EXHIBIT C - Calculation of Self-Performed Work.docx
DOCX document 38 KB Posted
- Solicitation number
- 36C24421R0013
About this file
This exhibit provides a template for offerors to calculate the percentage of work to be self-performed in response to a solicitation from the Department of Veterans Affairs. Offerors must identify the total offer price and deduct any subcontracted specialty trades work and overhead costs to determine the total amount of work to be performed under the contract. Offerors then calculate the dollar value of the work they plan to self-perform, which should equal at least 15% of the total contract amount, and list the types of construction activities that will be self-performed such as mobilization, operation of owned equipment, purchase and installation of materials, and associated labor and supplies. The related federal contract opportunity is for design-build renovation services for an oncology and telehealth suite at the Erie VA Medical Center in Erie, Pennsylvania.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24421R0013 0005.docx | DOCX document | |
| 36C24421R0013 0004 3-23-2021.docx | DOCX document | |
| 36C24421R0013 0003.docx | DOCX document | |
| 36C24421R0013 0002.docx | DOCX document | |
| EXHIBIT E - Past Performance Questionnaire 36C24421R0013-Corrected 2-22-2021.docx | DOCX document | |
| Oncology Base-Layout1.pdf | ||
| 36C24421R0013 0001.docx | DOCX document | |
| EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx | DOCX document | |
| EXHIBIT B - Subcontractor Information and Consent Form.docx | DOCX document | |
| EXHIBIT A - Past Performance Relevancy Questionnaire.docx | DOCX document | |
| S02 36C24421R0013 - 2-2-2021.docx | DOCX document | |
| EXHIBIT E - Past Performance Questionnaire 36C24421R0013.docx | DOCX document | |
| P07-General Decision Number- PA20210088 01-22-2021.docx | DOCX document | |
| ICRA FORM.docx | DOCX document | |
| P01-SOW 562-18-407 Oncology_Tele Health Project DESIGN-BUILD.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK
SUBMITTED IN RESPONSE TO Request For Proposal 36C24421R0013
Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.
Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
Clearly describe the work to be self-performed:
Show Calculation of Self-Performed work:
B.1 Total Offer Price: $
B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self-performed) $ __________________
B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($) ________________________
B.4 Remainder is “Total amount of work to be performed under the Contract” =
B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?
(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)
B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %