About this file

This document is a preliminary conceptual site plan for a 911 Emergency On-Call Center project in Clarendon County, South Carolina, prepared by Alliance Consulting Engineers, Inc. The site plan covers a ±10-acre parcel and includes a proposed ±11,430-square-foot Community Family Resource Center building. The plan details the site layout, including a proposed stormwater basin, existing wetlands, and a 50-ft wetlands buffer. The parking area is designed with 34 total parking spaces, including 1 ADA-compliant spot per 25 spaces.

The site plan is situated near Manning High School and adjacent to existing businesses like High Tech Heating and Air, LLC. The proposed development includes specific site measurements, such as a 15-ft setback, 90-ft and 127-ft dimensions, and a proposed stop sign and stop bar on Commerce Street. The plan incorporates environmental considerations with the wetlands buffer and stormwater management, and shows careful site positioning relative to existing infrastructure and neighboring properties. The document is marked as preliminary and uses topographical information from the South Carolina Department of Natural Resources, dated 2016.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

PL

4 12

8 12

Conceptual Site Plan Option A 911 Emergency On-Call Center

± 10-Acre Parcel Clarendon County, South Carolina( IN FEET ) Prepared by:

Alliance Consulting Engineers, Inc.

N

Ju ly

4,

- 3

:4 8:

P

M P

:\P ro po sa l F ile s\ P2

-C D es ig n Sv cs P ro po se d

Em er ge nc y O n- C al l 9

C nt r C ity o f M an ni ng

C la re nd on C o\ dw g\ P

- C on ce pt ua l S ite

P la n A.

dw g

Project No.: P23077-C August 1, 2023

Documents prepared or furnished by Alliance Consulting Engineers, Inc. are instruments of service, and Alliance Consulting Engineers, Inc. retains an ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the project is completed.

PRELIMINARY

MANNING HIGH SCHOOL

COMMUNITY FAMILY RESOURCE CENTER

PROPOSED

±11,430-SF

BUILDING

HIGH TECH HEATING AND AIR, LLC

COMMERCE S

TR

EET

COMMERCE STREET

CAPITAL W

AY

PROPOSED

STOP SIGN

AND STOP BAR

-F

T

SE

TB

AC

K

90-FT

7-

FT

24-FT

10-FT24

-F

T

20-FT 5-

FT

0.9-Acre Wetland Area (Wetland Delineation Dated: June 30, 2023)

-F

T W

ET

LA

ND

S

BU

FF

ER

EXISTING WETLANDS

PROPOSED SIDEWALK

PROPOSED STORMWATER

BASIN

PROPOSED BUILDING

PROPOSED ASPHALT

LEGEND

PROPOSED STORMWATER

BASIN

REFERENCES:

1. REFERENCE IS MADE TO TOPOGRAPHICAL INFORMATION PROVIDED BY SOUTH CAROLINA

DEPARTMENT OF NATURAL RESOURCES (SCDNR) GIS DATA RESOURCES AERIAL LIDAR

DATA. DATED: 2016

2. CONTOUR INTERVALS: 10-FT

AutoCAD SHX Text

STOP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
Site Plan

File details come from the government source that posted it. Updated .