About this file

This solicitation seeks proposals for the overhaul of hydraulic pumps, servo-cylinder assemblies, cylinder assemblies, and servo-cylinders. The contractor shall provide all labor, parts, materials, equipment, and data to overhaul a minimum of 2,730 and maximum of 11,760 units over five years. Item quantities range from a minimum of 150 servo-cylinders to a maximum of 5,400 hydraulic pumps. Delivery is FOB origin. Parker Hannifin Corporation is currently the only approved repair data source. The closing date is estimated but the solicitation will not close before the stated date. This is an IDIQ contract for maintenance and overhaul services.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

12/19/2017Page 1 of 2

4320-01-6435963

PUMP, HYDRAULIC

D. SYSTEM / ITEM

A003

1. DATA ITEM NO.

GDULA, ROBERT H.

G. PREPARED BY

11/07/2017

H. DATE

MCREE, DAVID L.

I. APPROVED BY

11/07/2017

J. DATE

MAYHALL, CONNIE

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE: 11/20/2017

4. AUTHORITY (DATA ACQUISITION DOC NO) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

AMSAM-MSC-CLP

NSN:

PRID: PART NUMBER:AB867-1 53023-07 STATUS: R

AMSRD-AMR-SE-TD-ST/DM

Quality Deficiency Report

DI-QCIC-80736 SOW, PARA S RDMR-SEQ

LT

N/A

A SEE BLK 16

N/A

SEE BLK 16

SEE BLK 16

0 1 0

0 1 0

16. REMARKS:

BLOCKS 10, 12, AND 13: No report is necessary unless there is a discrepancy.

Contractor shall submit NLT 10 days after discovery of deficiency.

The Contractor shall coordinate quality deficiency with the Cognizant Government Representative.

POC: PHONE:

12/19/2017Page 2 of 2

11/16/2017Page 1 of 2

1650-01-6249255

SERVOCYLINDER ASSEMBLY

D. SYSTEM / ITEM

A003

1. DATA ITEM NO.

GDULA, ROBERT H.

G. PREPARED BY

10/19/2017

H. DATE

MCREE, DAVID L.

I. APPROVED BY

10/20/2017

J. DATE

MAYHALL, CONNIE

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE: 10/27/2017

4. AUTHORITY (DATA ACQUISITION DOC NO.) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

AMSAM-MSC-SI

NSN

PRID: PART NUMBER:AB869-1 274600-1051 STATUS: R

AMSRD-AMR-SE-TD-ST/DM

Technical Report - Study/Services DD FORM 1348-1A

DI-MISC-80508B SOW, PARA N AMSAM-MSC-SI

SD

N/A

A 1 TIME

N/A

SEE BLK 16

N/A

0 1 0

0 1 0

16. REMARKS:

Block 12: Contractor shall deliver report within 5 working days of receipt of repairables.

Block 14A: Data shall be delivered to: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

11/16/2017Page 2 of 2

02/28/2018Page 1 of 2

1650-01-6250164

CYLINDER ASSEMBLY

D. SYSTEM / ITEM

A003

1. DATA ITEM NO.

GDULA, ROBERT H.

G. PREPARED BY

02/09/2018

H. DATE

MCREE, DAVID L.

I. APPROVED BY

02/09/2018

J. DATE

WOOD, MARY SHANNA

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE: 02/21/2018

4. AUTHORITY (DATA ACQUISITION DOC NO) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

RDMR-SEU

NSN:

PRID: PART NUMBER:AB870-1 274000-1035 STATUS: R

AMSRD-AMR-SE-TD

Technical Report - Study/Services PROCESS PLAN

DI-MISC-80508B SOW, PARA T RDMR-SEU

LT

A

B SEE BLK 16

N/A

30DAC

SEE BLK 16

0 1 0

0 1 0

16. REMARKS:

BLOCKS 8, 10 & 13: When the contractor makes a change to the plan (as frozen at the time the PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within 30 days after the date of the change. As required, revised the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.

BLOCK 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only;

test and evaluation; date of determination: 7 July, 2005. Other requests for this documentation shall be referred to Commander, U.S. Army Research, Development and Engineering Command, ATTN: RDMR-SEU, Redstone Arsenal, AL 35898-5000.

Export Control Act Warning - Not required

BLOCK 12: The first submission of the overhaul, repair, upgrade, modification, or recapitalization plan will be used by the Government for informational purposes only.

