EXHIBIT B2 - Miles City CLC Agency Specific Requirements 23 Jun 23_B.pdf

PDF 12 MB Posted

Attached to
DEPARTMENT OF VETERANS AFFAIRS - MILES CITY, MT - COMMUNITY LIVING CENTER
Solicitation number
36C24W23R0056
Issued by

About this file

This exhibit file pertains to a solicitation for community living center services at the Department of Veterans Affairs medical center in Miles City, Montana. The related solicitation number is 36C24W23R0056 and seeks to provide food services, housekeeping, and activities for veterans residing at the community living center. Responses are due by July 22, 2023 and the period of performance is one base year with four one-year options running from October 1, 2023 through September 30, 2028. The solicitation is set aside for service-disabled veteran-owned small businesses and offers a fixed price contract award. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20 is the contracting agency.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

II. U.S. Department of Veterans Affairs Office of Information and Technology IT Operations and Services

Solution Delivery CBOC Design Template—v1_1

Section 6. Room Finishes, Door and Hardware Schedule I

Reference Source: U.S. Department of Veterans Affairs Office of Construction & Facilities Management - Room Finishes, Door, & Hardware Schedule Program Guide PG18-14 4/10/2017; Revised 12/2018

Section 1 – General

Section 2 – Doors and Hardware

Section 3 – Room Finishes, Door and Hardware Schedule

Section 7. Barrier Free Design Standards

Section 8. FLAGPOLES 10 75 00

SECTION 10 75 00

FLAGPOLES

SPEC WRITER NOTE:

1. Use this section only for NCA projects.

2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs.

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies materials, shipping and delivery protection, storage, handling, and installation of flagpoles to be installed in the project area indicated. Flagpoles shall be deluxe internal halyard fixed high dimensional, ground set, cone tapered, seamless tube flag poles together with concealed halyard, revolving truck, finial ball, flashing collar, anchors, fittings, and accessories.

1.2 RELATED WORK

A. Excavation and backfill: Section 31 20 00, EARTH MOVING.

B. Concrete for ground set flagpole: Section 03 30 53, (SHORT FORM) CAST-IN-PLACE

CONCRETE.

1.3 SUSTAINABILITY REQUIREMENTS

A. Materials in this section may contribute towards contract compliance with sustainability requirements. See Section 01 81 11, SUSTAINABLE DESIGN REQUIRMENTS, for project // local/regional materials, // low-emitting materials, // recycled content, // certified wood // _____// requirements.

B. Biobased Material: For products designated by the USDA’s BioPreferred® program, provide products that meet or exceed USDA recommendations for biobased content, subject to the products compliance with performance requirements in this Section.

For more information regarding the product categories covered by the BioPreferred® program, visit http://www.biopreferred.gov.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND

SAMPLES.

B. Shop Drawings: Flagpole details of all parts & accessories, and list of all materials, including but not limited to: base with support plate and grounding spike, lightning kit, pole, flash collar, revolving truck, internal halyard, cable assembly, winch detail w/lock, hooks, beaded retainer ring, counterweight, winch handle and finial ball, along with construction and installation details. Flagpole components shall match those for the main pole.

C. Manufacturer's Literature and Data: Flagpole, base and all parts and accessories.

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to extent referenced.

Publications are referenced in text by the basic designation only. Comply with http://www.biopreferred.gov/ applicable provisions and recommendations of the following, except as otherwise shown or specified.

SPEC WRITER NOTES:

1. Remove reference citations that do not remain in

Part 2 or Part 3 of edited specification.

2. Verify and make dates indicated for remaining citations the most current at date of submittal;

determine changes from date indicated on the TIL download of the section and modify requirements impacted by the changes.

B. American Society for Testing and Materials (ASTM):

A167-99 (R2009) Stainless and Heat-resisting Chromium-Nickel Steel Plate, Sheet and Strip

B209-10 Aluminum and Aluminum Alloy-Sheet and Plate

B241/B241M-12 Aluminum and Aluminum-Alloy Seamless Pipe and Seamless

Extruded Tube

C. American National Standards Institute Inc. (ANSI):

ANSI/NAAMM 1001-97 Guide Specifications for Design of Metal Flagpoles Manual.

1.6 QUALITY ASSURANCE

A. Manufacturer’s Qualifications: Firms regularly engaged in the manufacture of metal flagpoles and accessories, of types, size and configurations required, whose products have been is satisfactory use in similar service for not less than 5 years.

B. Installer’s Qualifications: Firm with at least 3 years of successful installation experience on projects having flagpole installation work similar to that required for this project.

