About this file

This document is a Contract Data Requirements List (CDRL) specifying 20 data items to be delivered under a federal contract for the load, assembly and packing of 105mm projectile gun unit cartridges and M1 high explosive cartridges. Key details include:

  • The CDRL identifies requirements for items such as a Quality Program Plan, Critical Characteristics Control Plan, Process Control Plan, various test and inspection reports, and an Ammunition Data Card to be submitted via the Worldwide Ammunition Data Repository Program. Submission due dates and approval processes are provided.

  • Other required submissions cover areas like critical non-conformances, defect investigations, engineering change proposals, packaging tests, and measurement system evaluations. Distribution lists are included to specify contacts at the Procuring Contracting Office and Joint Munitions Command.

  • Submission methods involve either email using specified subject lines linking to the CDRL, or the Department of Defense's Secure Access File Exchange system. Standard formats like Microsoft Office and PDF are usually required.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR D. SYSTEM/ITEM

M1 HE Comp B

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

FCDD-ACE-SP

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION

STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS.

DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE

DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING,

THEN THE WHOLE SUBMITTAL WILL BE LABELED "D".

THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1694 LOCATED

AT www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; COPY FURNISH

THIS SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

17 Nov 2021

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 8 Pages

G. PREPARED BY

K. Mosher for SDMO, FCDD-ACE-SP

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR D. SYSTEM/ITEM

M1 HE Comp B

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80639D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

FCDD-ACE-SP

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION

STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS.

DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE

DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING, THEN

THE WHOLE SUBMITTAL WILL BE LABELED "D".THE PREFERRED METHOD

FOR SUBMITTAL IS DD FORM 1692 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

17 Nov 2021

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 2 of 8 Pages

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 8 Pages

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR D. SYSTEM/ITEM

M1 HE Comp B

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

NOTICE OF REVISION (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80642D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

FCDD-ACE-SP

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION

STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS.

DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE

DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING, THEN

THE WHOLE SUBMITTAL WILL BE LABELED "D". THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1695 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

17 Nov 2021

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 4 of 8 Pages

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR D. SYSTEM/ITEM

M1 HE Comp B

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Operations Security (OPSEC) Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-MGMT-80934C

5. CONTRACT REFERENCE

OPSEC SOW

6. REQUIRING OFFICE

AMSJM-FP/G2

7. DD 250 REQ.

XX

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

ASREQ

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT

CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS

OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT

REVIEW AND APPROVAL. 30 CALENDAR DAYS AFTER THE

CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN CRITICAL

INFORMATION (CI)/THREAT INFORMATION. RESUBMIT 10

CALENDAR DAYS AFTER GOVERNMENT REVIEW. SUBMIT

ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.

JMC OPSEC 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

17 Nov 2021

I. APPROVED BY J. DATE

1. DATA ITEM NO.

A005

17. PRICE

GROUP

18. ESTIMATED

TOTAL PRICE

XX

8. APP CODE

0 1 0

Page: 5 of 8DD Form 1423-1, FEB 2001 Previous editions may be used.

15. TOTAL

G. PREPARED BY

Drew Smith, FCDD-ACE-SC

H. DATE I. APPROVED BY J. DATE

A N/A Reg Repro N/A

16. REMARKS

SUBMIT PROCEDURE FOR APPROVAL 60 DAYS PRIOR TO FIRST ARTICLE TEST OR PRODUCTION IF FIRST

ARTICLE IS NOT APPLICABLE. ALLOW 28 DAYS FOR APPROVAL/DISAPPROVAL THROUGH THE

CONTRACTING OFFICER. SUBMIT ELECTRONICALLY TO usarmy.ria.ardec.mbx.ri-corrosion-team@mail.mil. CONTRACTOR SHALL RESUBMIT WITH GOVERNMENT REVISIONS WITHIN 10 DAYS.

RDAR-MEE-W(R) SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO CONTRACTING OFFICER.

COATED PANELS PER PARA 3.2.2 SHALL INCLUDE THREE WITH PHOSPHATE ONLY, THREE WITH

PHOSPHATE AND PRIMER, AND THREE WITH PHOSPHATE, PRIMER AND TOP COAT. A DD FORM 250 IS

NOT REQUIRED FOR PHOSPHATE COATING PROCEDURAL APPROVAL. CONTRACTOR FORMAT

ACCEPTABLE. WRITTEN PROCEDURES SHALL BE SUBMITTED USING A PC COMPATIBLE FORMAT (I.E. PDF, RICH TEXT FORMAT (RTF), OR WORD FILE).

THE PANELS SHALL BE MAILED TO THE

FOLLOWING ADDRESS:

Combat Capabilities Development Command Armaments Center Attn: FCDD-ACE-QP/Mark Godlewski 1 Rock Island Arsenal Bldg. 62 2nd Floor, NW Wing Rock Island, IL 61299-7300

FCDD-ACE-QP

N/A

ONE/R ASREQ

a. ADDRESSEE

b. COPIES

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

7. DD 250 REQ

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80603A TT-C-490, TYPE 1, PARAS 3.2.1, 3.2.2 FCDD-ACE-QP

2. TITLE OF DATA ITEM 3. SUBTITLE

TEST PROCEDURE-PHOSPHATE COATING PRE-PRODUCTION PROCEDURE

TDP____________ TM____________ OTHER____________

D. SYSTEM/ITEM

M1 HE Comp B

E. CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

Form Approved OMB No. 0704-0188

17. PRICE

GROUP1. DATA ITEM NO.

