Exhibit C - CDRL A003_MO Process Plan.pdf

PDF 530 KB Posted

Attached to
Apache AH-64 Composite Main Rotor Blade
Solicitation number
W58RGZ-25-R-0071
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) for a technical report related to a Maintenance and Overhaul (M&O) Process Plan for a Composite Main Rotor Blade, issued by the Department of the Army's Combat Capabilities Development Command Aviation and Missile Center (DEVCOM AvMC). The document is for The Boeing Company and covers Contract Line Item Number 0030, with a Data Item Number A003 for a Technical Report - Study/Services.

Key details include a submission frequency of ONE/R with the first submission due 30 days after contract award. The document requires an M&O Process Plan tailored to specific requirements, with government approval or disapproval occurring within 90 calendar days of receipt. Distribution is authorized to U.S. Government agencies for Test and Evaluation, with a determination date of 10 Jan 2023. The contractor must submit the plan electronically in Adobe Acrobat .pdf format to the Contract Specialist and Contracting Officer, and any changes affecting Critical Safety Item Characteristics must be submitted within 10 calendar days for review and approval.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

J�fa �':i�l�::.P0

�1�#ri�� r ��� ��i���in'i�� e f��

0�a�i i�!���'.

i ��J s c�� i ;i';,�i � n3�:��;,i�� t�.:'<g�11CifiJ�sgrrif�r::;�Irt��g J��l�'in����:

i ��t�i::i s y�i� t ��':le� e :��i;:, n a�e e s ��e other aspect o� this collection of informationb includinll.1 suggestions for reducing the tiurden, to Department of Defense ;i

Washi!IBton Headqua�ers Services, Directorate for Information Operations and Reports f0701- 188), 1 15 Jefferson Davis Highway, Suite 1204, ArlinRton, VA 2202-43 2. Respondents should be aware that notwithstanding any other provision of aw not.ferson shall be subject to any penalty for failing to compll, w1 h a collection of information if it does not display a currentl�valid

0MB control number. Please DO NOT RE UR your form to the above address. Send completed form o the Government Issuing Contracting Officer for the Contract/ No.

I isted in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

MISC

0030 C TDP TM OTHER

D.SYSTEM/ITEM

I

E. CONTRACT/PR NO. F. CONTRACTOR

COMPOSITE MAIN ROTOR BLADE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Technical Report - Study/Services M&O Process Plan

4. AUTHORITY /Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B SOW Para. 19 DEVCOM AvMC SRD

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ONE/R 30DAC b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

A NIA

SUBMISSION Draft See Block 16 Reg Repro

16, REMARKS See Block 16 0 1 0 BLOCK 4: Tailored to follow the requirements of the Maintenance and Overhaul (M&O) Planning Preparation and Submittal Requirements document located at https://www .avmc.army.mil/Directorates/SRD/SAR/.

BLOCK 8: Government approval or disapproval will occur within 90 calendar days of receipt. If disapproved, the contractor shall resubmit within 30 calendar days after Government disapproval.

BLOCK 9: DISTRIBUTION STATEMENT B.: Distribution authorized to U.S.

Government agencies; Test and Evaluation; date of determination: 10 Jan 2023.

Other requests for this document must be referred to Department of the Army Combat Capabilities Development Command, Aviation and Missile Center, ATTN: FCDD-AMR-SS, Bldg. 5400, Fowler Rd, Redstone Arsenal, AL 35898-5000.

Export Control Act Warning - Not required

BLOCK 13: Once the Government has approved the Contractor's plan, if the Contractor makes a change to the plan that affects a Critical Safety Item Critical Characteristic, the Contractor shall submit the revised plan to the Government within 10 calendar days for review and approval.

BLOCK 14: 1) Plan shall be provided electronically in Adobe Acrobat .pdf or Government approved compatible format via email or for large file sizes, use the DoD SAFE file exchange service.

2)The Contractor shall submit the M&O Plan to the Contract Specialist and to the Contracting Officer.

15.TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

SOUTHWARD.ERIKA. =�:.:i;�R�.DENISE.12912 SOUTHWARD.ER �������R�DENIS

Erika Southward DENISE.1291250951 ::!

2025.osm ,0:33,17 -05·oo 9MAY25 Erika Southward IKA.DENISE.1291 E.12912509S1 9MAY25Date:2025.0S.0910:33:34

250951 -OS'OO'

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

The Boeing Company