Exhibit E2 - Mu2e Target Air Handling and HEPA System Project Drawings.pdf

PDF 1 MB Posted

Attached to
Mu2e Target Air Handling and HEPA System Project
Solicitation number
ISD-354744-RO
Issued by

About this file

This document appears to be a set of project drawings related to the Mu2e Target Air Handling and HEPA System project. The drawings provide a location plan, mechanical cover sheet, mechanical floor plans, mechanical elevations and schedules, and electrical plans. Key details include:

The project involves the construction of a Mu2e target air handling and HEPA system at the Fermi National Accelerator Laboratory. The drawings illustrate the layout of ductwork, HEPA filtration equipment, differential pressure monitoring, and electrical power distribution for the system. The project location is depicted on the vicinity plan. Mechanical equipment schedules provide details on the HEPA filter unit and exhaust fan specifications. The electrical plans show the power distribution and wiring for the new equipment.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mu2e TARGET AIR HANDLING & HEPA SYSTEM

PROJECT NO.: 6-10-29

LIST OF DRAWINGS

G-1 LOCATION PLAN

M-0 MECH. COVER SHEET

M-1 MECH. FLOOR PLANS

M-2 MECH. ELEVATIONS AND

SCHEDULES.

E-1 ELEC. PLANS

PROJECT

AREA

RAILYARD

STORAGE

AREA

ROAD

C

HWY. 56 BUTTERFIELD RD.

INDUSTRIAL

MAIN

TO

IN

TE

R

ST

AT

E I-8

FA

R N

SW

O

R

TH

KAUTZ RD.

CONSTRUCTION

ENTRANCE

INJECTOR

MAIN

SUBSTATION

KA

U

TZ

R

D

KAUTZ RD.

RING RD.

WILSON ST.

ENTRANCE

PINE ST.

ENTRANCE

(NO TRUCKS)

R O

AD

B

PINE ST. (OUT)

PINE ST. (IN)

KI

R

K R

D

ROAD

A

-2

ROAD

A -1

HOLTER RD

AREA

LABORATORY

CENTRAL

CDF

FE

LD

O

TT

R D

BATAVIA RD.

WILSON ST.

RECEIVING

SITE

BURLINGTON NORTHERN R.R.

TO ENTER THIS GATE

FA

RM

R D

LEGEND

SITE BOUNDARY LINES

ON SITE CONST. ROUTES

SW

ENSON

HOURS

(NO ACCESS)

EOLA RD.

ENTRANCE

TO RT. 59

HWY 38 ROOSEVELT RD.

BATAVIA RD.

EO

LA

R D

FIXED

TARGET

AREA

ROAD D

FERMILAB

VILLAGE

LOCKED

GATE

WILSON ST.

NOTE: APPROPRIATE I.D. IS REQUIRED

(LOAD LIMIT-6 TONS)

C O

M M

O N

W

EA

LT

H

E D

IS

O

N P

O W

ER

L

IN

ES

BATAVIA RD.

ENTRANCE

TO HWY 59

EL

G

IN

J

O

LI

ET

E

AS

TE

R

N R

.R

WILSON ST 6 AM TO 6 PM

PINE ST 6 AM TO 8 PM

BATAVIA RD 6 AM TO 8 PM

KAUTZ RD CLOSED

NOTE: APPROPRIATE I.D.

IS REQUIRED TO ENTER

THIS GATE (REAL ID)

VICINITY PLAN

NOT TO SCALE

G-1REVISIONS

DATEREV. DESCRIPTIONS

SUBMITTED

APPROVED

CHECKED

DRAWN

DESIGNED

NAME

FERMI NATIONAL ACCELERATOR LABORATORY

DATE

SCALE:

DRAWING NO. REV.

