Exhibit C Bid Price Proposal Revised 1.xlsx
XLSX spreadsheet 47 KB Posted
- Solicitation number
- ITB-06217
- Issued by
- Miami-Dade County, Florida
About this file
This document is an Exhibit C Bid Price Proposal for a state and local contract opportunity issued by the Florida Department of Transportation (FDOT) to provide District-Wide Right-of-Way Asbestos and Air Monitoring Consulting Services in Miami-Dade and Monroe Counties. The project/proposal number is DOT-ITB-23-6181IZ Rebid, with a Financial Project Number of Various. The work description includes asbestos survey and reporting, operation and maintenance plans, asbestos airborne fiber assessment, operations and maintenance implementation, abatement specifications, agreement administration, asbestos abatement, and final clearance reports. The bid proposal contains estimated unit quantities and unit prices for these various services. Proposals are due on September 06, 2023, at 10:00 AM via email to D6.Purch@dot.state.fl.us.
The bid price proposal form requires the consultant to provide their company name, federal ID number, authorized signature, and contact information. The consultant must acknowledge that the unit prices submitted include overhead, profits, permits, travel, administrative expenses, materials, equipment, insurance, bonding, and all other incidentals required to complete the contract services. The contract may be renewed for the same price, terms, and conditions as the original agreement. The low bidder will be determined by the "Grand Total" bid amount, which is not to be considered the final contract amount.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| State of Florida | |
| Department of Transportation |
EXHIBIT “C”, BID BLANK/PRICE PROPOSAL
| TO PROVIDE DISTRICT-WIDE RIGHT-OF-WAY ASBESTOS AND AIR MONITORING CONSULTING SERVICES |
| IN MIAMI-DADE AND MONROE COUNTIES FOR THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT). |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid |
| FINANCIAL PROJECT NUMBER: | Various |
| Company Name: | |
| Federal ID Number: | |
| Authorized Signature: | |
| Type or Print Name: | |
| Title: | |
| Address: | |
| City, State, Zip Code: | |
| Telephone Number: | |
| Fax Number: | |
| E-mail Address: |
By signing above, the Bidder acknowledges they have read and understand the Scope of Services and Method of Compensation and that the unit prIces submitted in this price proposal form includes the Consultant's overhead, profits, permits, travel, administrative expenses, materials, equipment, insurance, bonding, all other incidentals and all direct and indirect costs required to complete the contract services. The Consultant named below agrees that if this Contract/Agreement is renewed, it shall be renewed for the same price, terms, and conditions as set forth in the original Contract/Agreement.
Consultant shall return all eight (8) pages of the Exhibit "C", Bid Price Proposal.
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid |
| FINANCIAL PROJECT NUMBER: | Various | |
| CONSULTANT'S NAME: |
| SECTION 1.0 | ||||||||
| ASBESTOS SURVEY AND REPORT | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 1.1 | RESIDENTIAL FACILITY | 1,500 SQUARE FOOT | PER SQUARE FOOT | X | 40 | = | $0.00 | |
| 1.2 | COMMERCIAL FACILITY (LESS THAN 10,000 SQUARE FEET) | 5,000 SQUARE FOOT | PER SQUARE FOOT | X | 40 | = | $0.00 | |
