Furnish and Install New Boilers - Austin NGA
Solicitation number
2000018641
Issued by
Mower County, Minnesota

About this file

Exhibit C - Drawing Summary

This drawing document supports the Department of Military Affairs' boiler installation project at Austin NGA in Austin, Minnesota. The exhibit provides technical specifications and visual representations for the furnish and installation of two new boilers at the facility located at 800 21st Street NE, Austin, MN 55912-4167. The drawing serves as a reference document for bidders to understand the physical layout, connection points, and installation requirements for the approved boiler models: Lochinvar FTX Series, Hydrotherm KN Series, or approved equal alternatives. The technical specifications depicted in this drawing are essential for contractors to accurately estimate labor, materials, equipment, and timeline requirements for project completion.

The drawing functions as a critical component of the bid package, enabling prospective contractors to visualize spatial constraints, clearances, piping configurations, and structural considerations necessary for proper boiler installation. This documentation ensures all bidders have access to identical technical information, promoting competitive bidding accuracy and consistency in project estimates. Contractors must reference this drawing in conjunction with the Scope of Work and other contract documents to develop comprehensive proposals that address all installation requirements and site-specific conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-102

M-102

B-1

B-2

BP-1

BP-2

PSH-1

CP-2

M-102

EXISTING EXPANSION TANK

EXISTING FILTRATION SYSTEM

ROUTE BOILER FLUES INSIDE

OF EXISTING CHIMNEY STACK

3" HWR (EXST)

2" NG (EXST)

3" HWS (EXST)

1" HWS (EXST)

3/4" HWR (EXST)

1-1/2" HWR (EXST)

END-CAP ON PROPANE

GAS CONNECTION

END-CAP ON DOMESTIC WATER

NEW 4" HIGH CONCRETE

HOUSEKEEPING PAD

4"Ø BOILER FLUE PER

MANUFACTURERS RECOMMENDATIONS

4"Ø BOILER VENTING PER

MANUFACTURERS RECOMMENDATIONS

3/4"ø HWR

1 1/2"ø HWR

2 1/2"ø HWS 2 1/2"ø HWR

3/4"ø NG

1"ø NG

1"ø HWS

3"ø HWS

CP-1

NEW HOSE END BALL VALVE

M-102

MINNES

OTA

NA

T I

ON

A L

GUARD

A LW

AY

S

RE

ADY

I H

ER

EB

Y

C

ER

TI

FY

T H

AT

T

H

IS

P

LA

N

SP

EC

IF

IC

AT

IO

N , O

R R

EP

O

R T

W

AS

P R

EP

AR

ED

B

Y M

E O

R U

N D

ER

M

Y D

IR

EC

T

SU

PE

R

VI

SI

O N

A N

D

TH

AT

I

AM

A

D U

LY

L

IC

EN

SE

D

U N

D

ER

T H

E

LA

W S

O F

TH

E

ST

AT

E O

F M

IN

N

ES

O

TA

SHEET NUMBER

DEP

ART

MEN

T O

F M

ILIT

ARY

AFF

AIR

S

H

W Y

0.

6.

F

AX

.6

.7

ST

AT

E O

F M

IN

N

ES

O

TA

FA

C

IL

IT

IE

S

M

AN

AG

EM

EN

T

O

FF

IC

E

LI

TT

LE

F

AL

LS

, M N

D W

N B

Y:

C

KD

B Y:

D

AT

E:

PR

O

JE

C

T N

O

LI

C

D

AT

E:

PL

O

T D

AT

E:

FI

LE

P

AT

H

EN

G

IN

EE

R

8/

/2

1:

:0

PM

C :\U se rs

\F M

O

AD

M S-

\D

C \A

C C

D oc s\ M

N F

M O

\T R

AN

SF

ER

S\

Pr oj ec t F ile s\

Au st in M ec h.

rv t

HY

DR

O

NI

C

FL

O O

R

PL

AN

M-101

ST

S

TR

EE

T

NE

AU

ST

IN

M N

NA

TI

O

NA

L G

UA

RD

A

RM

O

RY

BO

IL

ER

R

EP

LA

CE

M

EN

T

AU

ST

IN

, M

IN

NE

SO

TA

AU

G

US

T

, 2

C.