UNITED STATES DEPARTMENT OF ENERGY

J an

0,

- 2

:4 5p m H

:\a ct iv e pr oj ec ts

\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m

\3 fin al d es ig n\

D ra w in gs \6

-1 0-

C

O

VE

R .d w g

A TAYLOR

A TAYLOR

L HAMMOND

J WILLS

J WILLS

1/26/24

Mu2e TARGET AIR

HANDLING & HEPA SYSTEM

6-10-291/26/24

1/26/24

1/26/24

1/26/24

J a n

LOCATION PLAN

ABBREVIATIONS

NEW DUCTWORK DIMENSIONS10x10

EXISTING DUCTWORK DIMENSIONS10/10

ATMOSPHERIC VENT

APPARATUS DEW POINT

ABOVE FINISHED FLOOR

AVERAGE

AFF

ADP

ATV

AVG

BOILER BLOW DOWNBBD

BACKDRAFT DAMPERBDD

BELOW FINISHED CEILINGBFC

BRAKE HORSEPOWERBHP

BRITISH THERMAL UNITBTU

BTU PER HOURBTUH

COOLING COILCC

CUBIC FEET PER MINUTECFM

CHILLED WATER RETURNCHWR

CHILLED WATER SUPPLYCHWS

CONDENSER WATER RETURNCWR

CONDENSER WATER SUPPLYCWS

EXHAUST AIREA

ENTERING AIR TEMPERATUREEAT

EXTERNAL STATIC PRESSUREESP

ENTERING WATER TEMPERATUREEWT

FIRE DAMPERFD

FUEL OILFO

FEET PER MINUTEFPM

FEETFT

FOOT POUNDFT LB

GAUGEGA

GALLONGAL

GALLONS PER MINUTEGPM

GRAINSGR

HEATING COILHC

HEADHD

HORSEPOWERHP

HOT WATER RETURNHWR

HOT WATER SUPPLYHWS

INNER DIAMETERID

INCHESIN

KILOWATTKW

LEAVING AIR TEMPERATURELAT

POUNDSLBS

LINEAR FEETLF

LEAVING WATER TEMPERATURELWT

MIXED AIRMA

THOUSAND BTUS PER HOURMBH

MAKEUP AIRMUA

MAKEUP WATERMUW

MANUAL VOLUME DAMPERMVD

NEWN

NOT APPLICABLEN/A

NOISE CRITERIANC

NORMALLY CLOSEDNC

NATURAL GAS, HIGH PRESSURENGHP

NOT IN CONTRACTNIC

NORMALLY OPENNO

OUTSIDE AIROA

OUTSIDE DIAMETEROD

PUMPED CONDENSATEPCND

PRESSURE DIFFERENCEPD

ELECTRICAL PHASEPH

PARTS PER MILLIONPPM

POUNDS PER SQUARE FOOTPSF

POUNDS PER SQUARE INCHPSI

RETURN AIRRA

RELATIVE HUMIDITYRH

REVOLUTIONS PER MINUTERPM

