Exhibit_Drawing_Waterbar Cleaning_991.pdf

PDF 201 KB Posted

Attached to
Trail Maintenance North & Central Zones, Nez Perce-Clearwater National Forests
Solicitation number
1284LL21Q0023
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: 1284LL21Q0023 / Trail Maintenance – North & Central Zones / Nez Perce-Clearwater N.F.

Exhibit – Waterbar Cleaning Section 991.05 / Page 1 of 1

Waterbar Cleaning- Section 991.05

Remove all sediment and debris until ditch or spillway meets existing side slope (daylight) Relax all cut slopes to 60 deg. or less

Apron

12 in. minimum ditch width

Maintain sustained negative grade throughout entire drain. Remove all vegetation from structure

Loose rock, woody debris, sediment

Retain 4 – 6 in. soil sloped against bar

Minimum 4 in. depth

Woody materials will be removed from trail tread

Place soil, sod, duff, sediment, loose rock on downgrade side and compact

File details come from the government source that posted it. Updated .