D.

T.

J.

J.

T.

8/

/2

JE

RE

M Y

J.

T

AU

TG

ES

1/2" = 1'-0"M-101

1 BOILER PIPING PLAN

RE

V.

DE

SC

RI

PT

IO

N

DA

TE

AD

D.

/P R

M-102

B-1 B-2

BP-2BP-1

PSH-1

2 1/2"ø HWR

1 1

77 7

EXISTING FLOOR DRAIN

2 1/2"ø HWR

2 1/2"ø HWS

2 1/2"ø HWS

2 1/2"ø HWR

3"ø HWS

3"ø HWR 3"ø HWR

3"ø HWS

1 1/2"ø HWR 3"ø HWR

1"ø NG

3/4"ø NG

3/4"ø NG

1"ø NG 3"ø HWR

2" NG (EXST)

3/4"ø C

3/4"ø C

ROUTE 4"Ø BOILER FLUES

INSIDE OF EXISTING CHIMNEY

STACK UP TO THE ROOF

4"Ø BOILER VENTING

NEW 4" HIGH CONCRETE HOUSEKEEPING PAD

1/2"ø HWR

1/2"ø HWR

M-102

B-1 BP-1

3/4"ø C 3/4"ø C

2 1/2"ø HWR

2 1/2"ø HWS

3/4"ø NG

4"Ø BOILER FLUE PER

MANUFACTURERS RECOMMENDATIONS

4"Ø BOILER VENTING

PER MANUFACTURERS

RECOMMENDATIONS

NEW 4" HIGH CONCRETE

HOUSEKEEPING PAD

CP-2

11 11

3"ø HWS

3"ø HWS

3"ø HWS

3"ø HWS

3"ø HWS 1"ø HWS

3"ø HWS

3/4"ø HWR

3"Ø HWS (EXST)

EXISTING HOUSEKEEPING PAD

EXISTING DOMESTIC WATER

1"Ø HWS (EXST)

CP-1

B-1

B-2BP-1

BP-2

PSH-1

CP-2

EXISTING EXPANSION TANK

EXISTING HYDRONIC FILTRATION SYSTEM

5 1

CP-1 10

EXISTING CHIMNEY CAP

ROUTE NEW BOILER FLUE UP

THROUGH CHIMNEY AND DISCHARGE

THROUGH EXISTING CHIMNEY CAP,

SIMMILAR TO EXISTING

EXISTING

EXPANSION

TANK

EXST

EXST

1"ø HWS 3/4"ø HWS

(EXST)

EXST

MINNES

OTA

NA

T I

ON

A L

GUARD

A LW

AY

S

RE

ADY

I H

ER

EB

Y

C

ER

TI

FY

T H

AT

T

H

IS

P

LA

N

SP

EC

IF

IC

AT

IO

N , O

R R

EP

O

R T

W

AS

P R

EP

AR

ED

B

Y M

E O

R U

N D

ER

M

Y D

IR

EC

T

SU

PE

R

VI

SI

O N

A N

D

TH

AT

I

AM

A

D U

LY

L

IC

EN

SE

D

U N

D

ER

T H

E

LA

W S

O F

TH

E

ST

AT

E O

F M

IN

N

ES

O

TA

SHEET NUMBER

DEP

ART

MEN

T O

F M

ILIT

ARY

AFF

AIR

S

H

W Y

0.

6.

F

AX

.6

.7

ST

AT

E O

F M

IN

N

ES

O

TA

FA

C

IL

IT

IE

S

M

AN

AG

EM

EN

T

O

FF

IC

E

LI

TT

LE

F

AL

LS

, M N

D W

N B

Y:

C

KD

B Y:

D

AT

E:

PR

O

JE

C

T N

O

LI

C

D

AT

E:

PL

O

T D

AT

E:

FI

LE

P

AT

H

EN

G

IN

EE

R

8/

/2

1:

:0

PM

C :\U se rs

\F M

O

AD

M S-

\D

C \A

C C

D oc s\ M

N F

M O

\T R

AN

SF

ER

S\

Pr oj ec t F ile s\

Au st in M ec h.

rv t

BO

IL

ER

R

O O

M D

ET

AI

LS

M-102

ST

S

TR

EE

T

NE

AU

ST

IN

M N

NA

TI

O

NA

L G

UA

RD

A

RM

O

RY

BO

IL

ER

R

EP

LA

CE

M

EN

T

AU

ST

IN

, M

IN

NE

SO

TA

AU

G

US

T

, 2

C.