SPEC WRITER NOTE:

1. Modify the following paragraph to describe the various flagpoles for this project. Provide the size, wind speeds, flag size and wall thickness for each flagpole size to be provided. Wind speed shall be the minimum specified in the wind speed chart for the project location.

2. Modify these specifications and coordinate with the drawings, details and notes to ensure that the flagpole foundation has been sized according to the applicable wind load conditions for the respective flags and poles, and that the foundation design has been performed by a qualified structural engineer, based upon the soil conditions, and installation method for the flagpole.

3. The spec writer shall ensure that the design A/E has had a professional engineer do the foundation design and specify all the size, reinforcing, and installation parameters. The drawings and specifications should be modified and coordinated to reflect the designed foundation parameters.

C. Design Criteria: Flagpole shall be designed to withstand the wind speeds and conditions indicated herein for the specific flagpole and flag sizes indicated.

The //7.6 m//(//25// foot) flag pole shall be designed based upon a minimum sustained 160 kmph (//100// mph) wind velocity and minimum wind gust velocity of

210 kmph (//130// mph) when flying a flag 1.5m x 6.5m (//5’ x 8’//) in size in accordance with ANSI/NAAMM 1001-97, with the pole wall thickness being in conformance with the design standards but with a minimum wall thickness of 5mm

(//0.188// inches), whichever causes the stronger flagpole. The flagpole foundation(s) has/have been designed based upon applicable conditions for the project specific location of the respective flagpole.

1.7 PROTECTION AND SHIPPING

A. Package flagpole for shipping with spiral wrap protective covering and pack in shipping tubes acceptable to owner’s designated representative and per manufacturer’s recommendations.

PART 2 - PRODUCTS

SPEC WRITER NOTE:

1. Make material requirements agree with applicable requirements specified in the referenced

Applicable Publications. Update and specify only that which applies to the project.

2.1 MATERIALS

A. Aluminum, Extruded: ASTM B241, alloy 6063 - T6.

B. Aluminum, Plate and Sheet: ASTM B209, alloy ll00.

C. Stainless Steel: ASTM A167, Class 302 or 304.

2.2 FABRICATION

A. Fabricate flagpole of seamless extruded aluminum tube, uniform conical taper of approximately 1 in 70, one centimeter in seventy centimeters (one inch in every 6 feet). Taper shall not exceed 50 percent of outside diameter of pole. When flagpoles are shipped in more than one section, provide self-aligning sleeves for field joint.

B. Base: Aluminum plate or stainless steel, of stock design similar to that shown.

C. Finial Ball: 2 mm (0.0747 inch) thick spun aluminum sphere, with seams of ball welded flush and watertight. Mount ball on threaded rod to fit truck. Diameter of ball shall be approximately same as pole butt diameter.

D. Truck: Equip pole with extra heavy, revolving, non-fouling, ball bearing type truck with cast aluminum body and designed to accept an ornament on top.

E. Halyards: Internal type cable assemblies. 3 mm (1/8”) and/or 5 mm (3/16”) stainless steel aircraft cable incorporating a stainless steel swivel, upper cable section, and flag arrangement with cable and two stainless steel quick links and two stainless steel swivel snaps. The cable assemblies shall be constructed to fit the flagpole size and flag size specified.

F. Beaded Retainer Ring and Counterweights: Provide as recommended by manufacturer based on the pole size, flag size and design wind velocity. Provide recommended connection accessories.

G. Internal Halyard Accessories: Furnish and install a gearless, self-locking at any point, direct drive winch that does not require welding for installation and does not require monthly application of lubrication and is attached to the pole with one stainless steel bolt on the back side of the pole. The unit shall be silver in color. Provide locking mechanism and two keys. Provide a winch handle designed for the unit. Pole shall be reinforced through the area of the winch opening by the manufacturer’s standard reinforcement method.

H. Foundation Tube: Hot dipped galvanized corrugated steel tube. Tube shall have a steel base plate and centering wedges and support plate for connection of lightening kit. Bottom plate shall be a minimum of 5 mm (3/16”) thickness.

SPEC WRITER NOTES:

1. Unless specifically directed otherwise by the PM, all the flagpoles shall be designed and installed with the Manufacture's best lightening kit system.

I. Lightning Kit: Provide a complete kit (maximum protection available) for each pole.

Configuration and components for the kit shall be as recommended by the pole manufacturer for use on the pole selected.