BLOCK 14: Documentation shall be provided electronically in adobe acrobat .pdf or compatible format on compact disk read only memory device (cd-rom).

DISTRIBUTION

a. Complete packages sent to: Commander, U.S. Army Research, Development and Engineering Command, ATTN: RDMR-SEU, Redstone Arsenal, AL 35898-5000.

b. Letter of transmittal only sent to procurement Contracting Officer as specified in contract.

02/28/2018Page 2 of 2

12/19/2017Page 1 of 2

1650-01-6249557

CYLINDER ASSEMBLY

D. SYSTEM / ITEM

A003

1. DATA ITEM NO.

GDULA, ROBERT H.

G. PREPARED BY

11/29/2017

H. DATE

CHILDS, BERNIDA

I. APPROVED BY

11/29/2017

J. DATE

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE:

4. AUTHORITY (DATA ACQUISITION DOC NO) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

AMSAM-MSC-SI

NSN:

PRID: PART NUMBER:BB856-2 274600-1049 STATUS: R

Technical Report - Study/Services DD FORM 1348-1A

DI-MISC-80508B SOW, PARA N AMSAM-MSC-SI

SD

N/A

A 1 TIME

N/A

SEE BLK 16

N/A

0 1 0

0 1 0

16. REMARKS:

BLOCK 12: Contractor shall deliver report within 5 working days of receipt of repairables.

BLOCK 14a: Data shall be delivered to: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil

12/19/2017Page 1 of 2

1650-01-6250436

SERVOCYLINDER

D. SYSTEM / ITEM

A003

1. DATA ITEM NO.

GDULA, ROBERT H.

G. PREPARED BY

11/14/2017

H. DATE

CHILDS, BERNIDA

I. APPROVED BY

11/15/2017

J. DATE

MAYHALL, CONNIE

LOG #

CONCUR:

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

DATE: 11/20/2017

4. AUTHORITY (DATA ACQUISITION DOC NO) 5. CONTRACT REFERENCE

2. TITLE OF DATA ITEM

6. REQUIRING OFFICE

3. SUBTITLE

F. CONTRACTORE. CONTRACTOR / PR NO.

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

8. APP CODE

b. COPIES

DRAFT FINAL

REG REPRO

a. ADDRESSEE 11. AS OF DATE 13. DATE OF SUBEQUENT

SUBMISSION

15. TOTAL

17. PRICE GROUP 18. ESTIMATED TOTAL PRICE

RDMR-SEU

NSN:

PRID: PART NUMBER:BB857 2227000-19 STATUS: R

AMSRD-AMR-SE-TD-ST/DM

Technical Report - Study/Services Process Plan

DI-MISC-80508B SOW, PARA T RDMR-SEU

LT

A

B SEE BLK 16

N/A

30DAC

SEE BLK 16

0 1 0

0 1 0

16. REMARKS:

BLOCKS 8, 10 & 13: When the contractor makes a change to the plan (as frozen at the time the PVA is approved by the Government or, when a PVA is not required, prior to induction of the first overhaul, repair, upgrade, modification or recapitalization asset) that affects a critical characteristic, submit copy of the revised plan to the Government, for review and comments, within 30 days after the date of the change. As required, revised the plan based on the Government's review and comments and resubmit to the government within 30 days of Government's comments.

BLOCK 9: Distribution Statement B: Distribution authorized to U.S. Government agencies only;

test and evaluation; date of determination: 7 July, 2005. Other requests for this documentation shall be referred to Commander, U.S. Army Research, Development and Engineering Command, ATTN: RDMR-SEU, Redstone Arsenal, AL 35898-5000.

Export Control Act Warning - Not required

BLOCK 12: The first submission of the overhaul, repair, upgrade, modification, or recapitalization plan will be used by the Government for informational purposes only.

BLOCK 14: Documentation shall be provided electronically in adobe acrobat .pdf or compatible format on compact disk read only memory device (cd-rom).

DISTRIBUTION

a. Complete packages sent to: Commander, U.S. Army Research, Development and Engineering Command, ATTN: RDMR-SEU, Redstone Arsenal, AL 35898-5000.

b. Letter of transmittal only sent to procurement Contracting Officer as specified in contract.

CDRL A003 1
CDRL A003 2
CDRL A003 3
CDRL A003 4
CDRL A003 5

File details come from the government source that posted it. Updated .