Exhibit C7 - PBS Waste Audits.pdf

PDF 148 KB Posted

Attached to
Full Maintenance Services at Lawton, OK Federal Building, O&M Services at Oklahoma City Federal Building
Solicitation number
47PH0220R0011
Issued by

View the file

Other files

File Type Posted
BL2_Equipment Inventory_OK0099CT.xlsx XLSX spreadsheet
BL2_Equipment Inventory_OK0101ZZ.xlsx XLSX spreadsheet
BL2_Equipment Inventory_OK0046CT.xlsx XLSX spreadsheet
BL2_Equipment Inventory_OK0072CT.xlsx XLSX spreadsheet
47PH0220R0011 SF30_Amendment 0001_2020 1204.pdf PDF
BL2_Equipment Inventory_OK0074ZZ.xlsx XLSX spreadsheet
Figure B-3 Pricing proposal_5 year.xlsx XLSX spreadsheet
BL2_OK0072_Equipment Inventory.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan.pdf PDF
Attachment 1_CBA_OK CITY_IUOE Local.pdf PDF
BL3_Location General Informationdocx.pdf PDF
Solicitation Final OKC and Lawton OM and FM Spec 2020 1110.pdf PDF
Attachment 2_CBA_2017-10211_Rev1_Dated 9032018.pdf PDF
Exhibit M10_OK0072CT PM Forecast.pdf PDF
BL2_OK0101_Equipment Inventory.pdf PDF
BL2_OK0046_Equipment Inventory.pdf PDF
Attachment 3_Lawton_WD2015-5313_Rev 11_Dated 6302020.pdf PDF
Figure L-1 Management Plan Worksheet.xlsx XLSX spreadsheet
Attachment 4_ Table of Deliverables_2020 0902.pdf PDF
Figure B-2 for Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M3 - Environmental Sustainable Products.pdf PDF
Exhibit M10_OK0046CT PM Forecast.pdf PDF
BL2_OK0074_Equipment Inventory.pdf PDF
Exhibit M10_OK0101ZZ PM Forecast.pdf PDF
Attachment 3_OK City_WD2015-5315_Rev 11_Dated 6302020.pdf PDF
BL2_OK0099_Equipment Inventory.pdf PDF
BL4_Roof Warranty_Lawton Federal Courthouse.pdf PDF
Exhibit M2 - Green Purchasing Report.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Exhibit C8 - GSA Form 3638 Pest Control Work and Inspection Report (1).pdf PDF
BL5_Work order history.xlsx XLSX spreadsheet
Exhibit M9_2018 GSA PM Guide FINAL.pdf PDF
Exhibit M4 - Bldg Op Plan Template.pdf PDF
Exhibit M6_Water Treatment.pdf PDF
Exhibit M10_OK0074ZZ PM Forecast.pdf PDF
BL1_Fire extinguisher report.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Figure L-2 Past Performance Questionnaire.pdf PDF
Figure B-1_Staffing Declaration form.xlsx XLSX spreadsheet
Exhibit C3 - Surveilence Form 1181-A.xlsx XLSX spreadsheet
EXHIBIT C1 Building Information Sheets.pdf PDF
Exhibit C5 - Erosion and Sediment Control.pdf PDF
Exhibit M10_OK0099CT PM Forecast.pdf PDF
Exhibit M5 - Smart Buildings.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C7

PBS WASTE AUDITS

This exhibit is provided to the Contractor as a guide for additional considerations for post-audit monitoring, plan implementation, training and other ancillary activities that may assist GSA in meeting the listed objectives.

I. Background GSA’s Public Buildings Service (PBS) provides work environments for over one million Federal employees nationwide. The inventory consists of courthouses, laboratories, offices and border stations. Tenant activities in these buildings generate tons of solid waste/trash that PBS is obligated to properly dispose of and achieve a minimum waste diversion of 50%. Recycling composting and other alternatives to landfills and incineration are the preferred methods for disposal of solid waste/trash.

II. Objectives Determine the most efficient methods to maximize reduction, recycling, and composting of solid waste/trash and to minimize waste shipments. Achieve a minimum of 50% waste diversion through waste minimization, recycling, and composting. Determine the right service level for solid waste/trash collection and removal

III. Extent of Work: The Contractor shall conduct a solid waste/trash audit to include:

• 100% of the waste and/or recycling collected in a 24 hour period must be audited (excluding durable goods or construction waste).

• The audit must represent a 24 hour period on a typical work day.

• Use scales to weigh sorted waste, as weight is the preferred metric.

• Determine the amount of recyclable materials being thrown away that could have been recycled and composted.

At a minimum, the recyclable items within the waste/trash must be identified and separated into the following categories: Paper, Plastic, Cardboard, Glass, Metal/aluminum, and Wet Waste.

The Contractor shall develop a written report and analysis of the conclusions drawn from this audit, including recommendations for improving the economy and efficiency of waste collection, storage, transfer, and disposal

(including recycling and composting). This report shall address, at a minimum:

• Recommendations to maximize waste minimization, recycling, and composting to achieve at least 50% waste diversion.

• Recommendations to right-size service level for solid waste/trash removal services to minimize trash shipments.

The report and analysis is due 60 days after the start date.

File details come from the government source that posted it. Updated .