2.3 FINISH

A. Finish exposed surfaces of flagpoles.

B. Flagpole shaft: Satin brushed aluminum, then heavily waxed.

C. Finial ball: Gold anodized aluminum, then heavily waxed.

D. Base// and cleats//: Finish to match flagpole.

//E. Stainless Steel (base): As recommended by flagpole manufacturer. //

PART 3 - EXECUTION

3.1 INSPECTION

A. Verify that concrete foundation work is correctly sized and positioned.

B. Repair or replace defective foundation work as directed by owner’s designated representative.

3.2 PREPARATION

A. Coat portions of flagpole below grade and in surfaces in contact with dissimilar metals with black asphaltum paint, as recommended by manufacturer.

3.3 INSTALLATION

A. Install galvanized, corrugated steel sleeve or tube of detailed length, welded to steel base plates for installation in concrete. Set base plate and Lightning Kit in place before concrete is placed. Follow the manufacturer's recommendations for the installation of the lightning kits.

B. Install foundation plate and centering wedges for flagpole base in concrete base and fasten.

C. Install concrete foundation work to dimensions indicated in accordance with Section

033053, SHORT FORM CAST-IN-PLACE CONCRETE.

D. Wrap top of sleeve with two layers of asphalt felt for distance of 600 mm (2 feet) down.

E. Install flagpole in accordance with manufacturers written installation instructions. Install pole plumb using centering wedges.

F. Backfill and compact excavation around flagpole base in accordance with Section

312000, EARTH MOVING.

G. Fill and thoroughly compact dry fine sand into the space between pole and steel sleeve and tamp to within 50 mm (2 inches) of top of sleeve.

H. Remove temporary wood positioning wedges and fill upper 50 mm (2 inch) space between pole and steel sleeve with specified or manufacturer recommended waterproofing compound.

I. Install fittings in accordance with manufacturer’s written installation instructions.

J. Check and adjust installed fittings for smooth operation of halyards.

3.2 LIGHTNING ROD

A. Weld lightning ground rod of 19 mm (3/4-inch) diameter galvanized steel to base plate at bottom of sleeve or tube, and to steel support plate at grade.

3.3 CLEANUP

A. After installation, carefully clean the flagpole and appurtenances, removing all dirt stains, and all other incident defacements.

1. Fabricator should be contacted regarding the use of any cleaners and must approve of them before use.

2. Protection of Finished Work: Flagpoles for this project shall be protected at all times during construction.

B. Clean up area of excess material and debris.

- - - E N D - - -

Section 9. Exterior Signage

Note, the following are general signage requirements, the final sign types and quantity of signs for the project will depend on the selected site.

Also reference VA TIL ‘Signage and Wayfinding’ section for additional info such as signage programming, planning, placement, etc.

Diagrams are not to scale.

Section 10. Interior Signage

Note, the following are general signage requirements, specifics will be selected based on final building design/ layout.

Also reference VA TIL ‘Signage and Wayfinding’ section for additional info such as signage programming, planning, placement, etc.

Diagrams are not to scale.

SIGNAGE SCHEDULE FOR FINISHES

SIGN SYSTEMS

SIGN INSTALLATION

SIGN IN-03.01 ROOM NUMERAL IDENTIICATION

SIGN IN-04.01 ROOM NAME PRIMARY, STATIC.

SIGN IN-04.02 ROM NAME SECONDARY, STATIC

SIGN IN-04.03 ROOM NAME PRIMARY, INSERT

SIGN TYPE IN-04.04 ROOM NAME SECONDARY, INSERT

SIGN TYPE IN-09 RESTROOM

SIGN TYPE IN-13.01 PRIMARY BLADE, LAYOUT A

SIGN IN-13 SECONDARY BLADE

SIGN IN-14XX WALL DIRECTIONALS

SIGN – CEILING MOUNTED SIGN

SIGN – SOFFIT SIGNAGE

SIGN – IN-17.06 ELEVATOR DIRECTORY

SIGN IN-01.01.03 ELEVATOR EVACUATION MAP

SIGN IN-17.07 ELEVATOR NUMERICAL IDENTIFICATION

SIGN DIMENSIONAL LETERS

SIGN IN-01.11 INTERIOR STAIR LEVEL IDENTIFICATION

SIGN IN-01.36 FIRE EXTINGUISHER LOCATE

SIGN IN-01.XX HAZARDS

SIGN IN-01.XX PROHIBIT, INSTRUCTIONAL AND CONTROL

Section 11. HVAC Design Manual (Excerpted)

6-101

Section 12. Physical Security, Key Locks, CCTV System, Public Address/Mass Notification

Requirements

The Physical Security Requirements for PACS can be found in the Physical Security Resiliency and Design Manual Section

10, Appendix B and VA Handbook 0730 . PACS readers and Controller Boards must be on the Approved Product List and compatible the Lenel S2/OnGuard system utilized at the Medical Center. Dual Authentication readers (Card and PIN) are required for Telcom Rooms. General entry perimeter doors are required to have single authentication (Card Only) access. Door Contacts for all PACS enabled doors are required. A standard commercial intrusion detection and panic alarm system for third party monitoring is required.