D.

T.

J.

J.

T.

8/

/2

JE

RE

M Y

J.

T

AU

TG

ES

1/2" = 1'-0"M-102

1 REAR BOILER SECTION DETAIL

1/2" = 1'-0"M-102

2 SIDE BOILER SECTION DETAIL

1/2" = 1'-0"M-102

3 PUMP SECTION DETAIL

M-102

5 BOILER ROOM PIPING ISOMETRIC

PIPING DEVICE LEGEND

NOTE # NOTE DESCRIPTION

1 BALL VALVE

2 BALL VALVE-NORMALLY CLOSED

3 CHECK VALVE

4 BALANCING VALVE

5 PRESSURE GAUGE

6 GAS REGULATOR

7 TEMPERATURE GAUGE

8 BUTTERFLY VALVE

9 CONDENSATE NEUTRALIZER

10 SUCTION DIFFUSER

11 TRIPLE DUTY VALVE

12 END-CAP

13 SYSTEM STATIC PRESSURE SENSOR FOR DDC SYSTEM

14 AUTOMATIC AIR VENT

15 HOSE END BALL VALVE-NORMALLY CLOSED

CHILLED WATER

AIR SEPARATOR

1" = 1'-0"M-102

4 CHIMNEY BOILER VENT DETAIL

1/2" = 1'-0"M-102

6 EXPANSION TANK DETAIL

1. CLEAN, FLUSH AND FILL THE ENTIRE HEATING SYSTEM IN ACCORDANCE

WITH SECTION 23 2500 AND 22 2114

MECHANICAL NOTES:

RE

V.

DE

SC

RI

PT

IO

N

DA

TE

AD

D.

REGULATE TO

EQUIPMENT REQUIRED PSI

TO GAS FIRED

EQUIPMENT

TO GAS MAIN

DIRT LEG

THREADED CAP

TRIPLE DUTY VALVE

SUPPLY

RETURN

BALL VALVE, TYP

PRESSURE/ALTITUDE GAUGE

WITH GAUGE VALVES

CONCRETE HOUSEKEEPING PAD

SECURE PUMP WITH FLUSH TYPE

ANCHORS, CAP BOLTS AND GROUT

DRAIN PLUG

ADJUSTABLE FOOT SUPPORT

SUCTION DIFFUSER ALLOW

18" MINIMUM CLEARANCE

FOR STRAINER REMOVAL

CONCENTRIC REDUCER, TYP

PUMP CONNECTOR, TYP

BUTTERFLY VALVE

MINNES

OTA

NA

T I

ON

A L

GUARD

A LW

AY

S

RE

ADY

I H

ER

EB

Y

C

ER

TI

FY

T H

AT

T

H

IS

P

LA

N

SP

EC

IF

IC

AT

IO

N , O

R R

EP

O

R T

W

AS

P R

EP

AR

ED

B

Y M

E O

R U

N D

ER

M

Y D

IR

EC

T

SU

PE

R

VI

SI

O N

A N

D

TH

AT

I

AM

A

D U

LY

L

IC

EN

SE

D

U N

D

ER

T H

E

LA

W S

O F

TH

E

ST

AT

E O

F M

IN

N

ES

O

TA

SHEET NUMBER

DEP

ART

MEN

T O

F M

ILIT

ARY

AFF

AIR

S

H

W Y

0.

6.