| 1.3 | COMMERCIAL FACILITY (MORE THAN 10,000 SQUARE FEET) | 12,000 SQUARE FOOT | PER SQUARE FOOT | X | 40 | = | $0.00 | |
| 1.4 | MOBILE HOMES | 500 SQUARE FOOT | PER SQUARE FOOT | X | 10 | = | $0.00 | |
| 1.5 | BUILDING CUTOFF | 100 PER SQUARE FOOT | PER SQUARE FOOT | X | 10 | = | $0.00 | |
| 1.6 | INSPECTION (NO SAMPLING) | PER BUILDING | X | 10 | = | $0.00 | ||
| 1.7 | INSPECTION | PER BRIDGE | X | 10 | = | $0.00 | ||
| TOTAL COST FOR SECTION 1.0 - ASBESTOS SURVEY AND REPORT | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB -23-6181IZ | Rebid | ||||||
| FINANCIAL PROJECT NUMBER: | Various | |||||||
| CONSULTANT'S NAME: | ||||||||
| SECTION 2.0 | ||||||||
| OPERATION AND MAINTENANCE PLAN | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 2.1 | LETTER PLAN | PER PLAN | X | 10 | = | $0.00 | ||
| 2.2 | FULL-SCALE PLAN | PER PLAN | X | 10 | = | $0.00 | ||
| TOTAL FOR SECTION 2.0 - OPERATION AND MAINTENANCE PLAN | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | |||||||
| FINANCIAL PROJECT NUMBER: | TBA | |||||||
| CONSULTANT'S NAME: | ||||||||
| SECTION 3.0 | ||||||||
| ASBESTOS AIRBORNE FIBER | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 3.1 | ASSESSMENT (SHIFT RATE) | PER 8 HOUR SHIFT | X | 40 | = | $0.00 | ||
| 3.2 | ASSESSMENT-OVERTIME RATE (SHIFT RATE) | PER PLAN | X | 10 | = | $0.00 | ||
| TOTAL FOR SECTION 3.0 - ASBESTOS AIRBORNE FIBER | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid | ||||||
| FINANCIAL PROJECT NUMBER: | Various | |||||||
| CONSULTANT'S NAME: | ||||||||
| SECTION 4.0 | ||||||||
| OPERATIONS AND MAINTENANCE IMPLEMENTATION | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 4.1 | OPERATIONS AND MAINTENANCE IMPLEMENTATION (SHIFT RATE) | PER 8 HOUR SHIFT | X | 10 | = | $0.00 | ||
| TOTAL FOR SECTION 4.0 - OPERATIONS AND MAINTENANCE IMPLEMENTATION | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | |||||||
| FINANCIAL PROJECT NUMBER: | Various | |||||||
| CONSULTANT'S NAME: | ||||||||
| SECTION 5.0 | ||||||||
| ABATEMENT SPECIFICATIONS | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 5.1 | ABATEMENT SPECIFICATIONS | PER SET OF SPECS | X | 10 | = | $0.00 | ||
| TOTAL FOR SECTION 5.0 - ABATEMENT SPECIFICATIONS | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid | ||||||
| FINANCIAL PROJECT NUMBER: | Various | |||||||
| CONSULTANT'S NAME: | ||||||||
| SECTION 6.0 | ||||||||
| AGREEMENT ADMINISTRATION | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 6.1 | AGREEMENT ADMINISTRATION | PER HOUR | X | 140 | = | $0.00 | ||
| TOTAL FOR SECTION 6.0 - AGREEMENT ADMINISTRATION | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid | ||||||
| FINANCIAL PROJECT NUMBER: | Various | |||||||
| CONSULTANT'S NAME: | ||||||||
| Section 7.0 | ||||||||
| ASBESTOS ABATEMENT | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 7.1 | LICENSED ASBESTOS CONSULTANT (SHIFT RATE) | PER 8 HOUR SHIFT | x | 10 | = | $0.00 | ||
| 7.2 | ASBESTOS PROJECY MANAGER (SHIFT RATE) | PER 8 HOUR SHIFT | x | 10 | = | $0.00 | ||
| 7.3 | ASBESTOS PROJECT MONITOR (SHIFT RATE) | PER 8 HOUR SHIFT | x | 10 | = | $0.00 | ||
| 7.4 | ASBESTOS INSPECTOR/SUPERVISOR (SHIFT RATE) | PER 8 HOUR SHIFT | x | 10 | = | $0.00 | ||
| 7.5 | ADMINISTRATIVE ASSISTANT (SHIFT RATE) | PER 8 HOUR SHIFT | x | 10 | = | $0.00 | ||
| TOTAL FOR SECTION 7.0 - ASBESTOS ABATEMENT | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid |
