This document is a Bill of Quantities (BOQ) for the construction of a 2-story barracks building in Palawan, Philippines under Solicitation N6274224R6718 issued by the Department of the Navy Naval Facilities Engineering Command.
The BOQ lists detailed line items and quantities for the major building components and systems, including foundation, superstructure, exterior enclosure, roofing, interior construction, plumbing, HVAC, electrical, site preparation, and furnishings. It also includes pricing for field requirements, office overhead, and profit. A separate section covers furniture, fixtures, and equipment for the fitness gym, laundry, VIP rooms, barracks, conference room, and administrative areas. An additional CLIN is included for a complete solar panel system. The total estimated cost for the full project is provided. The solicitation states that an organized Pre-Proposal Site Visit is scheduled for July 15, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RELEASED AMD1_24R6718.pdf | ||
| Released RFP_24R6718.pdf | ||
| Exhibit A_PPI_Fillable.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOQ
| BILL OF QUANTITIES | |||||||||||
| QUANTITY | MATERIAL COST | LABOR & OTHER INCIDENTAL | TOTAL ESTIMATE | ||||||||
| NUMBER | UNIT | UNIT COST | TOTAL (USD) | UNIT COST | TOTAL (USD) | UNIT COST | Total USD | ||||
| CLIN 0001 | Construct 2 Storey Barracks | ||||||||||
| A10 | FOUNDATION | ||||||||||
| 1 | A1010 | Footings (Concrete) | Cu.M. | ||||||||
| 2 | Footings (Rebar) | Kgs. | |||||||||
| 3 | Footing Tie Beams (Concrete) | Cu.M. | |||||||||
| 4 | Footing Tie Beams (Rebars) | Kgs. | |||||||||
| 5 | A1020 | Slab on Fill (Concrete) | Cu.M. | ||||||||
| 6 | Slab on Fill (Rebar) | Kgs. | |||||||||
| B10 | SUPERSTRUCTURE | ||||||||||
| 7 | Column (Concrete) | Cu.M. | |||||||||
| 8 | Column (Rebars) | Kgs. | |||||||||
| 9 | Second Floor & Roof Beams (Concrete) | Cu.M. | |||||||||
| 10 | Second Floor & Roof Beams (Rebars) | Kgs. | |||||||||
| 11 | Second Floor Slab (Concrete) | Cu.M. | |||||||||
| 12 | Second Floor Slab (rebars) | Kgs. | |||||||||
| 13 | Stairs (Concrete) Interior | Cu.M. | |||||||||
| 14 | Stairs (rebars) Interior | Kgs. | |||||||||
| 15 | Stairs (Concrete) Exterior | Cu.M. | |||||||||
| 16 | Stairs (rebars) Exterior | Kgs. | |||||||||
| 17 | Stairs (rebars) Exterior | LOT | |||||||||
| 18 | Perimeter walkway | SM | |||||||||
| 19 | Construct reinforced concrete water tower. Provide hot dip | ||||||||||
| galvanized safety cage ladder and railings for safety and maintenance. | LOT | ||||||||||
| B20 | EXTERIOR ENCLOSURE | ||||||||||
| MASONRY | |||||||||||
| 20 | CHB 6" (includes concrete railing for Drying area) | SM | |||||||||
| 21 | Plastering | SM | |||||||||
| 22 | Masonry Reinforcements | Kgs. | |||||||||
| B2010 | EXTERIOR WALLS | ||||||||||
| 23 | B201009 | Exterior Painting | SM | ||||||||
| B2020 | Windows ((6mm thick, tinted glass brown, inclusive of screen and |
security bars)
| 24 | W1 (2.8Mx1.2M sliding with fixed panel) | EA | |
| 25 | W2 (2.1Mx1.2M sliding with fixed panel) | EA | |
| 26 | W3 (1.4Mx1.2M sliding with fixed panel) | EA | |
| 27 | W4 (2.1Mx2.8M Awning with fixed panels) | EA | |
| 28 | W5 (0.5mx0.4m, Awning) | EA | |
| 29 | W6 (2.8Mx0.4M Awning) | EA | |
| 30 | W7 (3.5Mx0.4M Awning) | EA | |
| B2030 | Exterior Doors (including Jambs and Hardware - Hinges & Door |
Locks)
| 31 | D1 (1.70Mx2.10M-Steel Door Insulated Heavy Duty) | EA | ||
| 32 | D5 (0.90Mx2.10M-Steel Core Metal Door Swing out w/ Panic | |||
| Hardware device, kick plate & door closer) | EA | |||
| 33 | D7 (1.20Mx2.10M-Hollow Core Metal Door Full Louver) | EA | ||
| 34 | D8 (0.80Mx2.10M-Hollow Core Metal Door Full Louver) | EA | ||
| B30 | ROOFING | |||