F

AX

.6

.7

ST

AT

E O

F M

IN

N

ES

O

TA

FA

C

IL

IT

IE

S

M

AN

AG

EM

EN

T

O

FF

IC

E

LI

TT

LE

F

AL

LS

, M N

D W

N B

Y:

C

KD

B Y:

D

AT

E:

PR

O

JE

C

T N

O

LI

C

D

AT

E:

PL

O

T D

AT

E:

FI

LE

P

AT

H

EN

G

IN

EE

R

8/

/2

1:

:0

PM

C :\U se rs

\F M

O

AD

M S-

\D

C \A

C C

D oc s\ M

N F

M O

\T R

AN

SF

ER

S\

Pr oj ec t F ile s\

Au st in M ec h.

rv t

M

EC

HA

NI

CA

L

SC

HE

DU

LE

S

AN

D

DE

TA

IL

S

M-601

ST

S

TR

EE

T

NE

AU

ST

IN

M N

NA

TI

O

NA

L G

UA

RD

A

RM

O

RY

BO

IL

ER

R

EP

LA

CE

M

EN

T

AU

ST

IN

, M

IN

NE

SO

TA

AU

G

US

T

, 2

C.

D.

T.

J.

J.

T.

8/

/2

JE

RE

M Y

J.

T

AU

TG

ES

BOILER SCHEDULE

GENERAL MECHANICAL ELECTRICAL

EQUIP. TAG LOCATION

GAS FLUID

VENTING SIZE MANUFACTURER MODEL # NOTES VOLTAGE /

PHASETYPE INPUT (MBH) LOW OUTPUT

(MBH)

HIGH OUTPUT

(MBH) BOILER GPM BOILER W.P.D. EWT LWT

B-1 MECH ROOM NATURAL 600 83.571 585 59.0 4.4 120 140 4" LOCHINVAR FTX600 120 / 1 B-2 MECH ROOM NATURAL 600 83.571 585 59.0 4.4 120 140 4" LOCHINVAR FTX600 120 / 1

HYDRAULIC SEPARATOR SCHEDULE

GENERAL MECHANICAL

EQUIP. TAG LOCATION SERVES CONN. SIZE GPM MANUFACTURER MODEL # NOTES

PSH-1 MECH ROOM HEATING WATER 3" 80.0 SPIROTHERM VDX 300 FA

PUMP SCHEDULE

GENERAL MECHANICAL ELECTRICAL

EQUIP. TAG LOCATION SERVES TYPE GPM DESIGN HEAD

(FT) FLUID HP MANUFACTURER MODEL # NOTES VOLTAGE /

PHASE

BP-1 MECH ROOM B-1 IN-LINE 59.0 15 30% PROPYLENE GLYCOL 1/2 BELL & GOSSETT ecocirc XL 20-140 208 / 1 BP-2 MECH ROOM B-2 IN-LINE 59.0 15 30% PROPYLENE GLYCOL 1/2 BELL & GOSSETT ecocirc XL 20-140 208 / 1 CP-1 MECH ROOM BUILDING LOOP BASE MOUNTED 80.0 40 30% PROPYLENE GLYCOL 2 BELL & GOSSETT e-1510 1.5 AD CP-2 MECH ROOM BUILDING LOOP BASE MOUNTED 80.0 40 30% PROPYLENE GLYCOL 2 BELL & GOSSETT e-1510 1.5 AD

NOT TO SCALEM-601

1 BASE MOUNTED PUMP DETAIL

NOT TO SCALEM-601

2 GAS PIPING DIRT LEG

RE

V.

DE

SC

RI

PT

IO

N

DA

TE

AD

D.

MODBUS

BOARD

MODBUS

BOARD

TO DDC BACnet MS/TP

M

BOILER 1 BOILER 2

AO - BOILER OUTLET SETPOINT

DI - BOILER STATUS

DI - BOILER ALARM

DO - BOILER ENABLE

AO - BOILER OUTLET SETPOINT

DI - BOILER STATUS

DI - BOILER ALARM

DO - BOILER ENABLE

TS AI - RETURN TEMP

TS AI - SUPPLY TEMP

DI - PUMP STATUS

ECM

AO - PUMP SPEED

DO - PUMP START/STOP

ΔPS AI - PRESSURE DIFFERENTIAL

P

AI - SYSTEM PRESSURE

NOTE: LOCATE NEAR

EXPANSION TANK

CP-2

CP-1

BP-1 BP-2

* SEE PLANS FOR LOCATION

MDI - PUMP STATUS

ECMAV - PUMP SPEED

BY BOILER

TSTS

TO DDC BACnet MS/TP

CT MDI - PUMP STATUS

ECMAV - PUMP SPEED

BY BOILER

CT

BOILER MFG. HEADER SUPPLY SENSORS

CT DI - PUMP FAULT

M

DI - PUMP STATUS

ECM

AO - PUMP SPEED

DO - PUMP START/STOP

CT DI - PUMP FAULT

A.

