This document is a technical specification exhibit for the Zulu Sign Project at Buckley Air Force Space Force Base in Colorado, prepared by the 140th Civil Engineering division. The project involves the replacement of existing airfield signage at Taxiway Z, including removal and replacement of five sign arrays located at the Z Pad/Taxiway intersection and surrounding areas. The scope encompasses removal of existing 18-foot by 4-foot by 12-inch deep concrete bases and installation of new L-858 LED signs in either 3-step or 5-step configurations, with updated legend panels where applicable. All signage must be relocated or repositioned in specific locations, including arrays on the west side of Z Pad, east side of Z Pad, at the Runway/Taxiway Z intersection (both north and south directional arrays), and the Z Apron area.

The specified signs must comply with FAA standards including L-858Y(L), L-858R(L), L-858L(L), L-858H(L), and L-858B(L) per AC 150/5345-44 and FAA Engineering Brief No. 67, and must be ETL certified. All signs require non-ferrous aluminum frames with stainless-steel hardware, retroreflective sheeting, impact-resistant modified acrylic legend panels, lightning protection compliant with FAA Engineering Brief No. 67D and ANSI/IEEE C62.41-1991, external grounding lugs, and tethers on all legs with no external power switches. The contractor is required to submit sign legend proofs to 140th Civil Engineering for review and approval prior to ordering new signs. The signage must be compatible with both ferroresonant and thyristor constant current regulators operating on 2.8 to 6.6 amperes across all CCR steps.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Z PAD / TWY SIGNAGE

* REMOVE EXISTING 18FT X 4FT X12” DEEP CONCRETE BASE AND REPLACE WITH NEW.

* REMOVE EXISTING SIGN AND REPLACE WITH NEW L-858, SIZE 3, 3-STEP, LED.

* PROVIDE UPDATED LEGEND SHOWN IN NEXT SLIDE

* NEW SIGN MAY BE SHORTER IN LENGTH DUE TO NEW LEGEND

(1) EXISTING SIGN ARRAY WEST OF Z PAD

FACING EAST FACING WEST

MANDATORY SIGN ARRAY WEST OF Z PAD

BACK SIDE, Z APRON DESTN SIGN

Facing East

Facing West Z APRON

* REMOVE EXISTING SIGN AND REPLACE WITH NEW L-858, SIZE 3, 3-STEP, LED.

* PROVIDE NEW SIGN WITH UPDATED LEGEND SHOWN IN NEXT SLIDE

* NEW SIGN MAY BE SHORTER IN LENGTH DUE TO NEW LEGEND

(2) EXISTING SIGN ARRAY EAST OF Z PAD

Facing West

East

MANDATORY / LOCATION SIGN ARRAY EAST OF Z PAD

BACK SIDE EXAMPLE

Facing West

East

* REMOVE EXISTING SIGN AND REPLACE WITH NEW L-858, SIZE 3, 5-STEP, LED

* NEW SIGN TO HAVE SAME LEGEND AS EXISTING. * MOVE DIRECTIONAL Z ON SIDE FACING WEST TO RIGHT SIDE OF NEW

SIGN

(3) MANDATORY/LOCATION SIGN ARRRAY AT RWY/TWY Z

INTERSECTION

Facing East

West

* REMOVE EXISTING SIGN AND REPLACE WITH NEW L-858, SIZE 3, 5-STEP LED

* NEW SIGN TO HAVE SAME LEGEND AS EXISTING

(4) DIRECTIONAL SIGN ARRRAY AT SOUTH SIDE OF RWY/TWY Z

INTERSECTION

South Side

North Side

* REMOVE EXISTING SIGN AND REPLACE WITH NEW L-858, SIZE 3, 5-STEP LED

* NEW SIGN TO HAVE SAME LEGEND AS EXISTING

(5) DIRECTIONAL SIGN ARRRAY AT NORTH SIDE RWY/TWY Z

INTERSECTION

North Side

South Side

Sign Requirements:

• Signs must comply with FAA standards: L-858Y(L), L-858R(L), L-858L(L), L-858H(L), and L-858B(L) AC 150/5345-44 (Current Edition) and the FAA Engineering Brief No. 67. ETL Certified

• Compatible with ferroresonant and thyristor CCRs in compliance with FAA and IEC requirements.

• Provides constant illumination on all CCR steps 2.8 - 6.6 A. Operates on all steps of a 3-step, 5-step, and 1-step CCRs.

• Lightning protection that complies with FAA Engineering Brief No. 67D and ANSI/IEEE C62.41- 1991 Location Category C2.

• Non-ferrous aluminum frame and mounting. Stainless-steel hardware. Impact resistant modified acrylic legend panels. Retroreflective sheeting

• Signs to be LED size 3, tethers on all legs, external grounding lug, no external power switch

• Contractor shall submit sign legend proofs to 140th Civil Engineering for review and approval prior to ordering new signs.

Concrete Base Detail

Concrete Base Detail

TWY ZULU MAP

Z Pad / TWY Signage
* Remove existing 18ft x 4ft x12” deep concrete base and replace with new.��* Remove existing sign and replace with new l-858, Size 3, 3-step, led. ��* Provide updated legend shown in next slide��* New sign may be shorter in length due to new legend�
mandatory sign array west of z pad
����* Remove existing sign and replace with new l-858, Size 3, 3-step, led. ��* Provide new sign with updated legend shown in next slide��* New sign may be shorter in length due to new legend����
MANDATORY / LOCATION SIGN ARRAY east OF Z PAD
* Remove existing sign and replace with new L-858, size 3, 5-step, led��* new sign to have same legend as existing. * Move Directional z on side facing west to right side of new sign
* Remove existing sign and replace with new l-858, size 3, 5-step led��* New sign to have same legend as existing�
* Remove existing sign and replace with new l-858, size 3, 5-step led��* new sign to have same legend as existing
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12

File details come from the government source that posted it. Updated .