SUPPLY AIRSA

SMOKE DAMPERSD

SAFETY FACTORSF

SPECIFIC GRAVITYSG

STATIC PRESSURESP

SQUARESQ

TEMPERATURE DIFFERENCETD

TOTAL STATIC PRESSURETSP

UNDERCUT DOORUC

UP THROUGH ROOFUTR

VOLTAGEV

VARIABLE AIR VOLUMEVAV

VELOCITY PRESSUREVP

VARIABLE REFRIGERANT VOLUME/FLOWVRV/F

VARIABLE VOLUME AND TEMPERATUREVVT

INCHES WATER COLUMNWC

EXISTING TO REMAINX

EXISTING TO BE DEMOLISHEDXD

EXISTING TO BE RELOCATEDXR

EXISTING REMOVED AND RELOCATEDXRR

AIR SYSTEM SYMBOLS

NEW SUPPLY DIFFUSER

NEW RETURN GRILLE

NEW SUPPLY DIFFUSER WITH BLANK OFF PANEL

NEW ROUND SUPPLY DIFFUSER

SURFACE MOUNTED SUPPLY GRILLE

DIRECTION OF AIRFLOW

MANUAL VOLUME DAMPER

FIRE DAMPER

SMOKE DAMPER

NEW DUCTWORK

EXISTING SUPPLY DUCTWORK TO REMAIN

EXISTING SUPPLY DUCTWORK TO BE DEMOLISHED

EXISTING SUPPLY DIFFUSER

EXISTING RETURN GRILLE

EXISTING EXHAUST GRILLE

NEW EXHAUST GRILLE

POINT OF CONNECTION

POINT OF DISCONNECTION

CONTROL DIAGRAM SYMBOLS

THERMOSTAT

TEMPERATURE SENSOR

HUMIDISTAT

EQUIPMENT SYMBOLS

ELECTRIC UNIT HEATER

ELECTRIC WALL HEATER

ELECTRICAL/CONTROL PANEL

PUMP

ELECTRIC CABINET HEATER

VARIABLE AIR VOLUME BOX

ANNOTATION SYMBOLS

NEW AIR DEVICE TAG

EQUIPMENT TAG

REVISION DELTA

KEY NOTE

EXISTING AIR DEVICE TAG

S = SUPPLY AIR

R = RETURN AIR

E = EXHAUST AIR

M = MAKE-UP AIR

T = TRANSFER AIR

X-###

PIPING SYMBOLS

VENTLESS PRESSURE REGULATOR

PIPE UP

PIPE DOWN

PIPE TEE DOWN

PIPE CONTINUATION

PIPE CAP

VALVE (REFER TO LABEL FOR TYPE)

CHECK VALVE

PRESSURE REDUCING VALVE

CONTROL VALVE

CONTROL VALVE (3-WAY)

CONTROL VALVE (4-WAY)

STRAINER

STRAINER WITH BLOW DOWN VALVE

PIPE UNION

SURFACE MOUNTED RETURN/EXHAUST GRILLE

NEW SUPPLY PIPING

NEW RETURN PIPING

X XXXX

X"