1.

2.

3.

B.

1.

2.

3.

4.

5.

a.

6.

a.

b.

c.

d.

C.

1.

2.

3.

4.

5.

6.

a.

BOILER HEATING SYSTEM

Application Boilers: B-1, B-2 Boiler Pumps: BP-1, BP-2, Circulating Pumps: CP-1, CP-2

General Boiler Plant Control and Safety Requirements Each boiler shall operate as a master boiler and shall be provided with the manufacturer's controls to modulate under its own control. The Owner's Building Automation System (BAS) sequence the boilers by sending them setpoint commands.

Boilers shall use internal controls to modulate burner turndown for maximum efficiency.

The Owner's BAS shall manage equal run times for optimum efficiency and life cycle. Run times shall be monitored and managed via totalization of boiler status run times.

The boilers shall run subject to their own internal safeties and controls. The Owner's BAS shall monitor the heating system and its associated alarms.

The BAS shall pull in and monitor the boiler plant system points indicated below through a BACnet MS/TP communication gateway provided by the boiler manufacturer.

Each boiler shall act as a master boiler and shall be equipped with its own BACnet communication gateway card.

In addition to the BACnet integration points, each boiler shall be provided with the following hardwired points.

Boiler Enable (DO) Boiler Alarm (DI) Boiler Runtime/Firing Status (DI) Boiler Outlet Supply Setpoint (AO)

Safety Devices and Alarms:

Boiler Burner Failure Alarm: Signal an alarm if lead boiler burner fails to ignite as commanded. The lead boiler shall be disabled and the lag boiler shall start.

Low Temperature Alarm: Signal alarm when system supply water temperature is ten degrees (adjustable) below set point for more than 30 minutes (adjustable).

High Temperature Alarm: Signal alarm when system supply water temperature is ten degrees (adjustable) above set point for more than 30 minutes (adjustable).

Secondary Loop No-flow Alarm: Determine lead circulating pump status. Enable lag circulating pump and signal alarm if lead circulating pump fails to start as commanded.

Disable lead circulating pump.

Low Water Alarm: When low water is detected, the boiler shall be disabled. The low water cutoff shall provide a visual indicator light of alarm status.

Pump failure alarm: When a pump is commanded ON but the status is OFF.

In the event both the operating and standby pumps fail, retry the pump start-up sequence after a 10 minute (adj.) time delay.

D.

1.

2.

3.

E.

1.

2.

a.

3.

4.

F.

1.

2.

3.

G.

1.

2.

Outside air temperature above 60°F (adjustable):

Boilers shall be off.

All pumps shall be off.

Suppress alarms.

Outside air temperature below 60°F (adjustable):

Boiler pumps shall start/stop with corresponding boiler. Each boiler shall be equipped with their own internal controls to modulate the speed of each variable speed boiler pump to maintain the required temperature drop through the boiler.

Each boiler shall receive a supply setpoint from the Owner's BAS. Each boiler shall modulate under its own controls to maintain the supply setpoint. The Owner's BAS shall enable the boilers as needed to maintain the building loop hot water supply setpoint.

Each boiler shall be equipped with their own header supply sensor in order to modulate under its own control.

Lead circulating pump shall start and run continuously on a call for heat by the boiler plant. Circulating pump variable speed motor shall modulate as required to maintain system differential pressure as monitored by the pressure sensors located on the plans.

Supply water temperature shall be reset with the outside air temperature as follows:

OUTDOOR AIR TEMP (ADJ.) SUPPLY WATER TEMP (ADJ.)

60° F 100° F -10° F 140° F

Heating Water Differential Pressure Control:

The BAS shall measure hot water differential pressure and modulate the hot water pump speed to maintain its hot water differential pressure set-point.

The pumps minimum speed shall not drop below 20% (adjustable).

The differential pressure set-point shall be determined by the test & balance contractor at the time of system balancing. Set-point shall be adjustable to meet the requirements of actual field conditions.