| FINANCIAL PROJECT NUMBER: | Various | |
| CONSULTANT'S NAME: |
| Section 8.0 | ||||||||
| FINAL CLEARANCE REPORTS | ||||||||
| ITEM # | WORK DESCRIPTION | AVERAGE SIZE | UNIT | UNIT PRICE | X | ESTIMATED UNITS | = | TOTAL COST |
| 8.1 | ASBESTOS ABATEMENT | PER REPORT | x | 40 | = | $0.00 | ||
| 8.2 | DEMOLITION CLEARANCE REPORTS | PER REPORT | x | 40 | = | $0.00 | ||
| TOTAL FOR SECTION 8.0 - FINAL CLEARANCE REPORTS | $0.00 | |||||||
| Note: The number of units specified may not match the actual number of parcels. The estimated units shown on the Price Proposal are for price evaluation only. The actual quantities for this agreement will be dependant on the number of tasks assigned. The unit cost per task will apply for the full term of agreement. |
| PROJECT/PROPOSAL NUMBER: | DOT-ITB-23-6181IZ | Rebid | ||
| FINANCIAL PROJECT NUMBER: | Various | |||
| BIDDER'S NAME: | ||||
| TOTAL AMOUNTS FOR SECTIONS 1.0 THROUGH 8.0 | ||||
| TOTAL AMOUNT FOR SECTION 1.0 - ASBESTOS SURVEY AND REPORT | $0.00 |
TOTAL AMOUNT FOR SECTION 2.0 - OPERATION AND MAINTENANCE PLAN $0.00
TOTAL AMOUNT FOR SECTION 3.0 - ASBESTOS AIRBORNE FIBER $0.00
TOTAL AMOUNT FOR SECTION 4.0 - OPERATIONS AND MAINTENANCE IMPLEMENTATION $0.00
TOTAL AMOUNT FOR SECTION 5.0 - ABATEMENT SPECIFICATIONS $0.00
TOTAL AMOUNT FOR SECTION 6.0 - AGREEMENT ADMINSTRATION $0.00
TOTAL AMOUNT FOR SECTION 7.0 - ASBESTOS ABATEMENT $0.00
TOTAL AMOUNT FOR SECTION 8.0 - FINAL CLEARANCE REPORTS $0.00
SECTIONS 1.0 THROUGH 8.0 - GRAND TOTAL AMOUNT FOR ASBESTOS CONSULTING SERVICES AND ASSOCIATED WORK $0.00
IMPORTANT NOTE:
Unless otherwise allowed for and authorized in the Letter of Authorization all the above unit costs shown include overhead, labor, travel, administrative expenses, materials, equipment, profit, insurance, bonding and all other incidentals required for the work described in the Contractor's unit price.
No set volume of work is intended to be guaranteed and the estimated quantities above are shown for purposes of determining the GRAND TOTAL. Low bidder will be determined by the "Grand Total" bid amount.Bidders MUST enter the grand total as a total dollar amount, otherwise the Propsal will be considered non-responsive.
If the actual quantities during the agreement period are less than or greater than what it is identified, the unit rates shall remain unchanged. Compensation shall be at the unit rates set forth above as proposed by the Contractor.
The Department and the Contractor shall negotiate any item of work not included in this bid sheet as they are identified for each individual job assignment. Additional Line Items will be added/amended to Contract/Agreement on a "As Needed Basis" per Job/Project.
If any items are left blank, the bid shall be considered as non-responsive. “Contractor shall be responsible for returning all eight (8) pages of the Exhibit “C”, Price Proposal, and ensuring the entire eight (8) pages are legible in the one (01) PDF format in which it was submitted.” This ensure it is their responsibility to make sure they test drive the attachment so that they show properly otherwise the "Price Propsal" will be considered non-responsive.
THE " GRAND TOTAL" PRICE IS NOT TO BE CONSIDERED THE CONTRACT AMOUNT.
Page-&P &"Calibri,Regular"&8
Sheet1 image1.jpeg
File details come from the government source that posted it. Updated .