XXX-X

X

X

M

MF

S

T

S

H

X

X DETAIL/SECTION MARKDETAIL #

SHEET #

XXX

XXX

XXX ROOM TAG

M

GAS FIRED UNIT HEATER

CHILLED/HOT WATER COIL

ELECTRIC HEATING COIL

OPPOSED BLADE DAMPER

M PARALLEL BLADE DAMPER

T AVERAGING TEMPERATURE SENSOR

T BULB TEMPERATURE SENSOR

H HUMIDITY SENSOR

PIPING PITCH (POINTING DOWN)X%

A AIRFLOW MEASURING STATION

FAN

FILTER

DIRECTION OF FLOW

NEW LINEAR SLOT DIFFUSER

ACCESS DOOR/PANEL

DUCTWORK CONTINUATION

COMPRESSED AIRAIR

CONDENSATECND

DUAL TEMPERATURE WATER RETURNDTWR

DUAL TEMPERATURE WATER SUPPLYDTWS

INDUSTRIAL COOLING WATER RETURNICWR

INDUSTRIAL COOLING WATER SUPPLYICWS

LOW CONDUCTIVITY WATER RETURNLCWR

LOW CONDUCTIVITY WATER SUPPLYLCWS

NATURAL GAS, LOW PRESSURENGLP

NATURAL GAS, MEDIUM PRESSURENGMP

NITROGEN GASNIT

REFRIGERANTREFR

VACUUM AIRVAC

PROJECT NORTHPN

TRUE NORTHTN

TRITIATED CONDENSATETCND

CHILLED WATER PIPING

HYDRONIC HOT WATER PIPING

CONDENSER WATER PIPING

INDUSTRIAL COOLING WATER PIPING

LOW CONDUCTIVITY WATER PIPING

CONDENSATE DRAIN PIPING

DUAL TEMP WATER PIPING

LOW PRESSURE NATURAL GAS PIPING

MEDIUM PRESSURE NATURAL GAS PIPING

HIGH PRESSURE NATURAL GAS PIPING

DEMO SUPPLY PIPING

DEMO RETURN PIPING

EXISTING SUPPLY PIPING

EXISTING RETURN PIPING

VARIABLE FREQUENCY DRIVEVFD

VARIABLE SPEED DRIVEVSD

POND WATER RETURNPWR

POND WATER SUPPLYPWS

MOTORIZED DAMPERM

BALANCING VALVE

M-0REVISIONS

DATEREV. DESCRIPTIONS

SUBMITTED

APPROVED

CHECKED

DRAWN

DESIGNED

NAME

FERMI NATIONAL ACCELERATOR LABORATORY

DATE

SCALE:

DRAWING NO. REV.

UNITED STATES DEPARTMENT OF ENERGY

J an

0,

- 2

:4 5p m H

:\a ct iv e pr oj ec ts

\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m

\3 fin al d es ig n\

D ra w in gs \6

-1 0-

M

EC

H

AN

IC

AL

.d w g

Mu2e TARGET AIR

HANDLING & HEPA SYSTEM

6-10-29 1 J a n

A TAYLOR

A TAYLOR

L HAMMOND

J WILLS

J WILLS

1/26/24

1/26/24

1/26/24

1/26/24

1/26/24

MECH. COVER SHEET

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

E

PN TN

DUMP

D E F

ELEVATOR

MACHINE ROOM

TRUCK B

8" ø

5" ø

5" ø

8" ø

24"x34" 24"x44"

2 " G

2 1/2" CGS

2 1/2" CGR

M

REMOTE

HANDLING ROOM

16"Ø

"Ø

HEF-1

1500-E

PRODUCTION

SOLENOID AREA

DETECTOR

HALL

EXTINCTION

MONITOR ROOM

4" AIR SAMPLING

TUBE (TYP. ALL)

INSTALL SPACE DP

TRANSMITTERS AND HEPA DP

TRANSMITTER IN EXISTING

CONTROL RACK.

ROUTE NEW PRESSURE SENSOR

TUBING THROUGH EXISTING CONDUIT

PIPES. REFER TO SPECIFICATIONS FOR

PROPER TUBING MATERIALS.

ROUTE PRESSURE SENSOR

TUBING THRU PIPE CONDUIT

AND TERMINATE IN SPACE.

TERMINATE TUBING IN STAIRWELL

SPACE. SLEEVE PIPING THROUGH

METAL DOOR FRAME.

TERMINATE TUBING IN

ENCLOSURE SPACE.

TERMINATE TUBING IN REMOTE

HANDLING AREA.

ROUTE TUBING THROUGH

DUMP AND TERMINATE IN

EXTINCTION AREA.

TERMINATE TUBING IN

PRODUCTION SOLENOID AREA.

COORDINATE FINAL LOCATION OF

SOLENOID AREA WALL IN FIELD.

DIFF. PRESS. SENSORS

DETECTION SOLENOID AREA TO

PRODUCTION

SOLENOID AREA

EGRESS STAIRWELL TO

M-4 ENCLOSURE TO

REMOTE HANDLING AREA TO

EXTINCTION AREA TO

PROVIDE DIFFERENTIAL PRESSURE SENSORS

BETWEEN THE FOLLOWING AREAS:

INSTALL HEPA EXHAUST FAN

HEF-1 ABOVE MEZZANINE.

M4

TUNNEL

HEPA-1

ROUTE SAMPLING TUBE PIPING

AS HIGH IN SPACE AS POSSIBLE.

FOLLOW EXISTING PIPE

ROUTING WHERE POSSIBLE.

A B C D E F

LOWER LEVEL MECHANICAL PLAN

1/88" = 1'-0"

FIRST FLOOR MECHANICAL PLAN

1/88" = 1'-0"

ROUTE TUBING IN GAP

AROUND DUCT PRIOR

TO SEALING

A

INSTALL AIRFLOW MEASURING

STATION IN HORIZONTAL SECTION OF

DUCT. FOLLOW MANUFACTURER'S

STRAIGHT DUCT REQUIREMENTS.