Miscellaneous:

Boiler plant controls shall rotate lead boiler operation and provide lead, lag control of boilers to maintain equal runtimes between the two boilers.

BAS shall provide lead, lag control of the system loop operating and standby pumps. Refer to schedule. Rotate operation of pumps every 250 hours (adjustable).

MINNES

OTA

NA

T I

ON

A L

GUARD

A LW

AY

S

RE

ADY

I H

ER

EB

Y

C

ER

TI

FY

T H

AT

T

H

IS

P

LA

N

SP

EC

IF

IC

AT

IO

N , O

R R

EP

O

R T

W

AS

P R

EP

AR

ED

B

Y M

E O

R U

N D

ER

M

Y D

IR

EC

T

SU

PE

R

VI

SI

O N

A N

D

TH

AT

I

AM

A

D U

LY

L

IC

EN

SE

D

U N

D

ER

T H

E

LA

W S

O F

TH

E

ST

AT

E O

F M

IN

N

ES

O

TA

SHEET NUMBER

DEP

ART

MEN

T O

F M

ILIT

ARY

AFF

AIR

S

H

W Y

0.

6.

F

AX

.6

.7

ST

AT

E O

F M

IN

N

ES

O

TA

FA

C

IL

IT

IE

S

M

AN

AG

EM

EN

T

O

FF

IC

E

LI

TT

LE

F

AL

LS

, M N

D W

N B

Y:

C

KD

B Y:

D

AT

E:

PR

O

JE

C

T N

O

LI

C

D

AT

E:

PL

O

T D

AT

E:

FI

LE

P

AT

H

EN

G

IN

EE

R

8/

/2

1:

:0

PM

C :\U se rs

\F M

O

AD

M S-

\D

C \A

C C

D oc s\ M

N F

M O

\T R

AN

SF

ER

S\

Pr oj ec t F ile s\

Au st in M ec h.

rv t

BL

DG

. A

UT

O M

AT

IO

N

CO

NT

RO

L

SC

HE

M

M-701

ST

S

TR

EE

T

NE

AU

ST

IN

M N

NA

TI

O

NA

L G

UA

RD

A

RM

O

RY

BO

IL

ER

R

EP

LA

CE

M

EN

T

AU

ST

IN

, M

IN

NE

SO

TA

AU

G

US

T

, 2

Au th or

Ch ec ke r

8/

/2

JE

RE

M Y

J.

T

AU

TG

ES

M-701

1 HOT WATER BOILER PLANT

BOILER PLANT DDC POINTS LIST

POINTS NAME DI DO AI AO DV AV TREND SCHED ALARM GRAPHIC

B-1 Enable X X X B-2 Enable X X X B-1 Runtime Status X X X B-2 Runtime Status X X X B-1 Fire Rate X X X B-2 Fire Rate X X X B-1 Inlet Temp X X X B-2 Inlet Temp X X X B-1 Outlet Temp X X X B-2 Outlet Temp X X X B-1 Outlet Temp Setpoint X X X B-2 Outlet Temp Setpoint X X X B-1 Alarm Status X X X X B-2 Alarm Status X X X X JCI System Supply Temp X X X JCI System Return Temp X X X Outside Air Temp (global) X X Heating System Static Pressure X X X Boiler Status Code, per Boiler X X Boiler Blocking Code per Boiler X X Boiler Lockout Coder per Boiler X X BP-1 Status X X X BP-2 Status X X X CP-1 Start/Stop X X X CP-1 Status X X X CP-1 Fault/Alarm X X X CP-1 Speed X X X CP-2 Start/Stop X X X CP-2 Status X X CP-2 Fault/Alarm X X X CP-2 Speed X X X System Pressure Differential X X X System Pressure Diff. Setpoint X X System Loop no Flow Alarm X High System Supply Temp X Low System Supply Temp X

RE

V.

DE

SC

RI

PT

IO

N

DA

TE

AD

D.

