Exhibit C - CDRL A003 MO PLAN.pdf

PDF 636 KB Posted

Attached to
Solicitation for the Overhaul/Upgrade of the Blade, Rotary Wing for the UH-60 Black Hawk
Solicitation number
W58RGZ-25-R-0067
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for Data Item A003, a Technical Report focused on a Maintenance and Overhaul (M&O) Process Plan for a Blade Assembly with NSN 1615-01-691-8882. The CDRL specifies technical reporting requirements for the contractor, including submission of an M&O Process Plan to the DEVCOM AvMC SRD (Development Command Aviation and Missile Center), with specific guidelines for electronic submission, distribution, and government review. Key submission details include a first submission date of 30 days after contract award, government approval/disapproval within 90 calendar days, and a requirement to resubmit within 30 calendar days if initially disapproved. The document also notes that any changes affecting Critical Safety Item Characteristics must be submitted within 10 calendar days for government review and approval, with the plan to be provided electronically in Adobe Acrobat PDF or compatible format.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

J�:a �����::,po���iri��r ��� �� i��:in1g:e r��

�a�t ig!��r���i ��d s c�:

i�:t,�i � n3 ver e 1 � 0t����llg�firi� s gpr�f':;r��t���g s��i i f ���rt���r% i� ns y�i;

t ���e�

=��rni"aq e e i ��ge other aspect o� this collection of information, includinll.z suggestions for redu Durden, to Department of Defense

Washington Headqua�ers Services, Directorate for Information Operations and Reports (0701-0188), 1 15 ;Jefferson Davis , Suite 1204, Arlinnton, VA 2202-43 2. Respondents should be aware that notwithstanding any other provision of law nor.rerson shall be subject to any penalty for failin� to complr. w, h a collection of information if it does not display a current!� valid

0MB control number. Please DO NOT RE UR your form to the above address. Send comp eted form o the Government Issuing Contracting Officer for the Contract/ R No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0006 F TDP

D. SYSTEM/ITEM

I

I E. CONTRACT/PR NO.

3lade Assembly, NSN: 1615-01-691-8821

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

A003 Technical Report - Study/Services

4. AUTHORITY (Data Acquisition Document No./

TM OTHER MISC

F. CONTRACTOR

3. SUBTITLE

M&O Process Plan

6. REQUIRING OFFICE

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW Para. 19 DEVCOM AvMC SRD

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED ONE/R 30DAC b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

A NIA

SUBMISSION Draft See Block 16 Reg Repro

16. REMARKS See Block 16 0 1 0 BLOCK 4: Tailored to follow the requirements of the Maintenance and Overhaul (M&O) Planning Preparation and Submittal Requirements document located at https://www.avmc.army.mil/Directorates/SRD/SAR/.

BLOCK 8: Government approval or disapproval will occur within 90 calendar days of receipt. If disapproved, the contractor shall resubmit within 30 calendar days after Government disapproval.

BLOCK 9: DISTRIBUTION STATEMENT B.: Distribution authorized to U.S.

Government agencies; Test and Evaluation; date of determination: 10 Jan 2023.

Other requests for this document must be referred to Department of the Army Combat Capabilities Development Command, Aviation and Missile Center, ATTN: FCDD-AMR-SS, Bldg. 5400, Fowler Rd, Redstone Arsenal, AL 35898-5000.

Export Control Act Warning - Not required

BLOCK 13: Once the Government has approved the Contractor's plan, if the Contractor makes a change to the plan that affects a Critical Safety Item Critical Characteristic, the Contractor shall submit the revised plan to the Government within 10 calendar days for review and approval.

BLOCK 14: 1) Plan shall be provided electronically in Adobe Acrobat .pdf or Government approved compatible format via email or for large file sizes, use the DoD SAFE file exchange service.

2)The Contractor shall submit the M&O Plan to the Contract Specialist or to the Contracting Officer.

15.TOTAL 0 1 0

G. PREPARED BY H.DATE I. APPROVED BY J.DATE

KATHRYN RIGGS 26 Nov 24 KATHRYN RIGGS 26 Nov 24

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

2024-11-26T17:14:06-0600
RIGGS.KATHRYN.L.1074083346
2024-11-26T17:13:40-0600
RIGGS.KATHRYN.L.1074083346

File details come from the government source that posted it. Updated .