ROUTE CONTROL WIRE UP TO

EQUIPMENT RACK ON MEZZANINE.

GENERAL NOTES

1. COORDINATE FINAL LOCATION OF ALL PRESSURE MONITORING

TUBING WITH EXISTING EXPERIMENTAL EQUIPMENT IN THE

FIELD.

TERMINATE EXHAUST DUCT IN

PRODUCTION SOLENOID AREA.

COORDINATE FINAL LOCATION OF

SOLENOID AREA WALL IN FIELD.

M-1REVISIONS

DATEREV. DESCRIPTIONS

SUBMITTED

APPROVED

CHECKED

DRAWN

DESIGNED

NAME

FERMI NATIONAL ACCELERATOR LABORATORY

DATE

SCALE:

DRAWING NO. REV.

UNITED STATES DEPARTMENT OF ENERGY

J an

0,

- 2

:4 6p m H

:\a ct iv e pr oj ec ts

\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m

\3 fin al d es ig n\

D ra w in gs \6

-1 0-

M

EC

H

AN

IC

AL

.d w g

Mu2e TARGET AIR

HANDLING & HEPA SYSTEM

6-10-29 1 J a n

A TAYLOR

A TAYLOR

L HAMMOND

J WILLS

J WILLS

1/26/24

1/26/24

1/26/24

1/26/24

1/26/24

MECHANICAL FLOOR PLANS

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

03300.A2

03300.A4

03300.A4

03300.A1

07131.A1

07131.A1

03300.A2

05521.A3

"Ø

16"Ø

HEPA-1

HEF-1

EXHAUST FAN SCHEDULE

TAG CFM ESP

(IN. WC)

FAN

RPM LwA

ELECTRICAL

MANUFACTUER MODEL WEIGHT REMARKS

VOLT-PH-HZ HP MOTOR

RPM

HEF-1 1500 2.5 3456 87 480-3-60 2 3600 AEROVENT CDD-12 306 ALL

REMARKS:

1 PROVIDE WITH ELASTOMERIC SPRING ISOLATORS.

HEPA FILTER UNIT SCHEDULE

TAG PRE-FILTER

EFF.

PRE-FILTER

DIMS

FINAL

FILTER

EFF.

FINAL FILTER

DIMS MANUFACTUER MODEL REMARKS

HEPA-1 MERV 8 24X24X2 HEPA 24X24X11.5 CAMFIL CF-2X1-212P-3FB-SS ALL

REMARKS:

1 PROVIDE WITH PRESSURE INDICATING TRANSMITTER GAUGE. LOCATE GAUGE ON RACK IN

MEZZANINE SPACE AS INDICATED ON FLOOR PLANS.

2 PROVIDE WITH 2 SPARE HEPA FILTERS, 2 SPARE MERV 8 PREFILTERS, AND 2 CHANGE-OUT BAGS

FOR EACH.

GRILLLE, REGISTER, & DIFFUSER SCHEDULE

TAG SERVICE FACE SIZE CONNECTION

STYLE MOUNTING DESCRIPTION MANUFACTURER MODEL REMARKS

E1 RETURN/

EXHAUST SEE PLANS RECT. SURFACE 35° DEFLECTION FIXED BLADE STEEL GRILLE TITUS 350RL ALL

REMARKS:

1 PROVIDE WITH BORDER TYPE 1NOT TO SCALE

PRESSURIZATION MONITORING SCHEMATIC

OPEN

ENDED

TUBE

TUBING

PRESSURE

TRANSDUCER

PRESSURA RPM-20

24v WIRING

OPEN

ENDED

TUBE

SPACE 1

SPACE 2 24v POWER

0-10v/4-20 mA

OUTPUT SIGNAL

24v POWER

24v POWER

M-2REVISIONS

DATEREV. DESCRIPTIONS

SUBMITTED

APPROVED

CHECKED

DRAWN

DESIGNED

NAME

FERMI NATIONAL ACCELERATOR LABORATORY

DATE

SCALE:

DRAWING NO. REV.