| 35 | B3010 | Steel Trusses & Purlins | SM | |
| 36 | Rockwool Insulation R-19 | SM | ||
| 37 | Roofing (Pre-painted metal roofing) | SM | ||
| 38 | 3" X 15M. Aluminum Duct Tape | EA | ||
| 39 | Ga.24 Stainless Steel Spanish Gutter | LM | ||
| 40 | Ga. 24 Stainless Steel Ridge Roll | LM | ||
| 41 | Polycarbonate roofing on metal Frames (for Balcony) | EA | ||
| 42 | Concrete canopy over ground floor exterior doors & windows | LOT | ||
| C10 | INTERIOR CONSTRUCTION | |||
| C1010 | Partitions | |||
| 43 | CHB 4" | SM | ||
| 44 | Plastering | SM | ||
| 45 | Masonry Reinforcements | Kgs. | ||
| 46 | Stairs Handrails & Guardrails (Interior) | LOT | ||
| 47 | Stairs Handrails & Guardrails (Exterior) | LOT | ||
| 47 | 1-1/4" Brass Stair nosing | EA | ||
| 48 | Window Blinds | LOT | ||
| C1020 | Interior Doors | |||
| 49 | D2 (1.70Mx2.10M-Hollow Core Metal Door) | EA | ||
| 50 | D3 (0.80Mx2.10M-Solid Core Flush Wood Door Premium Grade) | EA | ||
| 51 | D4 (0.90Mx2.10M- Solid Core Flush Wood Door Premium Grade, | |||
| kick plate, door closer) | EA | |||
| 52 | D6 (0.70Mx2.10M-Solid Core Flush Wood Door w/ louver Premium | |||
| Grade) | EA | |||
| 53 | D9 (0.80Mx2.10M-Hollow Core Metal Door) | EA | ||
| C30 | INTERIOR FINISHES | |||
| C3010 | Wall Finishes: | |||
| 54 | 150mm x 150mm Glass blocks | EA | ||
| 55 | .40x.40 Ceramic Tiles for VIP room Toilets and Latrines Walls | SM | ||
| 56 | C3040 | Painting | SM | |
| C3020 | Floor Finishes: | |||
| 57 | Polished concrete floor finish | SM | ||
| 58 | Non skid Tiles for Stairs and Stair Landings | SM | ||
| 59 | .40x.40 Ceramic Tiles for VIP room Toilets and Latrines Flooring | SM | ||
| 60 | Rubber Matting for Fitness Gym | SM | ||
| C3030 | Ceiling: | |||
| 61 | Ficem Boards on Metal Furring's | SM | ||
| 62 | Colored Spandrel on Metal Furrings (Eaves) | SM | ||
| D20 | PLUMBING | |||
| Provide complete water distribution system to bring water to the |
building
| 63 | New Waterline Connection (Pipes, Valves & Accessories) | LOT | ||
| 64 | Construct new water cistern (5,000 Liters) | LOT | ||
| 65 | Modular Stainless steel tank (5,000 Li) | LOT | ||
| 66 | Connect to existing water well, provide new pump | LOT | ||
| 67 | Booster Pump 2 HP and piping accessories | EA | ||
| D2010 | Plumbing Fixtures | |||
| 68 | Water Closet with Bidet | EA | ||
| 69 | Urinal | EA | ||
| 70 | Shower assembly | EA | ||
| 71 | Portable Water Heater | EA | ||
| 72 | Lavatory | EA | ||
| 73 | Cabinet with Mirror | EA | ||
| 74 | Slop Sink | EA | ||
| 75 | Toilet Paper Holders | EA | ||
| 76 | Soap Holders | EA | ||
| 77 | CHB Toilet Partitions including doors (men's and Ladies Barracks) | EA | ||
| 78 | Privacy Partition for Urinals | EA | ||
| D2030 | Site Drainage/Waste Water System | |||
| 79 | Septic Tank with Leech Field | LOT | ||
| D2040 | Storm and Drainage Pipes | |||
| 80 | Storm and Drainage Pipes | LOT | ||
| D30 | HVAC: | |||
| 81 | Aircon 1.5 HP For VIP Rooms | EA | ||
| 82 | Aircon 2 HP for Conference Room | EA | ||
| 83 | Aircon 1 HP for Storage Room | EA | ||
| 84 | Aircon 3 Tonner for Fitness Gym | EA | ||
| 85 | Ceiling Fans | EA | ||
| 86 | Exhaust Fans | EA | ||
| D40 | FIRE PROTECTION: | |||
| 87 | D4010 | Smoke Detector | EA | |
| 88 | Fire Alarm & Manual Pull Station | EA | ||
| 89 | Fire Exit Signage | EA | ||
| 90 | Fire extinguisher with Cabinets | EA | ||
| 91 | 20-lb Portable Fire Extinguisher with Built-in Sprinkler ceiling | |||
| mounted for the storage room | EA | |||
| 92 | Fire Exit Ladder | EA | ||
| D50 | ELECTRICAL: | |||
| 93 | D5010 | Electrical Rough-ins | SM | |
| 94 | Wirings | SM | ||
| 95 | Panel boards | EA | ||
| 96 | Fixtures and Wiring Devices | LOT | ||
| 97 | Distribution Cable | LS | ||
