Exhibit A - CDRL A001_GP Inventory Report.pdf

PDF 538 KB Posted

Attached to
Apache AH-64 Composite Main Rotor Blade
Solicitation number
W58RGZ-25-R-0071
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for The Boeing Company, specifically for two contract line items: 0030 for a Composite Main Rotor Blade and 006 for a Hanger Assembly Aft Bearing. The first line item (A001) requires a Government Property (GP) Inventory Report with physical inventory instructions. The contractor must provide initial inventory data no later than 365 days after receiving initial Government-furnished property for overhaul, with subsequent annual inventory reports to be delivered to usarmy.redstone.amcom.mbx.alc-inventory-management@army.mil. The document is dated 9 MAY 25 and involves the AMCOM Logistics Center, with no specific pricing information provided beyond a "NSP" (Not Separately Priced) designation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

J�fa �i:,�/�::.P

�1�iri�� r ��� ��i���in1�� e i ���\re�� i ��J s c�:i;R:i,�i � n3�:o;;,2:,i�� t�a

,g�11f�firi�sgrrii'f':ir��lr���g d��i i �'in���r:

i �a�t�i::1 s ¥�i� t ��':le� e :��!;::'a�e s other aspect o� this collection of informationb includinli.1 suggestions for reducing the tiurden, to Department of Defense� Washi!IBton Headquaners Services, Directorate for lnformabon Operations and Reports f0701- 188), 1 15 Jefferson Davis Highway, Suite 1204, A�inRton, VA 2202-43 2. Respondents should be aware that notwithstanding any other provision of aw no,.rvrson shall be subject to any penalty for failing to compll, w, h a collection of information if it does not display a currentl�valid

0MB control number. Please DO NOT RE UR your form to the above address. Send completed form o the Government Issuing Contracting Officer for the Contract/ No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

MGMT

0030 A TOP TM OTHER

D.SYSTEM/ITEM

I

E. CONTRACT/PR NO. F. CONTRACTOR

COMPOSITE MAIN ROTOR BLADE

1. DATA ITEM NO. 2. TlnE OF DATA ITEM 3. SUBTlnE

A00l Government Property (GP) Inventory Report Physical Inventory Instructions

4. AUTHORITY /Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-8044 1D SOW,PARA 15b AMCOM Logistics Center

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED See Block 16 See Block 16 b. COPIES

8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

NIA NIA

SUBMISSION Draft See Block 16 Reg Repro

16, REMARKS See Block 16 0 1 0

BLOCKS 10,12 and 13:

Contractor shall provide initial inventory data no later than 365 days after receipt of initial delivery of Government-furnished Property for overhaul. Contractor shall provide subsequent inventory data annually thereafter.

BLOCK 14: Deliver data to:

usarmy.redstone.amcom.mbx.alc-inventory-management@army.mil

15.TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J.DATE

SOUTHWARD.ERIKA. �=!i;�Rl�DENrsE.129125 SOUTHWARD.ERIK �=!i��Rt,DENISE.ll

Erika Southward 9MAY25 1 rika Southward A.DENISE.1291250 912509s1 9MAY25DENISE.1291250951 :St!20lS.05.0910:31:1S-OS'OO'

Oilte:2025.05.0910:31:31

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

The Boeing Company

File details come from the government source that posted it. Updated .