UNITED STATES DEPARTMENT OF ENERGY

J an

0,

- 2

:4 6p m H

:\a ct iv e pr oj ec ts

\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m

\3 fin al d es ig n\

D ra w in gs \6

-1 0-

M

EC

H

AN

IC

AL

.d w g

Mu2e TARGET AIR

HANDLING & HEPA SYSTEM

6-10-29 1 J a n

A TAYLOR

A TAYLOR

L HAMMOND

J WILLS

J WILLS

1/26/24

1/26/24

1/26/24

1/26/24

1/26/24

MECH. ELEVATIONS AND SCHEDULES

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

REMOTE

HANDLING AREA

HEF-1

PRODUCTION

SOLENOID AREA

RELOCATE EXISTING

EQUIPMENT DISCONNECT

FROM MEZZANINE DOWN TO

LOWER LEVEL.

A B C

LOWER LEVEL ELECTRICAL PLAN

1/88" = 1'-0"

CS-Mu2e-7 (EXISTING) 480V PHP-Mu2e-A1-7/9

WIRE STARTER TO HEF-1

3 #12 AWG, 1 #12 GND. IN 3 4"C

250A

TR-PHP-Mu2e-A1-7-A

75KVA

480-208Y/120 VAC

F

PP-Mu2e-A1-7-A1 225 A

208Y/120 VAC

3PH, 4W

MLO

PHP-Mu2e-A1-7 250 A

480/277 VAC

3PH, 4W

MLO

K-RATED

EXISTING DISTRIBUTION PANEL DHP-Mu2e-A1, 1200A, 480/277V, 3P, 4W, 65kAIC

LIFT

7.5 HP, 11 FLA

DS-LIFT

EF-T1

GRADE MOUNTED

3/4 HP, 1.6 FLA

30AF, NEMA 1, 3PH,

MC BEAMLINE

ENCLOSURES

WD-T1

WELDING

RECEPTACLE

MC BEAMLINE

ENCLOSURES

WD-T2

WELDING

RECEPTACLE

MC BEAMLINE

ENCLOSURES

MC BEAMLINE

ENCLOSURES

JJ

EUH-T1

ELECTRIC UNIT

MC BEAMLINE

EXIT STAIRS

7.5 kW, 9 FLA

EXHAUST FAN

HEATER

NF

J

#2 GND. DS-PP-Mu2e-A1-7-A1

200A/200AF

NEMA 1, 3PH

200 AMP, 277/480 VAC

TEMPORARY POWER FEED

FOR PANEL DHP-Mu2e-A1-7

15A

HEF-1

TRANSPORT

SOLENOID

AREA 013

2 HP, 480V, 3ɸ

CS-Mu2e-7

TRANSPORT

SOLENOID

AREA 013

HIGH POWER

PANELBOARD

MC BEAMLINE

ENCLOSURES

POWER

PANELBOARD

Mu2e LOWER LEVEL NEAR

TUNNEL STAIR 4DVP- 4 & 5

DIFFUSION VACUUM

PUMPS VHS-6 3HP 2.2

kW 208V, 1PH (EACH)

LOCATED IN RM. 015

NF

DS-DVP- 4 & 5

(2)30A, NEMA 1, 208V, 1PH

REMOTE HANDLING

RM 015

FUTURE

FUTURE

NF

DS-DVP- 1, 2, & 3

(3)30A, NEMA 1, 208V, 1PH

LOWER LEVEL ABOVE STAIR

DVP- 1, 2, & 3 DIFFUSION

VACUUM PUMPS VHS-6 3HP 2.2

kW 208V, 1PH (EACH) LOCATED

LOWER LEVEL ABOVE STAIR

SINGLE LINE DIAGRAM

1/88" = 1'-0"

RELOCATE EXISTING

COMBINATION STARTER

3 #12 AWG,

1 #12 GND.