9 10

EXPANSION TANK AND PIPING

AS SHOWN TO REMAIN

HYDRONIC FILTRATION SYSTEM

AND PIPING AS SHOWN TO REMAIN

M-102

EXPANSION TANK AND PIPING

AS SHOWN TO REMAIN

HYDRONIC FILTRATION SYSTEM

AND PIPING AS SHOWN TO REMAIN

MINNES

OTA

NA

T I

ON

A L

GUARD

A LW

AY

S

RE

ADY

I H

ER

EB

Y

C

ER

TI

FY

T H

AT

T

H

IS

P

LA

N

SP

EC

IF

IC

AT

IO

N , O

R R

EP

O

R T

W

AS

P R

EP

AR

ED

B

Y M

E O

R U

N D

ER

M

Y D

IR

EC

T

SU

PE

R

VI

SI

O N

A N

D

TH

AT

I

AM

A

D U

LY

L

IC

EN

SE

D

U N

D

ER

T H

E

LA

W S

O F

TH

E

ST

AT

E O

F M

IN

N

ES

O

TA

SHEET NUMBER

DEP

ART

MEN

T O

F M

ILIT

ARY

AFF

AIR

S

H

W Y

0.

6.

F

AX

.6

.7

ST

AT

E O

F M

IN

N

ES

O

TA

FA

C

IL

IT

IE

S

M

AN

AG

EM

EN

T

O

FF

IC

E

LI

TT

LE

F

AL

LS

, M N

D W

N B

Y:

C

KD

B Y:

D

AT

E:

PR

O

JE

C

T N

O

LI

C

D

AT

E:

PL

O

T D

AT

E:

FI

LE

P

AT

H

EN

G

IN

EE

R

8/

/2

1:

:0

PM

C :\U se rs

\F M

O

AD

M S-

\D

C \A

C C

D oc s\ M

N F

M O

\T R

AN

SF

ER

S\

Pr oj ec t F ile s\

Au st in M ec h.

rv t

M

EC

HA

NI

CA

L

DE

M

O

LI

TI

O

N

PL

AN

MD-101

ST

S

TR

EE

T

NE

AU

ST

IN

M N

NA

TI

O

NA

L G

UA

RD

A

RM

O

RY

BO

IL

ER

R

EP

LA

CE

M

EN

T

AU

ST

IN

, M

IN

NE

SO

TA

AU

G

US

T

, 2

C.

D.

T.

J.

J.

T.

8/

/2

JE

RE

M Y

J.

T

AU

TG

ES

1/2" = 1'-0"MD-101

1 MECH DEMOLITION PLAN

MD-101

2 DOMESTIC FILL DEMOLITION

MECHANICAL DEMOLITION NOTES

NOTE # NOTE DESCRIPTION

1 REMOVE BOILER AND ALL RELATED PIPING, VALVES AND CONTROLS

2 REMOVE PUMP AND ALL RELATED PIPING, VALVES AND CONTROLS

3 REMOVE AIR SEPARATOR AND RELATED PIPING

4 REMOVE HYDRONIC PIPING AS SHOWN, PREP REMAINING PIPING FOR CONNECTION

TO NEW PIPING

5 REMOVE HYDRONIC PIPING AS SHOWN

6 REMOVE BOILER FLUE, CHIMNEY TO REMAIN

7 REMOVE BOILER VENT/FLUE PIPING AS SHOWN

8 REMOVE BOILER INTAKE VENTING AS SHOWN, PREP REMAINING VENTING FOR

CONNECTION TO NEW VENTING

9 REMOVE NATURAL GAS PIPING AS SHOWN, PREP REMAINING PIPING FOR

CONNECTION TO NEW PIPING

10 REMOVE PROPANE GAS PIPING AS SHOWN, CAP REMAINING PIPE

11 REMOVE DOMESTIC WATER FILL PIPING AND VALVES AS SHOWN, CAP PIPING TO

ALLOW DOMESTIC WATER TO CONTINUE SERVING THE BUILDING

12 REMOVE DOMESTIC MAKE-UP WATER PIPING AND CAP REMAINING PIPE AS SHOWN

RE

V.

DE

SC

RI

PT

IO

N

DA

TE

AD

D.

M-101 - HYDRONIC FLOOR PLAN
M-102 - BOILER ROOM DETAILS
M-601 - MECHANICAL SCHEDULES AND DETAILS
M-701 - BLDG. AUTOMATION CONTROL SCHEM.
MD-101 - MECHANICAL DEMOLITION PLAN