A006

18. ESTIMATED

TOTAL PRICE

NO

8. APP CODE

0 1 0

Page: 6 of 8DD Form 1423-1, FEB 2001 Previous editions may be used.

15. TOTAL

H. DATE I. APPROVED BY J. DATE

N/A N/A Reg Repro

ASREQ

16. REMARKS

DUE TO BEGIN 30 DAYS AFTER PRODUCTION COMMENCES

FREQUENCY: 3 WORKING DAYS FOLLOWING REPORTING MONTH

SHALL BE SUBMITTED IN ELECTRONIC FORMAT AND INCLUDE AT A MINIMUM:

DESCRIPTION/NSN OF GFM

TOTAL OF GFM REQUIRED VS. TOTAL DELIVERED AS OF THE CURRENT MONTH

RECEIPTS: CUMULATIVE VS. CURRENT MONTH

CONSUMED: CUMULATIVE VS. CURRENT MONTH

REJECTED/DAMAGED MATERIAL: LOT NUMBERS AND SERIAL NUMBERS OF GFM

LAP CLINS: CONTRACT QUANTITY VS. DELIVERED QUANTITY

THIS INFORMATION SHOULD BE PROVIDED FOR EACH DELIVERY ORDER

SUBMIT ELECTRONICALLY TO THE PCO, OTHER DISTRIBUTION WILL BE DISCUSSED AFTER AWARD OF

REQUIREMENT.

FORMAT AND CONTENT WILL BE APPROVED THROUGH PCO

PRODUCTION MANAGER

PCO

N/A

MTHLY ASREQ

a. ADDRESSEE

b. COPIES

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

7. DD 250 REQ

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80438B

5. CONTRACT REFERENCE

FAR PART 45

6. REQUIRING OFFICE

JMC MLRC

2. TITLE OF DATA ITEM 3. SUBTITLE

GOVERNMENT FURNISHED MATERIEL (GFM) CONSUMPTION REPORT CONSUMPTION REPORT

TDP____________ TM____________ OTHER____________

CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

Form Approved OMB No. 0704-0188

G. PREPARED BY

Michelle Vetter

E. D. SYSTEM/ITEM

M1 HE Comp B

0 2 0

0 1 0

1. DATA ITEM NO.

17. PRICE

GROUP

A007

18. ESTIMATED

TOTAL PRICE

LT

8. APP CODE

0 1 0

0 1 0

Page: 7 of 8DD Form 1423-1, FEB 2001 Previous editions may be used.

15. TOTAL

G. PREPARED BY

K. Mosher for SDMO, FCDD-ACE-SP

H. DATE

17 Nov 2021

I. APPROVED BY J. DATE

FCDD-ACE-LTP

N/A N/A Reg Repro

ASREQ

16. REMARKS

30 DAYS PRIOR TO FIRST ARTICLE TEST. REPORT TITLE SHALL INCLUDE ITEM NAME AND MODEL

NUMBER OF THE AMMUNITION THAT GOES INTO THE PACKAGE. IF ITEM IS A COMPONENT OF

AMMUNITION, THE AMMUNITION SYSTEM THAT THE ITEM IS USED ON SHALL ALSO BE INCLUDED.

REPORT SHALL BE SUBMITTED ELECTRONICALLY VIA E-MAIL TO

YUEN.H.LAM.CIV@ARMY.MIL AND DAVID.M.WALLS1.CIV@ARMY.MIL SAVED IN RICH TEXT

FORMAT (RTF), ASCII OR PDF FORMAT. SUBMIT EVERY TWO (2) YEARS.

CCDC ARM CTR PACKAGING

N/A

ASREQ ASREQ

a. ADDRESSEE

b. COPIES

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

7. DD 250 REQ

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

5. CONTRACT REFERENCE

4. AUTHORITY (Data Acquisition Document

No.)

DI-PACK-81059B SECTION D

6. REQUIRING OFFICE

FCDD-ACE-LTP (RI)

2. TITLE OF DATA ITEM

Performance Oriented Packaging (POP) Test Report

3. SUBTITLE

TDP____________ TM____________ OTHER____________

D. SYSTEM/ITECTG

M1 HE Comp B

E. CONTRACT / PR NO.

HH1Z0321M2

F. CONTRACTOR

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

Form Approved

OMB No. 0704-0188

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

A008

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A009

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A010

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A011

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A012

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A013

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A014

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A015

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A016

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A017

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A018

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A019

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A020

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A021

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A022

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A023

QA CDRL Distribution block - IPT members list Distribution with specific contact information will be provided at Post Award

PQM – Product Quality Manager

PCO – Procuring Contracting Officer

CS – Contract Specialist

QAR – Quality Assurance Representative

PO or PM – Project Officer or Project Manager

AQE – Army Quality Engineer

APO - Army Lead Engineer (Project Officer)

DA – Design Agent (NAVSEA)

PL – Project Lead (NAVAIR)

NQA – Navy Quality Assurance

ME – Material Engineer (NAVAIR)

PE – Program Engineer (Air Force)

AEA – Acquisition Engineering Agent (NAVSEA) GE – Gage Engineer

Production Manager, JMC - Production Manager, Joint Munitions Command

MCEA – Marine Corp Engineering Activity

CDM – Configuration/Data Management (NAVAIR)

WARP - Worldwide Ammunition-Data Repository Program

SAFE - Safe Access File Exchange

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM -

Technical Manual; Other - other category of data, such as

"Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of

CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the

Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items

12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The

Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK)

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the

Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form

1423.

INSTRUCTIONS FOR COMPLETING DD FORM 1423

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form

1423.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the

Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD

Form 1423 at no cost.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the

Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .