACH.
GRILLLE, REGISTER, & DIFFUSER SCHEDULE
TAG SERVICE FACE SIZE CONNECTION
STYLE MOUNTING DESCRIPTION MANUFACTURER MODEL REMARKS
E1 RETURN/
EXHAUST SEE PLANS RECT. SURFACE 35° DEFLECTION FIXED BLADE STEEL GRILLE TITUS 350RL ALL
REMARKS:
1 PROVIDE WITH BORDER TYPE 1NOT TO SCALE
PRESSURIZATION MONITORING SCHEMATIC
OPEN
ENDED
TUBE
TUBING
PRESSURE
TRANSDUCER
PRESSURA RPM-20
24v WIRING
OPEN
ENDED
TUBE
SPACE 1
SPACE 2 24v POWER
0-10v/4-20 mA
OUTPUT SIGNAL
24v POWER
24v POWER
M-2REVISIONS
DATEREV. DESCRIPTIONS
SUBMITTED
APPROVED
CHECKED
DRAWN
DESIGNED
NAME
FERMI NATIONAL ACCELERATOR LABORATORY
DATE
SCALE:
DRAWING NO. REV.
UNITED STATES DEPARTMENT OF ENERGY
J an
0,
- 2
:4 6p m H
:\a ct iv e pr oj ec ts
\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m
\3 fin al d es ig n\
D ra w in gs \6
-1 0-
M
EC
H
AN
IC
AL
.d w g
Mu2e TARGET AIR
HANDLING & HEPA SYSTEM
6-10-29 1 J a n
A TAYLOR
A TAYLOR
L HAMMOND
J WILLS
J WILLS
1/26/24
1/26/24
1/26/24
1/26/24
1/26/24
MECH. ELEVATIONS AND SCHEDULES
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
REMOTE
HANDLING AREA
HEF-1
PRODUCTION
SOLENOID AREA
RELOCATE EXISTING
EQUIPMENT DISCONNECT
FROM MEZZANINE DOWN TO
LOWER LEVEL.
A B C
LOWER LEVEL ELECTRICAL PLAN
1/88" = 1'-0"
CS-Mu2e-7 (EXISTING) 480V PHP-Mu2e-A1-7/9
WIRE STARTER TO HEF-1
3 #12 AWG, 1 #12 GND. IN 3 4"C
250A
TR-PHP-Mu2e-A1-7-A
75KVA
480-208Y/120 VAC
F
PP-Mu2e-A1-7-A1 225 A
208Y/120 VAC
3PH, 4W
MLO
PHP-Mu2e-A1-7 250 A
480/277 VAC
3PH, 4W
MLO
K-RATED
EXISTING DISTRIBUTION PANEL DHP-Mu2e-A1, 1200A, 480/277V, 3P, 4W, 65kAIC
LIFT
7.5 HP, 11 FLA
DS-LIFT
EF-T1
GRADE MOUNTED
3/4 HP, 1.6 FLA
30AF, NEMA 1, 3PH,
MC BEAMLINE
ENCLOSURES
WD-T1
WELDING
RECEPTACLE
MC BEAMLINE
ENCLOSURES
WD-T2
WELDING
RECEPTACLE
MC BEAMLINE
ENCLOSURES
MC BEAMLINE
ENCLOSURES
JJ
EUH-T1
ELECTRIC UNIT
MC BEAMLINE
EXIT STAIRS
7.5 kW, 9 FLA
EXHAUST FAN
HEATER
NF
J
#2 GND. DS-PP-Mu2e-A1-7-A1
200A/200AF
NEMA 1, 3PH
200 AMP, 277/480 VAC
TEMPORARY POWER FEED
FOR PANEL DHP-Mu2e-A1-7
15A
HEF-1
TRANSPORT
SOLENOID
AREA 013
2 HP, 480V, 3ɸ
CS-Mu2e-7
TRANSPORT
SOLENOID
AREA 013
HIGH POWER
PANELBOARD
MC BEAMLINE
ENCLOSURES
POWER
PANELBOARD
Mu2e LOWER LEVEL NEAR
TUNNEL STAIR 4DVP- 4 & 5
DIFFUSION VACUUM
PUMPS VHS-6 3HP 2.2
kW 208V, 1PH (EACH)
LOCATED IN RM. 015
NF
DS-DVP- 4 & 5
(2)30A, NEMA 1, 208V, 1PH
REMOTE HANDLING
RM 015
FUTURE
FUTURE
NF
DS-DVP- 1, 2, & 3
(3)30A, NEMA 1, 208V, 1PH
LOWER LEVEL ABOVE STAIR
DVP- 1, 2, & 3 DIFFUSION
VACUUM PUMPS VHS-6 3HP 2.2
kW 208V, 1PH (EACH) LOCATED
LOWER LEVEL ABOVE STAIR
SINGLE LINE DIAGRAM
1/88" = 1'-0"
RELOCATE EXISTING
COMBINATION STARTER
3 #12 AWG,
1 #12 GND.