IN 3 4"C

Average Est. Demand Amp per Ph:

Max. Connected Amp per Ph:

Total Est. Demand:

Total Conn. Load: 113272.8 VA

Panel Totals

TOTAL AMPS: 126 A 124 A 120 A

TOTAL LOAD: 34989.6 VA 34449.6 VA 33189.6 VA

16 SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA

15 SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA

HEPA FILTER FAN 3 150 A 15A 903.0 VA

8 EUH-T1 (ELECTRIC UNIT HEATER) 3 150 A 15 A 2491.0 VA 2491.0 VA 2491.0 VA

6 EF-T1 (EXHAUST FAN) 3 150 A 15 A 443.0 VA 443.0 VA 443.0 VA

SPARE 3 30 A 0.0 VA 0.0 VA 0.0 VA

4 LIFT 3 150 A 20 A 3045.0 VA 3045.0 VA 3045.0 VA

3 WD-T1 & WD-T2(WELDING... 3 150 A 60 A 13303.0 VA 13303.0 VA 13303.0 VA

2 SPARE 3 20 A 0.0 VA 0.0 VA 0.0 VA

PP-Mu2e-A1-7-A1 VIA TRANSFORMER 3 150 A 125 A 12313.6 VA 11773.6 VA 10513.6 VA

CKT Circuit Description POLES FRAME TRIP A B C Remarks

LUGS: PHASE / WIRE: 3PH,4W AIC RATING: 35,000A

MAINS TYPE: MLO VOLTS 480/277V 3PH,4W ENCLOSURE TYPE: TYPE 1

MAIN BREAKER: FEEDER SIZE: 4#250, 1#2G, 2 1/2"C MOUNTING: SURFACE

MAINS BUS RATING: 250 A FED FROM: DHP-Mu2e-A1 LOCATION: Mu2e LL near STR 4

POWER PANEL: PHP-Mu2e-A1-7

100972.4

121 A

RECEPTACLE LOAD

LIGHTING LOAD

EQUIPMENT LOAD

64.45% 100 %

Connected Load Demand Factor Estimated Demand

100 %

34600.8 73176

22300.4

136 A

903.0 VA 903.0 VA

73176

SPARE 3 60 A 0.0 VA 0.0 VA 0.0 VA

EUH-3 (ELECTRIC UNIT HEATER) 3 150 A 15 A 2491.0 VA 2491.0 VA 2491.0 VA

SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA

SPARE 1 20 A 0.0 VA 0.0 VA 0.0 VA

SPARE 1 100 A 20 A 0.0 VA 0.0 VA 0.0 VA

SPARE 3 30 A 0.0 VA 0.0 VA 0.0 VA

100 A

100 A

100 A

100 A

150 A

150 A

150 A

150 A

EX

IS

TI

N

G

PH

P- M u2 e-

A1 -7

E-1REVISIONS

DATEREV. DESCRIPTIONS

SUBMITTED

APPROVED

CHECKED

DRAWN

DESIGNED

NAME

FERMI NATIONAL ACCELERATOR LABORATORY

DATE

SCALE:

DRAWING NO. REV.

UNITED STATES DEPARTMENT OF ENERGY

J an

0,

- 2

:4 6p m H

:\a ct iv e pr oj ec ts

\6 \1 m uo n ca m pu s\ m u2 e ta rg et a ir ha nd lin g he pa s ys te m

\3 fin al d es ig n\

D ra w in gs \6

-1 0-

E

LE

C

TR

IC

AL

.d w g

Mu2e TARGET AIR

HANDLING & HEPA SYSTEM

6-10-29 1 J a n

R WIELGOS

A TAYLOR

R WIELGOS

J WILLS

J WILLS 1/26/24

1/26/24

1/26/24

1/26/24

1/26/24

ELECTRICAL PLANS

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

Sheets and Views
0 G-1
1 M-0
2 M-1
3 M-2
7 E-1

File details come from the government source that posted it. Updated .