Key locks for all controlled spaces must be compatible with 6 or 7 pin cylindrical cores as required by VA Handbook

0730.

CCTV Camera systems are required by the Physical Security Resiliency and Design Manual Section 10, and Appendix B as well as VA Handbook 0730 for both internal and external property monitoring. The CCTV system must be compatible with the Milestone software system used at the Medical Center. The cameras must be on the Approved Product List.

CCTV systems must be integrated via hardwire internet at the main facilities SCC and will be remotely viewable at the main SCC.

CCTV will be provided for all exterior doors, lobby, and parking locations that are contiguous with CBOC location. CCTV coverage will provide unobstructed coverage of these locations and will be sufficient in quality and storage that readability of license plates and physical identifiable features are readily visible in low light conditions and will have memory storage capability of no less than 90 days.

CCTV system will NOT have audio recording capabilities in check in areas, hallways adjacent to medical treatment areas.

There are no audio recording restrictions for external cameras or quasi-public locations.

Exact CCTV camera locations and angles will be dependent upon finalization of facility build/layout.

A Public Address/Mass Notification system is required by the Physical Security Resiliency and Design Manual Section 10, Appendix B.

Public Safety DAS/Repeater are requested by the VA police to aid in an emergency response. The system would need to be Dual Band (400 MHz and 700/800MHz) compatible and programmed to work on the VA assigned frequencies for both the Federal Radio System and the State/Municipal system. VA Police have learned from experience that not incorporating a radio system into the build greatly hampers VA Police and other First Responders communication needs.

https://www.wbdg.org/FFC/VA/VADEMAN/ARCHIVES/dmPhySec_1_2021.pdf https://www.wbdg.org/FFC/VA/VADEMAN/ARCHIVES/dmPhySec_1_2021.pdf https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=&ved=2ahUKEwi4q9ya0vzzAhU2oXIEHeTnAn0QFnoECAoQAQ&url=https%3A%2F%2Fgovshop.com%2Fmedia%2Fopportunities%2Fdocuments%2Fc64f0be6294068dd88dc66dc68e0a385attachment-15-physical-security-and-resiliency-design-manual-appxb.xlsx&usg=AOvVaw0lKZLcNFCO-1MT42INFVoQ file:///C:/Users/VHF58E~1/AppData/Local/Temp/1/MicrosoftEdgeDownloads/98b369b2-9b6c-4772-964a-86d1442bc4c9/Handbook_0730-1_20_Aug_2004.pdf https://www.idmanagement.gov/docs/apl-10112-lenel.pdf file:///C:/Users/VHF58E~1/AppData/Local/Temp/1/MicrosoftEdgeDownloads/98b369b2-9b6c-4772-964a-86d1442bc4c9/Handbook_0730-1_20_Aug_2004.pdf file:///C:/Users/VHF58E~1/AppData/Local/Temp/1/MicrosoftEdgeDownloads/98b369b2-9b6c-4772-964a-86d1442bc4c9/Handbook_0730-1_20_Aug_2004.pdf https://www.wbdg.org/FFC/VA/VADEMAN/ARCHIVES/dmPhySec_1_2021.pdf https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=&ved=2ahUKEwi4q9ya0vzzAhU2oXIEHeTnAn0QFnoECAoQAQ&url=https%3A%2F%2Fgovshop.com%2Fmedia%2Fopportunities%2Fdocuments%2Fc64f0be6294068dd88dc66dc68e0a385attachment-15-physical-security-and-resiliency-design-manual-appxb.xlsx&usg=AOvVaw0lKZLcNFCO-1MT42INFVoQ file:///C:/Users/VHF58E~1/AppData/Local/Temp/1/MicrosoftEdgeDownloads/98b369b2-9b6c-4772-964a-86d1442bc4c9/Handbook_0730-1_20_Aug_2004.pdf https://www.wbdg.org/FFC/VA/VADEMAN/ARCHIVES/dmPhySec_1_2021.pdf https://www.google.com/url?sa=t&rct=j&q=&esrc=s&source=web&cd=&ved=2ahUKEwi4q9ya0vzzAhU2oXIEHeTnAn0QFnoECAoQAQ&url=https%3A%2F%2Fgovshop.com%2Fmedia%2Fopportunities%2Fdocuments%2Fc64f0be6294068dd88dc66dc68e0a385attachment-15-physical-security-and-resiliency-design-manual-appxb.xlsx&usg=AOvVaw0lKZLcNFCO-1MT42INFVoQ