IN 3 4"C
Average Est. Demand Amp per Ph:
Max. Connected Amp per Ph:
Total Est. Demand:
Total Conn. Load: 113272.8 VA
Panel Totals
TOTAL AMPS: 126 A 124 A 120 A
TOTAL LOAD: 34989.6 VA 34449.6 VA 33189.6 VA
16 SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA
15 SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA
HEPA FILTER FAN 3 150 A 15A 903.0 VA
8 EUH-T1 (ELECTRIC UNIT HEATER) 3 150 A 15 A 2491.0 VA 2491.0 VA 2491.0 VA
6 EF-T1 (EXHAUST FAN) 3 150 A 15 A 443.0 VA 443.0 VA 443.0 VA
SPARE 3 30 A 0.0 VA 0.0 VA 0.0 VA
4 LIFT 3 150 A 20 A 3045.0 VA 3045.0 VA 3045.0 VA
3 WD-T1 & WD-T2(WELDING... 3 150 A 60 A 13303.0 VA 13303.0 VA 13303.0 VA
2 SPARE 3 20 A 0.0 VA 0.0 VA 0.0 VA
PP-Mu2e-A1-7-A1 VIA TRANSFORMER 3 150 A 125 A 12313.6 VA 11773.6 VA 10513.6 VA
CKT Circuit Description POLES FRAME TRIP A B C Remarks
LUGS: PHASE / WIRE: 3PH,4W AIC RATING: 35,000A
MAINS TYPE: MLO VOLTS 480/277V 3PH,4W ENCLOSURE TYPE: TYPE 1
MAIN BREAKER: FEEDER SIZE: 4#250, 1#2G, 2 1/2"C MOUNTING: SURFACE
MAINS BUS RATING: 250 A FED FROM: DHP-Mu2e-A1 LOCATION: Mu2e LL near STR 4
POWER PANEL: PHP-Mu2e-A1-7
100972.4
121 A
RECEPTACLE LOAD
LIGHTING LOAD
EQUIPMENT LOAD
64.45% 100 %
Connected Load Demand Factor Estimated Demand
100 %
34600.8 73176
22300.4
136 A
903.0 VA 903.0 VA
73176
SPARE 3 60 A 0.0 VA 0.0 VA 0.0 VA
EUH-3 (ELECTRIC UNIT HEATER) 3 150 A 15 A 2491.0 VA 2491.0 VA 2491.0 VA
SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA
SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA
SPARE 1 100 A 20 A 0.0 VA 0.0 VA 0.0 VA
SPARE 3 30 A 0.0 VA 0.0 VA 0.0 VA
100 A
100 A
100 A
100 A
150 A
150 A
150 A
150 A
EX
IS
TI
N
G
PH
P- M u2 e-
A1 -7
E-1REVISIONS
DATEREV. DESCRIPTIONS
SUBMITTED
APPROVED
CHECKED
DRAWN
DESIGNED
NAME
FERMI NATIONAL ACCELERATOR LABORATORY
DATE
SCALE:
DRAWING NO. REV.
UNITED STATES DEPARTMENT OF ENERGY
J an
0,
- 2
:4 6p m H
:\a ct iv e pr oj ec ts
\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m
\3 fin al d es ig n\
D ra w in gs \6
-1 0-
E
LE
C
TR
IC
AL
.d w g
Mu2e TARGET AIR
HANDLING & HEPA SYSTEM
6-10-29 1 J a n
R WIELGOS
A TAYLOR
R WIELGOS
J WILLS
J WILLS 1/26/24
1/26/24
1/26/24
1/26/24
1/26/24
ELECTRICAL PLANS
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
| Sheets and Views |
| 0 G-1 |
| 1 M-0 |
| 2 M-1 |
| 3 M-2 |
| 7 E-1 |
File details come from the government source that posted it. Updated .