| 98 | Emergency Lights | EA | ||
| 99 | Generator Set (50 KVA Diesel silent type) | EA | ||
| 100 | Transformer | LS | ||
| 101 | Electrical Post and Metering | LS | ||
| 102 | D5090 | Grounding and Lightning Arrester | EA | |
| E20 | FURNISHINGS | |||
| 103 | Provide and install water filtration system (incl. storage tanks, | |||
| pumps, valve and all accessories) including shed | LOT | |||
| G10 | SITE PREPARATION | |||
| G1010 | Site Clearing | |||
| 104 | Clearing, grubbing and tree-cutting | SM | ||
| G1030 | Site Earthwork | |||
| 105 | Fill | CU.M. | ||
| 106 | Excavation | CU.M. | ||
| 107 | Soil Treatment | SM | ||
| G20 | Site Improvement | |||
| 108 | Gravel Cover at Open area (3" thick of 3/4" gravel) | SM | ||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | |||
| X10 | FIELD REQUIREMENTS | |||
| 109 | Mobilization | LS | ||
| 110 | Demobilization | LS | ||
| 111 | Project Management,: Supervision, QC, Safety | Months | ||
| 112 | Design, Construction Plans, Closeout Requirements | LS | ||
| 113 | Rendering | LS | ||
| 114 | Training, O&M Manuals, As-Built | LS | ||
| X20 | OFFICE OVERHEAD | |||
| 115 | TempFacil, permits, and utilities months, formworks, Field Office, | |||
| Portalet,Environment Protection, Clean-Up | Months | |||
| TOTAL FOR CLIN 0001 | ||||
| CLIN 0002 | FURNITURE, FIXTURES & EQUIPMENTS | |||
| E20 | FURNISHINGS: | |||
| Fitness Gym | ||||
| 116 | Eliptical Trainer - commercial use | EA | ||
| 117 | Treadmill - commercial use | EA | ||
| 118 | Stair Climber - commercial use | EA | ||
| 119 | Smith Weight machine w/ flat bench- commercial use | EA | ||
| 120 | Exercise Bike - commercial use | EA | ||
| 121 | Dumbbell package w/ rack | EA | ||
| 122 | Weighing Scale - commercial scale | EA | ||
| 123 | 55 inch. Smart TV | EA | ||
| 124 | Receiving Counter | EA | ||
| 125 | Swivel Chair | EA | ||
| Laundry Room | ||||
| 126 | Washers | EA | ||
| 127 | Dryers | EA | ||
| 128 | Table for folding clothes with built-in cabinet (for laundry | |||
| Detergent & Hangers) | EA | |||
| 129 | Wooden Chair | EA | ||
| Drying Area | ||||
| 130 | Clothesline | EA | ||
| VIP ROOMS | ||||
| 131 | Tables with drawers | EA | ||
| 132 | Wooden Chair | EA | ||
| 133 | Wardrobe Cabinets | EA | ||
| 134 | Full Size Bed | EA | ||
| 135 | 8" Matress, Pillows and Linens | EA | ||
| MALE BARRACKS | ||||
| 136 | Double Bunk Bed | EA | ||
| 137 | 4" Mattress, Pillows and Linens | EA | ||
| 138 | Metal Lockers | EA | ||
| LATRINE | ||||
| 139 | Cabinet for Storage of Cleaning tools and supply | EA | ||
| CONFERENCE ROOM | ||||
| 140 | Conference Table (for 14 seats) wooden | EA | ||
| 141 | Executive Chairs | EA | ||
| 142 | 75" LED Smart TV | EA | ||
| 143 | Projector | EA | ||
| 144 | Mechanized Pull Down Projector Screen | EA | ||
| 145 | Audio Visual System | EA | ||
| ADMIN. ROOM | ||||
| 146 | Tables with drawers | EA | ||
| 147 | Swivel ChaIrs with arm | EA | ||
| 148 | Office Cabinets | EA | ||
| STORAGE ROOM | ||||
| 149 | 5 Level Metal shelves (40cmx120cmx185cm) | EA | ||
| RECEIVING AREA | ||||
| 150 | Receiving Counter | EA | ||
| 151 | High Chair without arm | EA | ||
| 152 | Living Room Set (3 seater, 2 seater & Center Table) | EA | ||
| TOTAL FOR CLIN 0002 | ||||
| CLIN 0003 | PROVIDE & INSTALL SOLAR PANEL SYSTEM | |||
| E20 | FURNISHINGS | |||
| 153 | Provide and install complete Solar Panel System package | LOT | ||
| TOTAL FOR CLIN 0003 | ||||
| TOTAL COST OF PROJECT |
| NOTE: | 1. Add items as necessary which are not listed above. |
| 2. Do not change unit of measurements | |
| 3. Provide cost only for numbered items 1 to 153 and any items added. |
File details come from the government source that posted it. Updated .