Exhibit C _ CM_GC Fee Proposal.docx
DOCX document 15 KB Posted
- Attached to
- UGA_BR-10-2702 CM Oglethorpe House Renovation
- Solicitation number
- PE-47200-RFQ-2027-000000163
- Issued by
- Clarke County, Georgia
About this file
This is a CM/GC Fee Proposal document for Exhibit C of BR-10-2702, the Oglethorpe House Renovation project at the University of Georgia in Athens, Georgia. The proposal outlines the compensation structure for Construction Manager/General Contractor (CM/GC) services, which includes both pre-construction and construction phases. The CM/GC fee represents the gross profit and compensation for all expenses not classified as Cost of the Work, contingent upon the CM/GC's performance of all contract requirements within established time limits. The document provides a framework for two primary fee components: a Pre-Construction Fee for consulting services during the pre-construction phase and a Construction Fee for services during the construction phase, with the option to break down fees by individual sites if the project is multi-site in nature.
The proposal requires the CM/GC to specify fixed fee amounts for both pre-construction and construction services, along with maximum overhead costs broken into two categories: Pre-Construction Costs and Expenses (referenced from Attachment A) and Construction Overhead Costs (referenced from Attachment B). These overhead amounts are inclusive of all direct and incidental expenses and exclude the pre-construction and construction fees themselves. The document requires signature authorization from a CM/GC officer with identification of title, establishing a formal agreement between the University of Georgia and the selected CM/GC for this renovation project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit D _ Preconstruction Cost _ Expenses B.xlsx | XLSX spreadsheet | |
| Exhibit G _ Proposer_s Disclosure Statement.doc | DOC document | |
| Egnyte Upload Instructions.pdf | ||
| _UGA_BR_10_2702_CM_RFQ_RFP.pdf | ||
| Exhibit E _ General Conditions Breakdown.xlsx | XLSX spreadsheet | |
| Exhibit A _ Certification Form.docx | DOCX document | |
| Exhibit F _ Project Cost Matrix.xlsx | XLSX spreadsheet | |
| Exhibit B _ Contractor Affidavit.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit C BR-10-2702, Oglethorpe House Renovation University of Georgia, Athens, Georgia
CM/GC FEE PROPOSAL
1. CM/GC’S FEE:
Basis of Fee. The CM/GC’s fee is the amount, established by and agreed to by both parties, which is the full amount of compensation due to the CM/GC as gross profit, and for any and all expenses of the Project not included and identified as a Cost of the Work, provided that the CM/GC performs all the requirements of the Contract Documents within the time limits established. (See Article 4.1.1 of the General Requirements.) If applicable, the fees and costs should be broken down by each site within a multi-site project.
A. PRECONSTRUCTION FEE:
Pre-Construction Fee. Representing the gross profit for the pre-construction consulting services provided by CM/GC as set forth in Section 2, Parts 1 and 2 of the General Requirements, and as described in Paragraph 4.1.1.1(a), Owner shall pay to CM/GC a Preconstruction Fee:
TOTAL
Pre-Construction Fee (fixed fee)
B. CONSTRUCTION FEE:
Construction Fee. Representing the gross profit for the construction services provided by CM/GC as set forth in Section 3, Part 1 of the General Requirements, and as described in Paragraph 4.1.1.1(b) Owner shall pay to CM/GC a Construction Fee.
TOTAL
Construction Fee (fixed fee)
2. CM/GC’S PRECONSTRUCTION COSTS AND CONSTRUCTION OVERHEAD COSTS:
The CM/GC’s Overhead Costs. The maximum amount for the CM/GC’s Pre-Construction Costs and Expenses and Construction Overhead Costs are inclusive of all direct and incidental expenses are as described in Paragraph 4.1.1.2 .
AMOUNT
A. Maximum Pre-construction Costs & Expenses (From Attachment A. Do not include the Pre-Construction Fee in this amount)
B. Maximum Construction Overhead Costs (From Attachment B. Do not include the Construction Fee in this amount)
Total Maximum Overhead Cost (Sum of A & B)
CM/GC Name
By:_________________________________________________________ Signature of CM/GC Officer
Title of CM/GC Officer