This document is a Bill of Quantities (BOQ) for the construction of a 2-story barracks building in Palawan, Philippines under Solicitation N6274224R6718 issued by the Department of the Navy Naval Facilities Engineering Command.

The BOQ lists detailed line items and quantities for the major building components and systems, including foundation, superstructure, exterior enclosure, roofing, interior construction, plumbing, HVAC, electrical, site preparation, and furnishings. It also includes pricing for field requirements, office overhead, and profit. A separate section covers furniture, fixtures, and equipment for the fitness gym, laundry, VIP rooms, barracks, conference room, and administrative areas. An additional CLIN is included for a complete solar panel system. The total estimated cost for the full project is provided. The solicitation states that an organized Pre-Proposal Site Visit is scheduled for July 15, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to D/B Construction of Barracks, Palawan, Philippines, newest first.
File Type Posted
RELEASED AMD1_24R6718.pdf PDF
Released RFP_24R6718.pdf PDF
Exhibit A_PPI_Fillable.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOQ

BILL OF QUANTITIES
QUANTITYMATERIAL COSTLABOR & OTHER INCIDENTALTOTAL ESTIMATE
NUMBERUNITUNIT COSTTOTAL (USD)UNIT COSTTOTAL (USD)UNIT COSTTotal USD
CLIN 0001Construct 2 Storey Barracks
A10FOUNDATION
1A1010Footings (Concrete)Cu.M.
2Footings (Rebar)Kgs.
3Footing Tie Beams (Concrete)Cu.M.
4Footing Tie Beams (Rebars)Kgs.
5A1020Slab on Fill (Concrete)Cu.M.
6Slab on Fill (Rebar)Kgs.
B10SUPERSTRUCTURE
7Column (Concrete)Cu.M.
8Column (Rebars)Kgs.
9Second Floor & Roof Beams (Concrete)Cu.M.
10Second Floor & Roof Beams (Rebars)Kgs.
11Second Floor Slab (Concrete)Cu.M.
12Second Floor Slab (rebars)Kgs.
13Stairs (Concrete) InteriorCu.M.
14Stairs (rebars) InteriorKgs.
15Stairs (Concrete) ExteriorCu.M.
16Stairs (rebars) ExteriorKgs.
17Stairs (rebars) ExteriorLOT
18Perimeter walkwaySM
19Construct reinforced concrete water tower. Provide hot dip
galvanized safety cage ladder and railings for safety and maintenance.LOT
B20EXTERIOR ENCLOSURE
MASONRY
20CHB 6" (includes concrete railing for Drying area)SM
21PlasteringSM
22Masonry ReinforcementsKgs.
B2010EXTERIOR WALLS
23B201009Exterior PaintingSM
B2020Windows ((6mm thick, tinted glass brown, inclusive of screen and

security bars)

24W1 (2.8Mx1.2M sliding with fixed panel)EA
25W2 (2.1Mx1.2M sliding with fixed panel)EA
26W3 (1.4Mx1.2M sliding with fixed panel)EA
27W4 (2.1Mx2.8M Awning with fixed panels)EA
28W5 (0.5mx0.4m, Awning)EA
29W6 (2.8Mx0.4M Awning)EA
30W7 (3.5Mx0.4M Awning)EA
B2030Exterior Doors (including Jambs and Hardware - Hinges & Door

Locks)

31D1 (1.70Mx2.10M-Steel Door Insulated Heavy Duty)EA
32D5 (0.90Mx2.10M-Steel Core Metal Door Swing out w/ Panic
Hardware device, kick plate & door closer)EA
33D7 (1.20Mx2.10M-Hollow Core Metal Door Full Louver)EA
34D8 (0.80Mx2.10M-Hollow Core Metal Door Full Louver)EA
B30ROOFING
35B3010Steel Trusses & PurlinsSM
36Rockwool Insulation R-19SM
37Roofing (Pre-painted metal roofing)SM
383" X 15M. Aluminum Duct TapeEA
39Ga.24 Stainless Steel Spanish GutterLM
40Ga. 24 Stainless Steel Ridge RollLM
41Polycarbonate roofing on metal Frames (for Balcony)EA
42Concrete canopy over ground floor exterior doors & windowsLOT
C10INTERIOR CONSTRUCTION
C1010Partitions
43CHB 4"SM
44PlasteringSM
45Masonry ReinforcementsKgs.
46Stairs Handrails & Guardrails (Interior)LOT
47Stairs Handrails & Guardrails (Exterior)LOT
471-1/4" Brass Stair nosingEA
48Window BlindsLOT
C1020Interior Doors
49D2 (1.70Mx2.10M-Hollow Core Metal Door)EA
50D3 (0.80Mx2.10M-Solid Core Flush Wood Door Premium Grade)EA
51D4 (0.90Mx2.10M- Solid Core Flush Wood Door Premium Grade,
kick plate, door closer)EA
52D6 (0.70Mx2.10M-Solid Core Flush Wood Door w/ louver Premium
Grade)EA
53D9 (0.80Mx2.10M-Hollow Core Metal Door)EA
C30INTERIOR FINISHES
C3010Wall Finishes:
54150mm x 150mm Glass blocksEA
55.40x.40 Ceramic Tiles for VIP room Toilets and Latrines WallsSM
56C3040PaintingSM
C3020Floor Finishes:
57Polished concrete floor finishSM
58Non skid Tiles for Stairs and Stair LandingsSM
59.40x.40 Ceramic Tiles for VIP room Toilets and Latrines FlooringSM
60Rubber Matting for Fitness GymSM
C3030Ceiling:
61Ficem Boards on Metal Furring'sSM
62Colored Spandrel on Metal Furrings (Eaves)SM
D20PLUMBING
Provide complete water distribution system to bring water to the

building

63New Waterline Connection (Pipes, Valves & Accessories)LOT
64Construct new water cistern (5,000 Liters)LOT
65Modular Stainless steel tank (5,000 Li)LOT
66Connect to existing water well, provide new pumpLOT
67Booster Pump 2 HP and piping accessoriesEA
D2010Plumbing Fixtures
68Water Closet with BidetEA
69UrinalEA
70Shower assemblyEA
71Portable Water HeaterEA
72LavatoryEA
73Cabinet with MirrorEA
74Slop SinkEA
75Toilet Paper HoldersEA
76Soap HoldersEA
77CHB Toilet Partitions including doors (men's and Ladies Barracks)EA
78Privacy Partition for UrinalsEA
D2030Site Drainage/Waste Water System
79Septic Tank with Leech FieldLOT
D2040Storm and Drainage Pipes
80Storm and Drainage PipesLOT
D30HVAC:
81Aircon 1.5 HP For VIP RoomsEA
82Aircon 2 HP for Conference RoomEA
83Aircon 1 HP for Storage RoomEA
84Aircon 3 Tonner for Fitness GymEA
85Ceiling FansEA
86Exhaust FansEA
D40FIRE PROTECTION:
87D4010Smoke DetectorEA
88Fire Alarm & Manual Pull StationEA
89Fire Exit SignageEA
90Fire extinguisher with CabinetsEA
9120-lb Portable Fire Extinguisher with Built-in Sprinkler ceiling
mounted for the storage roomEA
92Fire Exit LadderEA
D50ELECTRICAL:
93D5010Electrical Rough-insSM
94WiringsSM
95Panel boardsEA
96Fixtures and Wiring DevicesLOT
97Distribution CableLS
98Emergency LightsEA
99Generator Set (50 KVA Diesel silent type)EA
100TransformerLS
101Electrical Post and MeteringLS
102D5090Grounding and Lightning ArresterEA
E20FURNISHINGS
103Provide and install water filtration system (incl. storage tanks,
pumps, valve and all accessories) including shedLOT
G10SITE PREPARATION
G1010Site Clearing
104Clearing, grubbing and tree-cuttingSM
G1030Site Earthwork
105FillCU.M.
106ExcavationCU.M.
107Soil TreatmentSM
G20Site Improvement
108Gravel Cover at Open area (3" thick of 3/4" gravel)SM
XFIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT
X10FIELD REQUIREMENTS
109MobilizationLS
110DemobilizationLS
111Project Management,: Supervision, QC, SafetyMonths
112Design, Construction Plans, Closeout RequirementsLS
113RenderingLS
114Training, O&M Manuals, As-BuiltLS
X20OFFICE OVERHEAD
115TempFacil, permits, and utilities months, formworks, Field Office,
Portalet,Environment Protection, Clean-UpMonths
TOTAL FOR CLIN 0001
CLIN 0002FURNITURE, FIXTURES & EQUIPMENTS
E20FURNISHINGS:
Fitness Gym
116Eliptical Trainer - commercial useEA
117Treadmill - commercial useEA
118Stair Climber - commercial useEA
119Smith Weight machine w/ flat bench- commercial useEA
120Exercise Bike - commercial useEA
121Dumbbell package w/ rackEA
122Weighing Scale - commercial scaleEA
12355 inch. Smart TVEA
124Receiving CounterEA
125Swivel ChairEA
Laundry Room
126WashersEA
127DryersEA
128Table for folding clothes with built-in cabinet (for laundry
Detergent & Hangers)EA
129Wooden ChairEA
Drying Area
130ClotheslineEA
VIP ROOMS
131Tables with drawersEA
132Wooden ChairEA
133Wardrobe CabinetsEA
134Full Size BedEA
1358" Matress, Pillows and LinensEA
MALE BARRACKS
136Double Bunk BedEA
1374" Mattress, Pillows and LinensEA
138Metal LockersEA
LATRINE
139Cabinet for Storage of Cleaning tools and supplyEA
CONFERENCE ROOM
140Conference Table (for 14 seats) woodenEA
141Executive ChairsEA
14275" LED Smart TVEA
143ProjectorEA
144Mechanized Pull Down Projector ScreenEA
145Audio Visual SystemEA
ADMIN. ROOM
146Tables with drawersEA
147Swivel ChaIrs with armEA
148Office CabinetsEA
STORAGE ROOM
1495 Level Metal shelves (40cmx120cmx185cm)EA
RECEIVING AREA
150Receiving CounterEA
151High Chair without armEA
152Living Room Set (3 seater, 2 seater & Center Table)EA
TOTAL FOR CLIN 0002
CLIN 0003PROVIDE & INSTALL SOLAR PANEL SYSTEM
E20FURNISHINGS
153Provide and install complete Solar Panel System packageLOT
TOTAL FOR CLIN 0003
TOTAL COST OF PROJECT
NOTE:1. Add items as necessary which are not listed above.
2. Do not change unit of measurements
3. Provide cost only for numbered items 1 to 153 and any items added.